The U.S. aircraft register, updated daily
Parts

Primary Flight

No failure report names the primary flight. 3 FAA approvals let 2 companies make a replacement primary flight, Rockwell Collins INC. holding the most (2).

Approved replacement parts 3 parts manufacturer approvals

A parts manufacturer approval (PMA) lets a company other than the aircraft's maker make a primary flight and sell it as an approved part for the models named. These are the companies holding such approvals for a primary flight:

For these models most: Beechcraft B300 King Air 350 (1), Airbus BD-500 (1), Airbus Canada Ltd Ptnrsp BD-500 (1).

MakerPartReplacesFitsGrantedStatus
Rockwell Collins INC.Primary Flight Control Computer PFCC-4100 822-2749-502822-2749-502Airbus Canada... BD-500-1A10, BD-500-1A112025-05-16current
Rockwell Collins INC.Primary Flight Control Computer (PFCC-4100) 822-2749-501822-2749-501Bombardier BD-500-1A10 CSeries (CS100)2016-08-03current
Universal Avionics Systems CorporationM890R Primary Flight Display/Nav Display Installtion MDL-2004-1001Modification partsRaytheon B300 Aircraft with STC SA01656LA installed2005-02-07current

Sources: the FAA's service difficulty reports since 1995 (a report is a part that failed and was fixed, as filed by an airline, repair station or owner; the count shows reporting as much as reliability) and the parts manufacturer approvals in the FAA's Dynamic Regulatory System. The part name is the reporters' and the approval holders' own words, reduced to the first plain words so that spellings meet.