The U.S. aircraft register, updated daily
FAA orders · airworthiness directive · current

63-13-01: Propeller Inspection

FAA order 63-13-01 is an airworthiness directive in force since June 21, 1963. The FAA's subject line: Propeller Inspection. It names Boeing 75, Boeing A75 Stearman Kaydet, Boeing B75 Stearman Kaydet, Boeing D75, Boeing E75 Stearman Kaydet, Boeing IB75: about 1,644 aircraft on the U.S. register today across them, though an order usually covers particular versions or serial numbers rather than every one. System: propeller.

What it applies to as the FAA lists it

Kind of product
Aircraft
Makes
Boeing Airplane Company, Wichita Division
Models
75 (Army PT-13), A75 (Army PT-13A, -13B, -13C), A75J1 (Army PT-18), A75L3, A75L300, A75N1 (Army PT-17, -17A, Navy N2S-1, -4), B75 (Navy N2S-5), B75N1 (Navy N2S-3), D75N1 (Army PT-27), E75 (Army PT-13D, Navy N2S-5, PT-13D/N2S-5), E75N1 (Army PT-13D, Navy N2S-5, PT-13D/N2S-5), IB75A
On this site
Boeing 75 18 registered
Boeing A75 Stearman Kaydet 979 registered
Boeing B75 Stearman Kaydet 257 registered
Boeing D75 35 registered
Boeing E75 Stearman Kaydet 343 registered
Boeing IB75 12 registered

Dates and paperwork

In force since
June 21, 1963
Docket
Unknown
Status
Current
The FAA's document
Read the order on the FAA's site

The order itself the regulatory text, as published

Show the full text (1,386 characters)
63-13-01 BOEING: Amdt. 579 Part 507 Federal Register June 21, 1963. Applies to All Model 75 Series Aircraft Equipped With Pratt & Whitney R-985 or Wright R-975 Series Engines and Western Propeller Repair Model W2-1 Propellers, Including Those Certificated in the Restricted Category. Compliance required as indicated. As a result of several propeller blade failures the following inspections are required: Within 25 hours' time in service after the effective date of this AD, unless already accomplished within the last 225 hours' time in service, and thereafter at intervals not to exceed 250 hours' time in service from the last inspection, remove propeller blades from hub, clean surface as necessary and inspect by dye penetrant or equivalent method for evidence of cracks within the hub area and for at least 6 inches of shank portion of the blade outside of the hub. If no cracks are found blades may be returned to service. Any blades showing evidence of cracks are not eligible for repair and shall not be used again in certificated aircraft. The repetitive inspections required on Pratt and Whitney R-985 engines in this AD are no longer necessary when the engine crankshaft flyweight and flyweight liners have been reworked or replaced at each overhaul period as detailed in AD 65-07-02. This directive effective June 21, 1963. Revised October 13, 1965.

Related safety bulletins advice on the same designs, not orders

2017-10-10SW-17-28 · Fuel Quantity Indicator

Source: FAA Dynamic Regulatory System, airworthiness directives. The FAA's document is the authority; the register counts are this site's, from the FAA register of October 5, 2026. Connections as data: /graph/directive/63-13-01.json · aircraft systems.