The U.S. aircraft register, updated daily
Parts

Baggage Container

No failure report names the baggage container. 4 FAA approvals let 2 companies make a replacement baggage container, Telair International INC (No Longer Have Pma Production Approval) holding the most (2).

Approved replacement parts 4 parts manufacturer approvals

A parts manufacturer approval (PMA) lets a company other than the aircraft's maker make a baggage container and sell it as an approved part for the models named. These are the companies holding such approvals for a baggage container:

For these models most: Boeing 747 (4).

MakerPartReplacesFitsGrantedStatus
Telair International INC (No Longer Have Pma Production Approval)Lower Baggage Container 625A100-001-103Modification PartBoeing 747-100 Series2000-11-27current
Telair International INC (No Longer Have Pma Production Approval)Lower Baggage Container 621A100-001-101Modification PartBoeing 747-1212000-11-27current
Air Cargo Equipment CORP (No Longer Have Pma Production Approval)Lower Baggage Container 625A100-001-101Modification PartBoeing 747-1211994-01-19current
Air Cargo Equipment CORP (No Longer Have Pma Production Approval)Lower Baggage Container 625A100-001-103Modification PartBoeing 747-100 Series1994-01-19current

Sources: the FAA's service difficulty reports since 1995 (a report is a part that failed and was fixed, as filed by an airline, repair station or owner; the count shows reporting as much as reliability) and the parts manufacturer approvals in the FAA's Dynamic Regulatory System. The part name is the reporters' and the approval holders' own words, reduced to the first plain words so that spellings meet.