Drain Installation
No failure report names the drain installation. 4 FAA approvals let 2 companies make a replacement drain installation, Air Comm Corporation holding the most (3).
Approved replacement parts 4 parts manufacturer approvals
A parts manufacturer approval (PMA) lets a company other than the aircraft's maker make a drain installation and sell it as an approved part for the models named. These are the companies holding such approvals for a drain installation:
For these models most: Learjet 45 (3), Boeing 737 (1).
| Maker | Part | Replaces | Fits | Granted | Status |
|---|---|---|---|---|---|
| Air Comm Corporation | Drain Installation - (Comp./Cond. Pallet Installation) 45-0501-2 | 45-0501-2 | Learjet Inc. 45 | 2026-08-31 | current |
| Air Comm Corporation | Drain Installation - (Comp./Cond. Pallet Installation) 45-0501-2 | 45-0501-2 | Learjet Inc. 45 | 2025-02-10 | current |
| Air Comm Corporation | Drain Installation - (Comp./Cond. Pallet Installation) 45-0501-2 | 45-0501-2 | Learjet 45 | 2024-08-06 | current |
| Airborne Maintenance & Engineering Services | Drain Installation 0370-38-0000-9 | 0370-38-0000-9 | Boeing 737-700 | 2022-05-12 | current |
Sources: the FAA's service difficulty reports since 1995 (a report is a part that failed and was fixed, as filed by an airline, repair station or owner; the count shows reporting as much as reliability) and the parts manufacturer approvals in the FAA's Dynamic Regulatory System. The part name is the reporters' and the approval holders' own words, reduced to the first plain words so that spellings meet.
