The U.S. aircraft register, updated daily
Parts

Center Body

No failure report names the center body. 6 FAA approvals let 3 companies make a replacement center body, Rohr INC (See Goodrich Aerostructures) holding the most (4).

Approved replacement parts 6 parts manufacturer approvals

A parts manufacturer approval (PMA) lets a company other than the aircraft's maker make a center body and sell it as an approved part for the models named. These are the companies holding such approvals for a center body:

For these models most: Airbus A320 (2).

MakerPartReplacesFitsGrantedStatus
Goodrich Aerostructures (Formerly Rohr INC)Center Body 238-0451-523238-0451-523Airbus A318-111, -1122008-05-13current
Aft TechnologiesCenter Body, Exhaust Cone AFT-5900T14G02/35900T14G02/3General Electric CJ610-1 ESN 240001 and up, CJ610-5...2000-09-19current
Rohr INC (See Goodrich Aerostructures)Center Body 238-0451Airbus Industrie, 238-0451Airbus A320, -111, -2111996-04-30current
Rohr INC (See Goodrich Aerostructures)Center Body Assembly 340-6001-503CFM International 340-6001-503CFM International CFM56-5C2, -5C31993-10-17current
Rohr INC (See Goodrich Aerostructures)Center Body Assembly 238-0451-501( )Airbus 238-0451-501( )Airbus A320-111, -2111993-10-17current
Rohr INC (See Goodrich Aerostructures)Center Body, Installation 340-6000-505CFM International 340-6000-505CFM International CFM56-5C2, -5C31993-10-17current

Sources: the FAA's service difficulty reports since 1995 (a report is a part that failed and was fixed, as filed by an airline, repair station or owner; the count shows reporting as much as reliability) and the parts manufacturer approvals in the FAA's Dynamic Regulatory System. The part name is the reporters' and the approval holders' own words, reduced to the first plain words so that spellings meet.