The U.S. aircraft register, updated daily
FAA orders · airworthiness directive · current

2019-08-11: Wings

FAA order 2019-08-11 is an airworthiness directive in force since July 11, 2019. The FAA's subject line: Wings. It names Bombardier CL-600 Challenger and CRJ: about 1,655 aircraft on the U.S. register today, though an order usually covers particular versions or serial numbers rather than every one. System: landing gear.

What it applies to as the FAA lists it

Kind of product
Aircraft
Makes
Bombardier Inc.
Models
CL-600-2B19 (Regional Jet Series 100), CL-600-2B19 (Regional Jet Series 440)
On this site
Bombardier CL-600 Challenger and CRJ 1,655 registered

Dates and paperwork

In force since
July 11, 2019
Published
June 6, 2019 (signed May 15, 2019)
Docket
FAA-2018-0801
Replaces
2008-24-14
Status
Current
The FAA's document
Read the order on the FAA's site

The FAA's summary their words, unchanged

We are superseding Airworthiness Directive (AD) 2008-24-14, which applied to all Bombardier, Inc., Model CL-600-2B19 (Regional Jet Series 100 & 440) airplanes. AD 2008-24-14 required revising the instructions for continued airworthiness to incorporate certain airworthiness limitations for the main landing gear (MLG) trunnion fitting assembly. This AD requires revising the maintenance or inspection program, as applicable, to incorporate certain airworthiness limitations (AWLs). This AD also requires reworking the trunnion fitting in order to meet new structural safe-life limits. This AD was prompted by reports of cracks on the MLG trunnion fitting during fatigue testing; the introduction of new AWL tasks with revised inspection, modification, and safe-life requirements; and a determination that the trunnion fitting lower flange and both forward and aft bore holes are also subject to fatigue cracking. We are issuing this AD to address the unsafe condition on these products.

The order itself the regulatory text, as published

Show the full text (17,149 characters)
Adoption of the Amendment Accordingly, under the authority delegated to me by the Administrator, the FAA amends 14 CFR part 39 as follows: PART 39--AIRWORTHINESS DIRECTIVES 0 1. The authority citation for part 39 continues to read as follows: Authority: 49 U.S.C. 106(g), 40113, 44701. Sec. 39.13 [Amended] 0 2. The FAA amends Sec. 39.13 by removing Airworthiness Directive (AD) 2008-24-14, Amendment 39-15758 (73 FR 73785, December 4, 2008), and adding the following new AD: 2019-08-11 Bombardier, Inc.: Amendment 39-19632; Docket No. FAA- 2018-0801; Product Identifier 2017-NM-147-AD. (a) Effective Date This AD is effective July 11, 2019. (b) Affected ADs This AD replaces AD 2008-24-14, Amendment 39-15758 (73 FR 73785, December 4, 2008) (``AD 2008-24-14''). (c) Applicability This AD applies to Bombardier, Inc., Model CL-600-2B19 (Regional Jet Series 100 & 440) airplanes, certificated in any category, serial numbers 7002 and subsequent. (d) Subject Air Transport Association (ATA) of America Code 57, Wings. (e) Reason This AD was prompted by reports of cracks on the main landing gear (MLG) trunnion fitting during fatigue testing; the introduction of new airworthiness limitation (AWL) tasks with revised inspection, modification, and safe-life requirements; and a determination that the trunnion fitting lower flange and both forward and aft bore holes are also subject to fatigue cracking. We are issuing this AD to address fatigue cracking of the MLG trunnion fitting. Failure of the MLG trunnion fitting could result in MLG collapse. (f) Compliance Comply with this AD within the compliance times specified, unless already done. (g) Retained Revision of Airworthiness Limitation Section With No Changes This paragraph restates the requirements of paragraph (f)(1) of AD 2008-24-14, with no changes. Within 30 days after December 19, 2008 (the effective date of AD 2008-24-14), revise the Airworthiness Limitations Section (ALS) of the Instructions for Continued Airworthiness to incorporate AWL 57-21-161, as identified in Bombardier Temporary Revision 2B-2136, dated May 1, 2008, to the Bombardier CL-600-2B19 Maintenance Requirements Manual, Part 2, Appendix B-- [[Page 26338]] Airworthiness Limitations. The initial compliance time for the task starts from the applicable time specified in table 1 to paragraphs (g) and (j) of this AD or table 2 to paragraphs (g) and (j) of this AD, as applicable. Repeat the inspection thereafter at the applicable interval specified in Bombardier Temporary Revision 2B- 2136, dated May 1, 2008. BILLING CODE 4910-13-P [GRAPHIC] [TIFF OMITTED] TR06JN19.000 [GRAPHIC] [TIFF OMITTED] TR06JN19.001 (h) Retained No Alternative Actions or Intervals With New Exception This paragraph restates the requirements of paragraph (f)(2) of AD 2008-24-14, with a new exception: Except as required by paragraph (i) of this AD, after accomplishing the actions specified in paragraph (g) of this AD, no alternative inspections or inspection intervals may be used unless the inspection or inspection interval is approved as an alternative method of compliance (AMOC) in accordance with the procedures specified in paragraph (p)(1) of this AD. (i) New Requirement of This AD: Revision of Existing Maintenance or Inspection Program (1) Within 60 days after the effective date of this AD: Revise the existing maintenance or inspection program, as applicable, by incorporating the AWL tasks specified in figure 1 to paragraphs (i)(1) and (o) of this AD. Except as specified in paragraph (j) of this AD, the initial compliance times for the tasks are at the applicable times specified in the temporary revisions (TRs) identified in figure 1 to paragraphs (i)(1) and (o) of this AD, or within 60 days after the effective date of this AD, whichever occurs later. When the information in AWL tasks identified in the TRs specified in figure 1 to paragraphs (i)(1) and (o) of this AD has been included in the general revisions of Bombardier Maintenance [[Page 26339]] Requirements Manual (MRM), CSP A-053, Part 2, Appendix B, the general revisions may be inserted in the MRM, and the TRs may be removed. Accomplishing the revision required by this paragraph terminates the actions required by paragraph (g) of this AD. Where the compliance times for the repetitive inspections and life limits specified in the TRs identified in figure 1 to paragraphs (i)(1) and (o) of this AD specify ``landings,'' those compliance times are based on the landings of the affected part. [GRAPHIC] [TIFF OMITTED] TR06JN19.002 (2) Within 60 days after the effective date of this AD: Revise the existing maintenance or inspection program, as applicable, by removing the AWL tasks specified in figure 2 to paragraph (i)(2) of this AD. [GRAPHIC] [TIFF OMITTED] TR06JN19.003 BILLING CODE 4910-13-C (j) New Requirement of This AD: Initial Compliance Times for AWL Tasks (1) For AWL 57-21-161, the compliance time for the initial inspection of AWL 57-21-161 is as specified in table 1 to paragraphs (g) and (j) of this AD or table 2 to paragraphs (g) and (j) of this AD, as applicable, or within 60 days after the effective date of this AD, whichever occurs later. (2) For AWL 57-21-161, the compliance time for the limitation section is at the applicable time specified in AWL 57-21-161 or within 2,000 flight cycles after the effective date of this AD, whichever occurs later. (3) For AWL 57-21-145 and AWL 57-21-155, the compliance times for the initial inspections are at the applicable times specified in AWL 57-21-145 and AWL 57-21-155 or within 2,000 flight cycles after the effective date of this AD, whichever occurs later. Where the compliance times for the initial inspections in the AWLs specify ``landings,'' those compliance times are based on the landings of the airplane. (4) For AWL 57-21-145and AWL 57-21-155, the compliance times for the limitation sections is at the applicable time specified in AWL 57-21-145 and AWL 57-21-155 or within 2,000 flight cycles after the effective date of this AD, whichever occurs later. (k) New Requirement of This AD: No Alternative Actions or Intervals After the maintenance or inspection program has been revised as required by paragraph (i) of this AD, no alternative actions (e.g., inspections) or intervals may be used unless the actions or intervals are approved as an AMOC in accordance with the procedures specified in paragraph (p)(1) of this AD. (l) New Requirement of This AD: Rework of MLG Trunnion To Meet Structural Safe-Life Limits (1) Except as specified in paragraph (m)(1) of this AD: At or before the accumulation of 34,900 total flight cycles, or within 2,000 flight cycles after the effective date of this AD, whichever occurs later, rework the MLG trunnion (cold working of fastener holes in the MLG trunnion fitting, and all applicable related investigative and corrective actions) in accordance with the Accomplishment Instructions of Bombardier Service Bulletin 601R-57- 046, Revision C, dated December 20, 2012. Do all applicable related investigative and corrective actions before further flight. (2) At or before the accumulation of 38,900 total flight cycles, or within 2,000 flight cycles after the effective date of this AD, whichever occurs later, rework the MLG trunnion (installation of forcemate bushings in the MLG trunnion, and all applicable related investigative and corrective actions) in accordance with the Accomplishment Instructions of Bombardier Service Bulletin 601R-57- 047, Revision B, dated October 2, 2012. Do all applicable related investigative and corrective actions before further flight. (3) Except as specified in paragraph (m)(2) of this AD: At or before the accumulation of 34,900 total flight cycles, or within 2,000 flight cycles after the effective date of this AD,whichever occurs later, rework the MLG trunnion (cold work of holes on the web of the MLG trunnion, and all applicable related [[Page 26340]] investigative and corrective actions) in accordance with the Accomplishment Instructions of Bombardier Service Bulletin 601R-57- 048, Revision C, dated June 6, 2013. Do all applicable related investigative and corrective actions before further flight. (m) Exceptions To Rework Specified in Paragraph (l) of This AD (1) For airplanes on which Bombardier Service Bulletin 601R-57- 046, Revision A, dated December 21, 2009; or Bombardier Service Bulletin 601R-57-046, Initial Issue, dated July 17, 2009; was accomplished prior to the effective date of this AD: Within 6 months after the effective date of this AD, do Part G of the Accomplishment Instructions of Bombardier Service Bulletin 601R-57-046, Revision C, dated December 20, 2012. (2) For airplanes on which Bombardier Service Bulletin 601R-57- 048, Revision A, dated November 24,2009; or Bombardier Service Bulletin 601R-57-048, Initial Issue, dated July 17, 2009; was accomplished prior to the effective date of this AD: Within 6 months after the effective date of this AD, do Part C of the Accomplishment Instructions of Bombardier Service Bulletin 601R-57-048, Revision C, dated June 6, 2013. (n) Credit for Previous Actions (1) This paragraph provides credit for actions required by paragraph (l)(1) of this AD, if those actions were performed before the effective date of this AD, using Bombardier Service Bulletin 601R-57-046, Revision B, dated August 24, 2012. (2) This paragraph provides credit for actions required by paragraph (l)(2) of this AD, if those actions were performed before the effective date of this AD, using the service information specified in paragraph (n)(2)(i) or (n)(2)(ii) of this AD. (i) Bombardier Service Bulletin 601R-57-047, Revision A, dated February 1, 2012. (ii) Bombardier Service Bulletin 601R-57-047, Initial Issue, dated June 29, 2011. (3) This paragraph provides credit for actions required by paragraph (l)(3) of this AD, if those actions were performed before the effective date of this AD, using Bombardier Service Bulletin 601R-57-048, Revision B, dated August 24, 2012. (4) This paragraph provides credit for actions required by paragraph (m)(1) of this AD, if those actions were performed before the effective date of this AD, using Part G of the Accomplishment Instructions of Bombardier Service Bulletin 601R-57-046, Revision B, dated August 24, 2012. (5) This paragraph provides credit for actions required by paragraph (m)(2) of this AD, if those actions were performed before the effective date of this AD, using Part C of the Accomplishment Instructions of Bombardier Service Bulletin 601R-57-048, Revision B, dated August 24, 2012. (o) Repairs and Alternative Actions or Intervals (1) If any damage is found during an inspection required by the AWLs identified in figure 1 to paragraphs (i)(1) and (o) of this AD, repair before further flight using a method approved by the Manager, New York ACO Branch, FAA; or Transport Canada Civil Aviation (TCCA); or Bombardier, Inc.'s TCCA Design Approval Organization (DAO). If approved by the DAO, the approval must include the DAO-authorized signature. The approved repair instructions must specifically refer to this AD or Canadian AD CF-2017-27, dated August 2, 2017. (2) Repairs approved by Bombardier, Inc., that deviate from the AWLs identified in figure 1 to paragraphs (i)(1) and (o) of this AD are acceptable methods of compliance if approved by the Manager, New York ACO Branch, FAA; or TCCA; or Bombardier, Inc.'s TCCA DAO. If approved by the DAO, the approval must include the DAO-authorized signature. The approved repair instructions must specifically refer to this AD or Canadian AD CF-2017-27, dated August 2, 2017. (3) For repairs approved before the effective date of this AD that affect the AWLs identified in figure1 to paragraphs (i)(1) and (o) of this AD and the approved repair instructions do not specifically refer to Canadian AD CF-2017-27, dated August 2, 2017: Within 6 months of the effective date of this AD, contact the Manager, New York ACO Branch, FAA; or TCCA; or Bombardier, Inc.'s TCCA DAO Inc., for new or revised limitations or inspection requirements on the repair area and comply with the revised limitations or inspection requirements. The new or revised limitations or inspection requirements must specifically refer to this AD or Canadian AD CF-2017-27, dated August 2, 2017. (4) Canadian AMOC No. AARDG-2018/A21, dated May 1, 2018, which was approved before the effective date of this AD by TCCA, is an acceptable method of compliance to the corresponding requirements of this AD. (p) Other FAA AD Provisions (1) Alternative Methods of Compliance (AMOCs): The Manager, New York ACO Branch, FAA, has the authority to approve AMOCs for this AD, if requested using the proceduresfound in 14 CFR 39.19. In accordance with 14 CFR 39.19, send your request to your principal inspector or local Flight Standards District Office, as appropriate. If sending information directly to the manager of the certification office, send it to ATTN: Program Manager, Continuing Operational Safety, FAA, New York ACO Branch, 1600 Stewart Avenue, Suite 410, Westbury, NY 11590; telephone 516-228-7300; fax 516-794-5531. Before using any approved AMOC, notify your appropriate principal inspector, or lacking a principal inspector, the manager of the local flight standards district office/certificate holding district office. (2) Contacting the Manufacturer: For any requirement in this AD to obtain corrective actions from a manufacturer, the action must be accomplished using a method approved by the Manager, New York ACO Branch, FAA; or TCCA; or Bombardier, Inc.'s TCCA DAO. If approved by the DAO, the approval must include the DAO-authorized signature. The approved corrective action instructions must specifically refer to this AD or Canadian AD CF-2017-27, dated August 2, 2017. (q) Related Information (1) Refer to Mandatory Continuing Airworthiness Information (MCAI) Canadian AD CF-2017-27, dated August 2, 2017, for related information. This MCAI may be found in the AD docket on the internet at http://www.regulations.gov by searching for and locating Docket No. FAA-2018-0801. (2) For more information about this AD, contact Aziz Ahmed, Aerospace Engineer, Airframe and Mechanical Systems Section, FAA, New York ACO Branch, 1600 Stewart Avenue, Suite 410, Westbury, NY 11590; telephone 516-228-7329; fax 516-794-5531. (3) Service information identified in this AD that is not incorporated by reference is available at the addresses specified in paragraphs (r)(5) and (r)(6) of this AD. (r) Material Incorporated by Reference (1) The Director of the Federal Register approved the incorporation by reference (IBR) of the service information listed in this paragraph under 5 U.S.C. 552(a) and 1 CFR part 51. (2) You must use this service information as applicable to do the actions required by this AD, unless this AD specifies otherwise. (3) The following service information was approved for IBR on July 11, 2019. (i) Bombardier Maintenance Requirements Manual Temporary Revision 2B-2237, dated June 19, 2014. (ii) Bombardier Maintenance Requirements Manual Temporary Revision 2B-2238, dated June 19, 2014. (iii) Bombardier Maintenance Requirements Manual Temporary Revision 2B-2239, dated June 19, 2014. (iv) Bombardier Maintenance Requirements Manual Temporary Revision 2B-2241, dated June 19, 2014. (v) Bombardier Maintenance Requirements Manual Temporary Revision 2B-2242, dated June 19, 2014. (vi) Bombardier Maintenance Requirements Manual Temporary Revision 2B-2246, dated November 7, 2014. (vii) Bombardier Service Bulletin 601R-57-046, Revision C, dated December 20, 2012. (viii) Bombardier Service Bulletin 601R-57-047, Revision B, dated October 2, 2012. (ix) Bombardier Service Bulletin 601R-57-048, Revision C, dated June 6, 2013. (4) The following service information was approved for IBR on December 19, 2008 (73 FR 73785, December 4, 2008). (i) Bombardier Temporary Revision 2B-2136, dated May 1, 2008, to the Bombardier CL-600-2B19 Maintenance Requirements Manual, Part 2, Appendix B--Airworthiness Limitations. (ii) [Reserved] (5) For service information identified in this AD, contact Bombardier, Inc., 400 C[ocirc]te-Vertu Road West, Dorval, Qu[eacute]bec H4S 1Y9, Canada; Widebody Customer Response Center North America toll-free telephone 1-866-538-1247 or direct-dial telephone 1-514-855-2999; fax 514-855-7401; email [email protected]; internet http://www.bombardier.com. (6) You may view this service information at the FAA, Transport Standards Branch, 2200 South 216th St., Des Moines, WA. For information on the availability of this material at the FAA, call 206-231-3195. (7) You may view this service information that is incorporated by reference at the [[Page 26341]] National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal-register/cfr/ibr-locations.html.

Related safety bulletins advice on the same designs, not orders

2021-09-16AIR-21-15R1 · Navigation System
2021-08-26AIR-21-15 · Navigation System
2020-03-18NM-20-03 · Landing Gear: Brake Control Valve
2019-02-19NE-19-03 · Escape Slide Maintenance Tasks and Intervals - JASC 2565
2011-08-30NM-11-51 · Ice and Rain Protection: Wing Anti-Ice System

Source: FAA Dynamic Regulatory System, airworthiness directives. The FAA's document is the authority; the register counts are this site's, from the FAA register of November 6, 2026. Connections as data: /graph/directive/2019-08-11.json · aircraft systems.