The U.S. aircraft register, updated daily
Parts

Endplate

0 failure reports named the endplate in the last ten years, 3 since 1995. 5 FAA approvals let 4 companies make a replacement endplate, Airweld INC holding the most (2).

Reports by year

0122331995
Reports by year, as a table
reports
19953

Approved replacement parts 5 parts manufacturer approvals

A parts manufacturer approval (PMA) lets a company other than the aircraft's maker make a endplate and sell it as an approved part for the models named. These are the companies holding such approvals for a endplate:

For these models most: Boeing 737 (3), Mcdonnell Douglas DC-9 (2).

MakerPartReplacesFitsGrantedStatus
Gemini EngineeringENDPLATE 69-35560-169-35560-1Boeing 737-100 Series, 737-200 Series,...2009-11-15current
Gemini Engineering INCENDPLATE 69-35560-169-35560-1Boeing 737-100 Series, 737-200 Series,...2009-11-15current
Spirit Aerosystems INCENDPLATE 69-35560-169-35560-1Boeing 737-100 SERIES, 737-200 SERIES,...2009-09-24current
Airweld INCEndplate, Door AW5958775-141Douglas 5958775-141McDonnell Douglas DC-9-10, -20, -301996-08-25current
Airweld INCEndplate, Door AW5958775-189Douglas 5958775-189McDonnell Douglas DC-9-10, -20, -301996-08-25current

Sources: the FAA's service difficulty reports since 1995 (a report is a part that failed and was fixed, as filed by an airline, repair station or owner; the count shows reporting as much as reliability) and the parts manufacturer approvals in the FAA's Dynamic Regulatory System. The part name is the reporters' and the approval holders' own words, reduced to the first plain words so that spellings meet.