Electrical Load
No failure report names the electrical load. 6 FAA approvals let 4 companies make a replacement electrical load, Honeywell Aerospace US LLC holding the most (3).
Approved replacement parts 6 parts manufacturer approvals
A parts manufacturer approval (PMA) lets a company other than the aircraft's maker make a electrical load and sell it as an approved part for the models named. These are the companies holding such approvals for a electrical load:
For these models most: Boeing 747 (4), Boeing 767 (2), Boeing 757 (2).
| Maker | Part | Replaces | Fits | Granted | Status |
|---|---|---|---|---|---|
| Hamilton Sundstrand Corporation | Electrical Load Control Unit #915F369-3 Dwg. No. Dwg.... | Boeing P/N 60B00176-2 | Boeing 747 | 1995-03-26 | current |
| Sundstrand Electric Power Sys | Electrical Load Control Unit 915F369-3 | Boeing 60B00176-2 | Boeing 747 | 1993-12-16 | current |
| Honeywell Aerospace US LLC | Electrical Load Control Unit Dwg 3B41-3-B | Boeing S281T003-3 | Boeing 767-200, -300, 757-200 | 1993-05-12 | current |
| Honeywell Aerospace US LLC | Electrical Load Control Unit Dwg 3B39-1-C | Boeing S281T003-1 | Boeing 767-200, -300, 757-200 | 1993-05-12 | current |
| Honeywell Aerospace US LLC | Electrical Load Control Unit Dwg 3B50-2-D | Boeing S281T003-6 | Boeing 747-400 | 1993-05-12 | current |
| Westinghouse Electric CORP, Electrical Systems Div | Electrical Load Control Unit 915F369-3 | Boeing 60B00176-2 | Boeing 747 | 1992-03-10 | current |
Sources: the FAA's service difficulty reports since 1995 (a report is a part that failed and was fixed, as filed by an airline, repair station or owner; the count shows reporting as much as reliability) and the parts manufacturer approvals in the FAA's Dynamic Regulatory System. The part name is the reporters' and the approval holders' own words, reduced to the first plain words so that spellings meet.
