Fill
No failure report names the fill. 4 FAA approvals let 4 companies make a replacement fill, Utc Aerospace Systems, Goodrich Sensors & Integrated Systems holding the most (1).
Approved replacement parts 4 parts manufacturer approvals
A parts manufacturer approval (PMA) lets a company other than the aircraft's maker make a fill and sell it as an approved part for the models named. These are the companies holding such approvals for a fill:
For these models most: Hawker Beechcraft Corp HAWKER 4000 (1), Embraer ERJ 190 E190 and E195 (1), Boeing 757 (1), Boeing 737 (1).
| Maker | Part | Replaces | Fits | Granted | Status |
|---|---|---|---|---|---|
| Monogram Systems | Fill/Drain Switch, Water Sys 19000-340 | 19000-340 | Embraer ERJ 190-400 | 2019-07-31 | current |
| Rockwell Collins INC | Fill, Overflow Valve Instl Potable Water 0016-0015-12 | 0016-0015-12 | Boeing 737-10 | 2018-02-25 | current |
| Utc Aerospace Systems, Goodrich Sensors & Integrated Systems | Fill/Overflow Valve Assembly 4E4278-1 | Beechcraft 4E4278-1 | Beechcraft Corporation Hawker) (4000 | 2016-02-15 | current |
| Allen Aircraft Products | Fill/Drain Water Valve 12D1014-1 | Boeing 10-60784-34 | Boeing 757-200, 757-300 Series | 2001-03-27 | current |
Sources: the FAA's service difficulty reports since 1995 (a report is a part that failed and was fixed, as filed by an airline, repair station or owner; the count shows reporting as much as reliability) and the parts manufacturer approvals in the FAA's Dynamic Regulatory System. The part name is the reporters' and the approval holders' own words, reduced to the first plain words so that spellings meet.
