Ayres Corporation
Approved to make 1 class of equipment. Holds 13 approvals to make replacement parts. FAA spelling: Ayres Corporation.
Replacement parts approved 13 parts manufacturer approvals, 13 current · Albany, GA
A parts manufacturer approval lets a company make a replacement part for someone else's aircraft or engine and sell it as an approved part. This company's approvals are mostly for other and general (9), airframe structure (3), fuel system (1).
1993-03-02Tail Skid Cartridge 91-050-01 · replaces Modification Part · 727-200
1993-01-20Cowl, Upper B27-71-018-01 · replaces Modification Part · 727-200
1993-01-20Fence, Aerodynamic B27-71-009-3 · replaces Modification Part · 727-200
1993-01-20Fairing Assembly Pylon Aft B27-54-016-02 · replaces Modification Part · 727-200
1993-01-20Cowl, Upper B27-71-018-02 · replaces Modification Part · 727-200
1993-01-20Fence, Aerodynamic B27-71-009-1 · replaces Modification Part · 727-200
1993-01-20Cowl, Fixed B27-71-019-01 · replaces Modification Part · 727-200
1993-01-20Fairing Assembly Pylon Aft B27-54-016-01 · replaces Modification Part · 727-200
1993-01-20Angle Support B27-78-063-02 · replaces Modification Part · 727-200
1993-01-20Cowl, Fixed B27-71-019-02 · replaces Modification Part · 727-200
1993-01-20Angle Support B27-78-063-01 · replaces Modification Part · 727-200
1993-01-20Cowl, Lower B27-71-017-01 · replaces Modification Part · 727-200
1988-03-21Lear Romec Fuel Pump MDL ZC 34720 · S2B-T3A
Equipment approvals technical standard order authorisations
TSO-C44A · Fuel Flowmeters · * · other and general
Source: FAA Dynamic Regulatory System (type certificate data sheets, supplemental type certificates, parts manufacturer approvals, technical standard order authorisations). An organisation's name is as the FAA spelled it on each record; related spellings are separate pages.
