Btr Mounting
No failure report names the btr mounting. 3 FAA approvals let 2 companies make a replacement btr mounting, Lord Corporation, Mechanical Products Division holding the most (2).
Approved replacement parts 3 parts manufacturer approvals
A parts manufacturer approval (PMA) lets a company other than the aircraft's maker make a btr mounting and sell it as an approved part for the models named. These are the companies holding such approvals for a btr mounting:
For these models most: Boeing 737 (1), Boeing 727 (1), Airbus A321 (1), Airbus A320 (1), Airbus A319 (1).
| Maker | Part | Replaces | Fits | Granted | Status |
|---|---|---|---|---|---|
| Lord Corporation | BTR Mounting, Bonded HT01667-7 | HT01667-7 | Gulfstream Aerospace Corp. G280 (with STC ST04266AT-D installed) | 2013-06-23 | current |
| Lord Corporation, Mechanical Products Division | BTR Mounting, Bonded HT01667-7 | HT01667-7 | Gulfstream Aerospace Corp. G280 (with STC ST04266AT-D installed) | 2013-06-23 | current |
| Lord Corporation, Mechanical Products Division | BTR MOUNTING BONDED HTO-7 | HTO-7 | Airbus A319: 111, 112, 113 | 2001-11-13 | current |
Sources: the FAA's service difficulty reports since 1995 (a report is a part that failed and was fixed, as filed by an airline, repair station or owner; the count shows reporting as much as reliability) and the parts manufacturer approvals in the FAA's Dynamic Regulatory System. The part name is the reporters' and the approval holders' own words, reduced to the first plain words so that spellings meet.
