Who holds what · as the FAA records the nameAvcon Industries INC
Named as the FAA publishes it on its approvals.
Holds 147 approved modifications, most of them for the Beechcraft B300 King Air 350. Approved to make 1 class of equipment. Holds 388 approvals to make replacement parts. FAA spelling: AVCON INDUSTRIES INC.
Approved modifications 147 · newest first
2026-04-20SA01975WI · Installation of Fuselage Camera Ports with or without Mission Power System · 208, 208B 2026-03-03ST01984WI · Installation of Stores Carriage Provisions and Underwing Stores · 60 2025-09-15ST12087CH · Installation replacement Cabin/Cockpit Handheld Fire Extinguishers · 45, 24, 24A 2025-07-24SA04797NY · Atmospheric Research Aircraft Modification · B300 2025-07-24SA04749NY · Atmospheric Research Aircraft Modification · B300 2025-05-15SA2300CE · Installation of Removable External Baggage Compartment. · 200, 200C, A200 (C-12A) 2024-12-11SA04744NY · Installation of New External Radar Pod with Retractable EO/IR Sensor Lift Mechanism · 208B 2024-09-12SA04660CH · Installation of large diameter nose belly radar pod with retractable EO/IR sensor mechanism and optional SATCOM radome. · B300, B300C 2024-07-02SA04639CH · Incorporation of an Avcon External Belly Mounted Radar Pod in accordance with FAA approved Master
Data List... · 208, 208B 2023-07-24SA01924WI · Installation of an External Pod and Retractable EO/IR Sensor Lift Mechanism. · 200, 200C, A200 (C-12A) 2023-06-01SA04581CH · INSTALL NOSE EXTENSION WITH EO/IR TURRET LIFT MECHANISM AND EXTERNAL BELLY RADAR POD · B300, B300C 2023-03-29SA04598CH · Incorporation of an Avcon External Radar POD and SATCOM Radome · B300, B300C 2022-07-29SA00415WI · Installation of a baggage door. · B90, C90, C90A 2021-10-12SA04476CH · Installation of External Belly Radar POD and Upper SATCOM Radome in accordance with Avcon Industries, Inc. Master... · B300, B300C 2021-10-12ST01881WI · Installation of the Garmin GTS 8000 TCAS II System and Dual GTX 3000 Transponders for ADS-B Out Compliance and... · 35, 35A (C-21A), 36 2021-06-11SA04209NY · Increasing the Maximum Zero Fuel Weight (MZFW) from 13,000 to 13,400 pounds · B300, B300C, B300C (MC-12W) 2021-05-06SA01965WI · Installation of Wing Tip Hard Point Provisions · 200, 200C, 300 2020-09-29SA01953WI · Installation of Retractable EO/IRSensor (large) Mechanism and External Pod · B300, B300C 2020-09-14SA03698AT · Installation of a Supplemental DC Power for an Isolated Instrumentation Bus · 200, 200C, B200 2020-08-28ST01926WI · Interface of factory installed FC-530/FC-535 Autopilot System to Single/Dual GTN 750/650 Navigators. · 35, 35A (C-21A), 36 2019-12-20SA2429CE · Provisions for the installation of Tandem cameras. · 100, 200, 200C 2019-09-04SA04178NY · Installation of Underwing Hard Points · 200, 200C, 200CT 2019-06-21SA04386CH · Incorporation of Avcon External Radar Pod with Ku Band Antenna Radome and Infrared Signature Suppression System in... · B300 2019-04-23ST00912WI · Installation of Model 31A interior as refurbishment to retrofit Learjet models. · Learjet 36A, Learjet 31, Learjet 35 2018-11-21SA01893WI · Installation of a Retractable EO/IR Sensor Mechanism · B300, B300C 2018-11-19ST00284DE-D · Installation of Special Missions Power, 9Kva, 3 phase inverter, 2Kva 230Vac, 50Hz Inverter and 29Vdc power. · Learjet 36, Learjet 36 Series, Learjet 36A 2018-11-19ST01122SE-D · Group aircraft approval for Reduced Vertical Separation Minimum (RVSM). · 35, 35A (C-21A), 36 2018-10-18SA2576CE · Installation of Marquardt target towing system (high speed operation). · Learjet 35A (C-21A), Learjet 36A 2018-10-18SA1509CE · Installation of instrumentation rack and inverter rack in baggage compartment. · Learjet 35, Learjet 35A (C-21A), Learjet 36A 2018-10-18SA1505CE · Wing pylon external stores installation. · Learjet 36A, Learjet 35A (C-21A) 2018-10-18SA2476CE · Installation of Learjet Model 36A fuselage fuel cells. · 35, 35A (C-21A) 2018-10-18SA1606CE · Attachment of Hayes TRX-3 tow target system or Hayes Universal tow targets. · Learjet 36, Learjet 35A (C-21A), Learjet 36A 2018-10-18SA1670CE · Installation of wing external stores attach points on bottom surface of both wings. · Learjet 35, Learjet 36A, Learjet 25F 2018-10-18SA1507CE · Installation of electronic consoles on cabin seat rails. · Learjet 35A (C-21A), Learjet 35, Learjet 36 2018-10-18SA1894CE · Installation of dual J.E.T. SI-3003B, 3-phase, 400 H2, 3000 VA inverters. · Learjet 35A (C-21A), Learjet 36, Learjet 36A 2018-10-18SA1508CE · Installation of mounting plates in the tail cone for mounting of electrical inverters. · Learjet 35A (C-21A), Learjet 35, Learjet 36A 2018-10-18SA2018CE · Attachment of Marquardt Target Towing System. · Learjet 35, Learjet 36A, Learjet 36 2018-10-18SA2475CE · Installation of provisions for a cabin centerline mounted camera with an in-flight opening door · 35, 35A (C-21A), 36 2018-10-18SA2007CE · Installation of 9KVA, 3 phase inverter system, consisting of 3 J.E.T. SI-3000A Inverters · Learjet 36A, Learjet 35A (C-21A), Learjet 35 2018-10-18SA1533CE · Installation of a Maritime Patrol surveillance system. · Learjet 36A, Learjet 36, Learjet 35 2018-10-18SA1515CE · Radome installation on belly of aircraft and structural provisions for an airborne surveillance radar. · Learjet 36A, Learjet 36, Learjet 35A (C-21A) 2018-10-18ST00294WI · Installation of a gravel runway operations kit. · Learjet 31A, Learjet 31 2016-12-06SA2428CE · Installation of provisions for a scanner. · 200, 200CT, 200T 2015-04-27ST01783WI · Installation of Internal Wing Hardpoints · 25, 25A, 25B 2015-04-16SA1746CE · Installation of external baggage compartment on bottom of the fuselage. · 200, 200C, B200 2015-03-30SA2449CE · Install P/N 36213-103 removable external baggage compartment. · 100, A100, A100A 2013-01-16SA3458WE · Modification of fuselage to install camera window, with the option to allow unpressurized operations when the... · 421C 2012-03-02SA2795CE · Install optical glass window in emergency exit door. · 200, 200CT, 200T 2011-03-08ST01622WI · Installation of provisions of Special Missions Equipment as installed on the Bombardier Challenger aircraft in... · CL-600-2B16 (CL-604) 2010-11-16SA900NW · : Installation of the Mark II performance system, including recontoured wing leading edge, recontoured flap... · 25, 25A, 25B 2010-11-16SA253NW · Installation of the Mark II performance system, including recontoured wing leading edge, recontoured flap leading... · Learjet 24, Learjet 24A 2010-11-16SA841NW · Installation of the Mark II performance system, including recontoured flap leading edge, wing vortex generator... · 24B, 24B-A, 24D 2010-11-16SA225NW · Installation of the Mark II performance system, including recontoured wing leading edge, recontoured flap leading... · 25, 25A, 25B 2010-11-16SA232NW · Installation of the Mark II performance system, including recontoured wind leading edge, recontoured flap leading... · 24B, 24B-A, 24D 2010-11-16SA237NW · Installation of the Mark II performance system, including recontoured wing leading edge, recontoured flap leading... · Learjet 23 2010-11-15SA1489CE · Removal of 24-inch wide executive door and installation of 36-inch wide cargo door per AVCON Drawing List 36000... · 25, 25A, 25B 2010-06-03SA1553NM · Installation of one or two 90 US gallons fuselage auxiliary fuel tank(s), in accordance with Branson List of... · Learjet 55C, Learjet 55B, Learjet 55 2010-06-03SA5516SW · Install Sperry SPZ500LR Automatic Flight Control System in accordance with Dee Howard Drawing List No. 46, Rev. D,... · Learjet 24D, Learjet 24B, Learjet 24 2010-06-03SA2446SW · Installation of cabin door closing system in accordance with Drawing List No. 34 dated 3/17/80 or later FAA approved... · Learjet 36A, Learjet 25A, Learjet 24 2010-06-03SA2715SW · Installation of access doors in engine nacelle according to Drawing 375201, Revision A, dated 1/13/78, or later FAA... · Learjet 25B, Learjet 25A, Learjet 25 Series
The first 60 of 147.
Replacement parts approved 388 parts manufacturer approvals, 388 current
A parts manufacturer approval lets a company make a replacement part for someone else's aircraft or engine and sell it as an approved part. This company's approvals are mostly for other and general (230), airframe structure (76), cabin, seats and restraints (34).
2010-02-03Cargo Pod 36205 · replaces Modification Part · PA-31P, PA-31T, PA-31T1 2010-02-03Learjet MDL 1078 · replaces Modification Part · Model 35/36 Series Listed on AML 1078, Issued... 2010-02-03Cargo Interior 2721 · replaces Modification Part · Dassault Falcon 2010-02-03Provision Kit 8034 · replaces Modification Part · B200T 2010-02-03Cargo Restraint System LJ60000 · replaces Modification Part · 24 Series thru Model 24D-A, 25 Series thru Model 25C 2010-02-03Window Plugs 35332 · replaces Modification Part · 35, 35A, 36 2010-02-03Inverter Mount 1006 · replaces Modification Part · 25, 25A, 25B 2010-02-03Inverter Rack 1001 · replaces Modification Part · 65, A65, 65-80 2010-02-03FLIR 1062 · replaces Modification Part · 35, 35A, 36
The first 80 of 388. All part makers.
Equipment approvals technical standard order authorisations
Source: FAA Dynamic Regulatory System (type certificate data sheets, supplemental type certificates, parts manufacturer approvals, technical standard order authorisations). An organisation's name is as the FAA spelled it on each record; related spellings are separate pages.