The U.S. aircraft register, updated daily
Parts

Rework Ships

No failure report names the rework ships. 5 FAA approvals let 1 company make a replacement rework ships, B/E Aerospace, INC. - Fsi holding the most (5).

Approved replacement parts 5 parts manufacturer approvals

A parts manufacturer approval (PMA) lets a company other than the aircraft's maker make a rework ships and sell it as an approved part for the models named. These are the companies holding such approvals for a rework ships:

For these models most: Boeing 777 (5).

MakerPartReplacesFitsGrantedStatus
B/E Aerospace, INC. - FsiRework – Ships Wiring, Lav 1F-1L B951330-0001777-23-40-G3531 The Boeing Company 777-300ER Series2025-11-11current
B/E Aerospace, INC. - FsiRework – Ships Wiring, SNA Attendant Area B951380-0001777-23-40-G3545 The Boeing Company 777-300ER Series2025-11-11current
B/E Aerospace, INC. - FsiRework – Ships Wiring, Water and Waste B951330-0003777-23-40-G3532 The Boeing Company 777-300ER Series2025-11-11current
B/E Aerospace, INC. - FsiRework – Ships Wiring, DR 1 Area Heaters B951399-0001777-23-40-G3549 The Boeing Company 777-300ER Series2025-11-11current
B/E Aerospace, INC. - FsiRework – Ships Wiring, Distribution Panel B951340-0001777-23-40-G3533 The Boeing Company 777-300ER Series2025-11-11current

Sources: the FAA's service difficulty reports since 1995 (a report is a part that failed and was fixed, as filed by an airline, repair station or owner; the count shows reporting as much as reliability) and the parts manufacturer approvals in the FAA's Dynamic Regulatory System. The part name is the reporters' and the approval holders' own words, reduced to the first plain words so that spellings meet.