The U.S. aircraft register, updated daily
Parts

Fuel Supply

No failure report names the fuel supply. 2 FAA approvals let 2 companies make a replacement fuel supply, Rohr INC (See Goodrich Aerostructures) holding the most (1).

Approved replacement parts 2 parts manufacturer approvals

A parts manufacturer approval (PMA) lets a company other than the aircraft's maker make a fuel supply and sell it as an approved part for the models named. These are the companies holding such approvals for a fuel supply:

For these models most: Cessna A185 Skywagon (1), Cessna 185 Skywagon (1).

MakerPartReplacesFitsGrantedStatus
Metal Innovations INCFuel Supply line from pump to manifold 0520-28-0001Modification PartCessna 185, 185A, 185B2008-07-01current
Rohr INC (See Goodrich Aerostructures)Fuel Supply System 277-1450-503General Electric 277-1450-503General Electric CF6-80E1A1, CF6-80E1A21995-03-29current

Sources: the FAA's service difficulty reports since 1995 (a report is a part that failed and was fixed, as filed by an airline, repair station or owner; the count shows reporting as much as reliability) and the parts manufacturer approvals in the FAA's Dynamic Regulatory System. The part name is the reporters' and the approval holders' own words, reduced to the first plain words so that spellings meet.