Who holds what · as the FAA records the nameAti Engineering Services LLC
Named as the FAA publishes it on its approvals.
Holds 18 approved modifications, most of them for the Cessna 208 Caravan. Holds 266 approvals to make replacement parts. FAA spelling: ATI Engineering Services LLC.
Approved modifications 18 · newest first
2024-08-05SA00294BO · Installation of a Night Vision Goggle (NVG) compatible Lighting System · B200C, B200C (C-12F), B200C (C-12R) 2024-08-05ST00415BO · Installation of an NVIS/NVG compatible lighting system and infrared capable exterior lighting · 700 2024-08-05SA00322BO · Installation of a Supplemental Exterior Lighting System · 200, 200C, 200CT 2024-08-05SA00396BO · Installation of a Mid-Continent Model MD302 Standby Attitude Module (SAM) · 390 2024-08-05SR02443NY-D · Installation or a Night Vision Goggle (NVG) compatible Lighting system · S-92A 2024-08-05SA00419BO · Installation of an Airborne Operator Workstation · 208B 2024-08-05ST00388BO · Installation of a Night Vision Imaging System (NVIS) · DHC-8-315 2024-08-05ST00342BO · Installation of an NVIS / NVG Compatible Lighting System · C-295, CN-235-100, CN-235-200 2024-08-05SA00421BO · Installation of Interior Sidewall Blanket · 208B 2024-08-05SA00341BO · Installation of an NVIS / NVG Compatible Lighting System · 208B 2024-08-05SA00335BO · Installation of a Night Vision Goggle (NVG) compatible Lighting System · 200, 200C, 200CT 2024-08-05SA00363BO · Installation of LED Position Lights · 300, 300LW, B300 2024-08-05SA00301BO · Installation of Light Emitting Diode (LED) based Position, Anticollision, Taxi, and Landing Light Systems with... · 208, 208B 2024-07-15SA00345BO · Installation of an NVIS / NVG Compatible Lighting System · DHC-6-400 2024-06-26SA00236MC · Operational Approval of an L3Harris WESCAM MX-15DR Sensor System · 208B 2024-06-18SA00199MC · Installation of an L3 Harris (Harris Global Communications, Inc.) tactical radio system consisting of an RF-7800H-MP... · 208B 2021-11-26SA00404BO · Installation of a Night Vision Goggle (NVG) compatible Lighting System · B200, B200C (C-12F), B200C (C-12R) 2021-07-14SA00414BO · Installation of Cargo Roller Floor System · 208B
Replacement parts approved 266 parts manufacturer approvals, 266 current · Johnstown, PA
A parts manufacturer approval lets a company make a replacement part for someone else's aircraft or engine and sell it as an approved part. This company's approvals are mostly for other and general (91), instruments and avionics (84), electrical power (74).
2020-01-14LED Lamp 387ATI · replaces MS25237-387, MS25237-387AS15, 387 and 387AS15 · 737 /, -100 Series, -200 Series 2019-07-08LED Lamp 387ATI · replaces MS25237-387, MS25237-387AS15, 387 and 387AS15 · 767 / -2C Series, -200 Series, -300 Series 2017-04-20Audio Panel S92-100511-6027-01 · replaces Modification Part · S-92A 2017-04-20TBRA 2 MOD S92-100511-6005-01 · replaces Modification Part · S-92A 2017-04-20ECS Panel S92-100511-4015-01 · replaces Modification Part · S-92A 2017-04-20Audio Panel S92-100511-4020-01 · replaces Modification Part · S-92A 2017-04-20Relay Bracket S92-100511-3003-01 · replaces Modification Part · S-92A
The first 80 of 266. All part makers.
Source: FAA Dynamic Regulatory System (type certificate data sheets, supplemental type certificates, parts manufacturer approvals, technical standard order authorisations). An organisation's name is as the FAA spelled it on each record; related spellings are separate pages.