The U.S. aircraft register, updated daily
Parts · Electrical power

Test Button

19 failure reports named the test button in the last ten years, 19 since 2019, most often on the Airbus A300; the condition most often found was "broken". 2 FAA approvals let 2 companies make a replacement test button, B/E Aerospace, INC. holding the most (1).

Reports by year

0124522019412552026
Reports by year, as a table
reports
20192
20204
20211
20222
20245
20265

How it failed the condition found, last ten years

broken5inoperative3corroded1damaged1dirty1failed1faulted1intermittent1malfunctioned1no test1
Conditions found, as a table
reports
broken5
inoperative3
corroded1
damaged1
dirty1
failed1
faulted1
intermittent1
malfunctioned1
no test1

Engines most often reporting it

Approved replacement parts 2 parts manufacturer approvals

A parts manufacturer approval (PMA) lets a company other than the aircraft's maker make a test button and sell it as an approved part for the models named. These are the companies holding such approvals for a test button:

For these models most: Boeing 787 Dreamliner (2).

MakerPartReplacesFitsGrantedStatus
B/E Aerospace, INC.TEST BUTTON ASSY, OXYGEN 4572022-001(4572022-001)Boeing 787-82013-06-19current
B/E AerospaceTEST BUTTON ASSY, OXYGEN 4572022-0014572022-001Boeing 787-82012-07-12current

Sources: the FAA's service difficulty reports since 1995 (a report is a part that failed and was fixed, as filed by an airline, repair station or owner; the count shows reporting as much as reliability) and the parts manufacturer approvals in the FAA's Dynamic Regulatory System. The part name is the reporters' and the approval holders' own words, reduced to the first plain words so that spellings meet.