The U.S. aircraft register, updated daily
FAA orders · airworthiness directive · current

95-21-20: Inspect APU

FAA order 95-21-20 is an airworthiness directive in force since November 17, 1995. The FAA's subject line: Inspect APU. System: engine.

What it applies to as the FAA lists it

Kind of product
Aircraft
Makes
—
Models
F.28 Mark 0100

Dates and paperwork

In force since
November 17, 1995
Docket
95-NM-52-AD
Status
Current
The FAA's document
Read the order on the FAA's site

The FAA's summary their words, unchanged

This amendment adopts a new airworthiness directive (AD), applicable to certain Fokker Model F28 Mark 0100 series airplanes, that requires a visual inspection to detect damage to the flexible fuel drain line of the auxiliary power unit (APU), and replacement of the drain line, if necessary. This amendment also requires installation of two additional clamps to secure the flexible fuel drain line to the fuel supply line of the APU. This amendment is prompted by reports of electrical arcing between the flexible fuel drain line and the APU starter motor. The actions specified by this AD are intended to prevent such electrical arcing, which could result in a fire in the APU.

The order itself the regulatory text, as published

Show the full text (3,587 characters)
95-21-20 FOKKER: Amendment 39-9407. Docket 95-NM-52-AD. Applicability: Model F28 Mark 0100 series airplanes, serial numbers 11244 through 11405 inclusive, certificated in any category. NOTE 1: This AD applies to each airplane identified in the preceding applicability provision, regardless of whether it has been modified, altered, or repaired in the area subject to the requirements of this AD. For airplanes that have been modified, altered, or repaired so that the performance of the requirements of this AD is affected, the owner/operator must use the authority provided in paragraph (b) of this AD to request approval from the FAA. This approval may address either no action, if the current configuration eliminates the unsafe condition; or different actions necessary to address the unsafe condition described in this AD. Such a request should include an assessment of the effect of the changed configuration on the unsafe condition addressed by this AD. In no case does thepresence of any modification, alteration, or repair remove any airplane from the applicability of this AD. Compliance: Required as indicated, unless accomplished previously. To prevent electrical arcing between the flexible fuel drain line and starter motor positive terminal of the auxiliary power unit (APU), which could lead to a fire in the APU, accomplish the following: (a) Within 14 days after the effective date of this AD, perform a visual inspection of the APU to detect damage of the flexible fuel drain line and its braiding, in accordance with Fokker Service Bulletin SBF100-49-023, dated November 20, 1992. (1) If no damage is detected, prior to further flight, install two additional clamps on the fuel supply line and flexible fuel drain line, in accordance with the service bulletin. (2) If any damage is detected, prior to further flight, replace the flexible fuel drain line with a new or serviceable drain line, and install two additional clamps on thefuel supply line and flexible fuel drain line, in accordance with the service bulletin. (b) An alternative method of compliance or adjustment of the compliance time that provides an acceptable level of safety may be used if approved by the Manager, Standardization Branch, ANM-113, FAA, Transport Airplane Directorate. Operators shall submit their requests through an appropriate FAA Principal Maintenance Inspector, who may add comments and then send it to the Manager, Standardization Branch, ANM-113. NOTE 2: Information concerning the existence of approved alternative methods of compliance with this AD, if any, may be obtained from the Standardization Branch, ANM-113. (c) Special flight permits may be issued in accordance with sections 21.197 and 21.199 of the Federal Aviation Regulations (14 CFR 21.197 and 21.199) to operate the airplane to a location where the requirements of this AD can be accomplished. (d) The inspection, installations, replacement and shall bedone in accordance with Fokker Service Bulletin SBF100-49-023, dated November 20, 1992. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies may be obtained from Fokker Aircraft USA, Inc., 1199 North Fairfax Street, Alexandria, Virginia 22314. Copies may be inspected at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the Office of the Federal Register, 800 North Capitol Street, NW., suite 700, Washington, DC. (e) This amendment becomes effective on November 17, 1995.

Source: FAA Dynamic Regulatory System, airworthiness directives. The FAA's document is the authority; the register counts are this site's, from the FAA register of November 6, 2026. Connections as data: /graph/directive/95-21-20.json · aircraft systems.