Hydroaire Division of the Crane CO
Named as the FAA publishes it on its approvals.
Holds 9 approved modifications, most of them for the Mitsubishi MU-2. FAA spelling: HydroAire Division of the Crane Co.
Approved modifications 9 · newest first
Mitsubishi MU-2 2Fairchild SA226 2Swearingen SA-26 1Dehavilland DHC-6 1Beechcraft E-90 King Air E90 1Beechcraft C90 King Air C90 1Beechcraft A100 1Beechcraft 65 1
1998-02-16SA2910WE · Installation of fuel tank boost pump. · SA226-TC
1998-02-16SA3339WE · Installation of Hydro-Aire Power Brake/Skid Control System. · 200 (A100-1 (U-21J))
1998-02-16SA2898WE · Installation of a fuel tank boost pump. · DHC-6-1, DHC-6-300, DHC-6-100
1998-02-16SA3489WE · Installation of fuel boost pump. · MU-2B-26, MU-2B-35, MU-2B-36
1998-02-16SA2908WE · Installation of fuel tank boost pump. · A100 (U-21F), 99, 99A(FACH)
1998-02-16SA3057WE · Installation of fuel tank boost pump. (SA26-AT MERLIN II) · SA26-T, SA26-AT
1998-02-16SA2907WE · Installation of fuel tank boost pump. · 65-A90-3 (RU-21C), 65-A90-4 (RU-21E), B90
1998-02-16SA2909WE · Installation of fuel tank boost pump. · SA226-T, SA226-AT
1998-02-16SA3490WE · Installation of fuel boost pump. · MU-2B-30, MU-2B-10, MU-2B-15
Source: FAA Dynamic Regulatory System (type certificate data sheets, supplemental type certificates, parts manufacturer approvals, technical standard order authorisations). An organisation's name is as the FAA spelled it on each record; related spellings are separate pages.
