Base Ramp
No failure report names the base ramp. 2 FAA approvals let 1 company make a replacement base ramp, B/E Aerospace INC, Flight Structures and Integration Group holding the most (2).
Approved replacement parts 2 parts manufacturer approvals
A parts manufacturer approval (PMA) lets a company other than the aircraft's maker make a base ramp and sell it as an approved part for the models named. These are the companies holding such approvals for a base ramp:
For these models most: Boeing 737 (1), Boeing 727 (1).
| Maker | Part | Replaces | Fits | Granted | Status |
|---|---|---|---|---|---|
| B/E Aerospace INC, Flight Structures and Integration Group | Base Ramp Assembly B32768-10 | BEA B32768-10 | Boeing 737-200 Series | 2001-04-22 | current |
| B/E Aerospace INC, Flight Structures and Integration Group | Base Ramp Assembly B27780-10 | BEA B27780-10 | Boeing 727 Series | 2001-02-06 | current |
Sources: the FAA's service difficulty reports since 1995 (a report is a part that failed and was fixed, as filed by an airline, repair station or owner; the count shows reporting as much as reliability) and the parts manufacturer approvals in the FAA's Dynamic Regulatory System. The part name is the reporters' and the approval holders' own words, reduced to the first plain words so that spellings meet.
