The U.S. aircraft register, updated daily
Who holds what · as the FAA records the name

Raisbeck Engineering INC.

Holds 45 approved modifications, most of them for the Beechcraft B200 King Air B200. FAA spelling: Raisbeck Engineering Inc..

Approved modifications 45 · newest first

2026-08-25SA4175NM · Installation of fully enclosed main landing gear door system for high-flotation- gear-equipped aircraft. · 200, 200C, 200CT
2026-07-07SA4132NM · Installation of Raisbeck Mark VIII wing lockers. · F90
2026-04-22SA02741SE · Installation of Raisbeck Engineering Drag Reduction System · 208B
2025-01-24SA00197MC · Ground Idle Reset System Removal · B200C (C-12F)
2024-12-09SA04741NY · Installation of a Soot Shield · 208B
2023-10-20SA2698NM-S · Installation of a set of Hartzell/Raisbeck Quiet Turbofan Propellers or Swept Turbofan Propellers · 200, 200C, 200CT
2023-09-01SA01596SE · Installation of Butterfield Industries Oil Residue Collection System, kit P/N BI 3401-1. · TBM 700
2023-09-01ST00352SE · Installation of an aft fuselage stowage locker. · 31, 31A
2023-09-01SA3593NM · Installation of Raisbeck/Hartzell Quiet Turbofan Propellers or Swept Turbofan Propellers, and optional Increased Gross Weight · 65-A90, B90, C90
2023-09-01SA3366NM · Installation of the Ram Air Recovery System. · 200, 200C, 200CT
2023-09-01SA4130NM · Installation of lower aft fuselage strakes. · F90
2023-09-01SA1783NM · Install Mark VI system. · 200, 200C, 200CT
2023-09-01SA5152NM · Installation of nacelle wing lockers. · B300, B300C (MC-12W), B300C (UC-12W)
2023-09-01SA4734NM · Installation of nacelle overwing storage lockers and lower flap fairing. · 300LW, 300
2023-09-01SA3819NM · Installation of nacelle overwing stowage lockers and lower flap fairing. · 100, B100, A100
2023-09-01SA4010NM · Installation of lower aft fuselage strakes. · 65-90, 65-A90, B90
2023-09-01SA4952NM · Installation of main landing gear door system for high flotation gear equipped aircraft. · 100, A100, B100
2023-09-01SA5151NM · Installation of dual aft body strakes. · B300, B300C
2023-09-01SA3683NM · Installation of exhaust stack fairings. · 100, 200 (A100-1 (U-21J)), 200C
2023-09-01SA1668NM · Installation of new main landing gear doors · 200, 200C, 200CT
2023-09-01ST00399SE · The above boeing model which has incorporated Raisbeck Commercial Air Group Inc Master Drawing List 96B-1001,... · 727-200 Series
2023-09-01ST00553SE · Incorporation of the Raisbeck Commercial Air Group inlet acoustical treatment and associated structure on certain... · 727-100 Series, 727-200 Series
2023-09-01SA4944NM · Installation of fully enclosed main landing gear door system for high-flotation-gear-equipped aircraft · F90
2023-09-01SA4131NM · Installation of Hartzell/Raisbeck Quiet Turbofan Propeller · F90
2023-09-01SA01800CH · Installation of Butterfield Industries Oil Residue Collection System, kit Part Number BI 2001-1 · 65-90, 65-A90, B90
2023-09-01SA02215SE · Fabrication of Inspection Panel Kit BI 9501-001 · 200, 200C, 200CT
2023-09-01SA3591NM · Installation of lower aft fuselage strakes. · 200, 200C, 200CT
2023-09-01SA2116NM · Installation of Raisbeck fully enclosed main landing gear doors · 65-A90
2023-09-01SA2623NM · Installation of fully enclosed main landing gear door system and associated actuation mechanism · 65-90, 65-A90, B90
2023-09-01SA3532NM · Installation of Hartzell/Raisbeck Quiet Turbofan Propeller System. Suitable for DHC-6-300 airplanes with PT6A-27 engines. · DHC-6-300
2023-09-01SA5661NM · Installation of turbofan propellers. · 100, A100
2023-09-01SA4362NM · Installation of Butterfield Industries Oil Residue Collection System Kit Part Number BI 1011-1 · 200, 200C, 200CT
2023-09-01SA2905NM · Installation of Butterfield Industries Flow Through Anti-Ice Kit Part Number BI 1001-1 · 200, 200C, 200CT
2023-09-01SA02620SE · Installation of Butterfield Industries Air/Oil Separator System, kit Part Number BI 8055-1 · C90A, C90GT, C90GTi
2023-09-01SA4733NM · Installation of lower aft fuselage strakes. · 300, 300LW
2023-09-01ST00179SE · Installation of an aft fuselage stowage locker. · Learjet 35A (C-21A), Learjet 35, Learjet 36A
2023-09-01ST01182LA · Installation of an interior modification. · A320-232
2023-09-01SA2133NM · Installation of fully enclosed main landing gear doors · 65-90, 65-A90, B90
2023-09-01SA00976CH · Installation of Butterfield Industries Air/Oil Separator System, kit Part Number BI 6001-3 · 300, 300LW, B300
2023-09-01SA4940NM · Install engine fluids collection tank. · 208, 208B
2023-09-01SA01454CH · Installation of Butterfield Industries Oil Residue Collection System, kit Part Number BI 8030-1 · C90A, C90GT, C90GTi
2023-09-01SA2939NM · Installation of nacelle overwing storage lockers and lower flap fairing. · 65-90, 65-A90, B90
2023-09-01SA02559SE · Installation of Raisbeck/Hartzell Five-Blade Swept Turbofan Propellers · 300LW, B300, B300C (MC-12W)
2023-09-01SA02473SE · Installation of Raisbeck/Hartzell Swept Blade Turbofan Propellers · B300, B300C (MC-12W), B300C (UC-12W)
2023-09-01ST00555SE · Modification in the leading edge slat and flap configurations · 727-200 Series

Source: FAA Dynamic Regulatory System (type certificate data sheets, supplemental type certificates, technical standard order authorisations). An organisation's name is as the FAA spelled it on each record; related spellings are separate pages.