Lock Fitting
5 failure reports named the lock fitting in the last ten years, 5 since 2020, most often on the Boeing 767; the condition most often found was "corroded". 3 FAA approvals let 1 company make a replacement lock fitting, Amsafe Bridport holding the most (3).
Reports by year
Reports by year, as a table
| reports | |
|---|---|
| 2020 | 2 |
| 2022 | 3 |
Which system the reports file it under last ten years
Reports by system, as a table
| reports | |
|---|---|
| Airframe structure | 5 |
Models most often reporting it last ten years
Models most reported, as a table
| reports | |
|---|---|
| Boeing 767 | 3 |
| Airbus A319 | 2 |
How it failed the condition found, last ten years
Conditions found, as a table
| reports | |
|---|---|
| corroded | 5 |
Approved replacement parts 3 parts manufacturer approvals
A parts manufacturer approval (PMA) lets a company other than the aircraft's maker make a lock fitting and sell it as an approved part for the models named. These are the companies holding such approvals for a lock fitting:
For these models most: Boeing 747 (3).
| Maker | Part | Replaces | Fits | Granted | Status |
|---|---|---|---|---|---|
| Amsafe Bridport | LOCK FITTING 69B55480-4 | 69B55480-4 | BOEING 747-100 SERIES, 747-200B SERIES,... | 2022-09-27 | current |
| Amsafe Bridport | LOCK FITTING 69B55480-2 | 69B55480-2 | BOEING 747-200B SERIES, 747-200F SERIES | 2022-09-27 | current |
| Amsafe Bridport | LOCK FITTING 69B55480-2 | (69B55480-2) | BOEING 747-200B SERIES, 747-200F SERIES | 2011-02-03 | current |
Sources: the FAA's service difficulty reports since 1995 (a report is a part that failed and was fixed, as filed by an airline, repair station or owner; the count shows reporting as much as reliability) and the parts manufacturer approvals in the FAA's Dynamic Regulatory System. The part name is the reporters' and the approval holders' own words, reduced to the first plain words so that spellings meet.
