The U.S. aircraft register, updated daily
Parts · Airframe structure

Stub Frame

357 failure reports named the stub frame in the last ten years, 362 since 1995, most often on the Boeing 737; the condition most often found was "cracked". 3 FAA approvals let 2 companies make a replacement stub frame, Spirit Aerosystems INC holding the most (2). The reports call it "stub frame", "stub frame".

Reports by year

024477094199520192024392026
Reports by year, as a table
reports
19951
19963
19981
20173
20184
20198
202010
202150
202261
202326
202462
202594
202639

Which system the reports file it under last ten years

Reports by system, as a table
reports
Airframe structure357

How it failed the condition found, last ten years

cracked330corroded17damaged5broken2canning1no indication1none1
Conditions found, as a table
reports
cracked330
corroded17
damaged5
broken2
canning1
no indication1
none1

Engines most often reporting it

Approved replacement parts 3 parts manufacturer approvals

A parts manufacturer approval (PMA) lets a company other than the aircraft's maker make a stub frame and sell it as an approved part for the models named. These are the companies holding such approvals for a stub frame:

For these models most: Boeing 737 (2), Pilatus PC-12 (1).

MakerPartReplacesFitsGrantedStatus
Mcfarlane Aviation INCStub Frame FAP53102-03FAP53102-03Pilatus PC-12/45, PC-12/472016-03-09current
Spirit Aerosystems INCSTUB FRAME 141A8371Y8141A8371-8Boeing 737-600 SERIES, 737-700 SERIES,...2010-03-25current
Spirit Aerosystems INCSTUB FRAME 141A8371Y7141A8371-7Boeing 737-600 SERIES, 737-700 SERIES,...2010-03-25current

Sources: the FAA's service difficulty reports since 1995 (a report is a part that failed and was fixed, as filed by an airline, repair station or owner; the count shows reporting as much as reliability) and the parts manufacturer approvals in the FAA's Dynamic Regulatory System. The part name is the reporters' and the approval holders' own words, reduced to the first plain words so that spellings meet.