eFlight
FAA orders · airworthiness directive · historical

99-27-15: Full Authority Digital Engine Control

FAA order 99-27-15 is an airworthiness directive in force since January 11, 2000. The FAA's subject line: Full Authority Digital Engine Control. It names the General Electric GE90-90B, General Electric GE90 series engines: about 24 aircraft on the U.S. register today across them, though an order usually covers particular versions or serial numbers rather than every one. System: engine.

What it applies to as the FAA lists it

Kind of product
Engine
Makes
General Electric Aircraft Engines; General Electric Aircraft Engines; General Electric Aircraft Engines; General Electric Aircraft Engines; General Electric Aircraft Engines
Models
GE90-76B, GE90-77B, GE90-85B, GE90-90B, GE90-76B, GE90-77B, GE90-85B, GE90-90B, GE90-76B, GE90-77B, GE90-85B, GE90-90B, GE90-76B, GE90-77B, GE90-85B, GE90-90B, GE90-76B, GE90-77B, GE90-85B, GE90-90B
Engine series
General Electric GE90-90B 23 aircraft
General Electric GE90 series 1 aircraft

Dates and paperwork

In force since
January 11, 2000
Published
January 6, 2000
Docket
99-NE-62-AD
Replaced by
2001-21-03
Status
Historical
The FAA's document
Read the order on the FAA's site

The FAA's summary their words, unchanged

This amendment adopts a new airworthiness directive (AD) that is applicable to certain General Electric Company GE90 series turbofan engines. This action requires visually inspecting Ps3 and P3B sense lines and full authority digital engine control (FADEC) Ps3 and P3B sensing ports and fittings, cleaning Ps3 and P3B fittings and sensing ports, purging the Ps3 and P3B systems of moisture, and, if necessary, blending of high metal, nicks, burrs, or scratches on Ps3 and P3B fitting threads. This amendment is prompted by seven reports of loss of thrust control due to corruption of the signals to the FADEC caused by water freezing in the Ps3 sensing system. The actions specified in this AD are intended to prevent loss of thrust control due to corruption of the Ps3 and P3B signals to the FADEC which if it occurs in a critical phase of flight, could result in loss of aircraft control.

The order itself the regulatory text, as published

Show the full text (5,924 characters)
99-27-15 General Electric Company: Amendment 39-11496. Docket 99-NE-62-AD. Issues December 29, 1999. Applicability: General Electric Company (GE) Models GE90-76B, -77B, -85B, -90B, and -92B turbofan engines, installed on but not limited to Boeing 777 series airplanes. Note 1: This airworthiness directive (AD) applies to each engine identified in the preceding applicability provision, regardless of whether it has been modified, altered, or repaired in the area subject to the requirements of this AD. For engines that have been modified, altered, or repaired so that the performance of the requirements of this AD is affected, the owner/operator must request approval for an alternative method of compliance in accordance with paragraph (f) of this AD. The request should include an assessment of the effect of the modification, alteration, or repair on the unsafe condition addressed by this AD; and, if the unsafe condition has not been eliminated, the request should include specific proposed actions to address it. Compliance: Required as indicated, unless accomplished previously. To prevent loss of thrust control due to corruption of the Ps3 and P3B signals to the full authority digital engine control (FADEC), which if it occurs in a critical phase of flight, could result in loss of aircraft control, accomplish the following: Initial Inspection, Cleaning, Moisture Purging, and Blending (a) Perform the following initial actions in accordance with the Accomplishment Instructions, Section (3) of GE Alert Service Bulletin (ASB) No. 73-A0060, dated December 23, 1999: (1) Inspect, clean, moisture purge, and if necessary, blend any high metal, nicks, or burrs on fitting threads, on one engine installed on Boeing 777 series aircraft, within 10 cycles-in-service (CIS) after the effective date of this AD. (2) Inspect, clean, moisture purge, and if necessary, blend any high metal, nicks, or burrs on fitting threads, on the other engineinstalled on the Boeing 777 series aircraft, within 20 CIS after the effective date of this AD. Credit for Previous Inspections, Cleaning, and Moisture Purging (b) Engines that have been inspected, cleaned, and moisture purged in accordance with GE90 All Reps Wire, JSB99-11-24-1, Revision 1, dated November 25, 1999, may count those inspections, cleaning, and moisture purging as accomplished and must be inspected, cleaned, moisture purged, and if necessary, have any high metal, nicks, or burrs on fitting threads blended, in accordance with the Accomplishment Instructions, Section (3) of GE ASB No. 73-A0060, dated December 23, 1999, and the following schedule: (1) Engines that have accumulated 30 CIS or greater since previous inspection, cleaning, and moisture purging on the effective date of the AD must repeat the required procedures within 5 CIS after the effective date of this AD. (2) Engines that have accumulated less than 30 CIS since previous inspection, cleaning, and moisture purging on the effective date of this AD must repeat the required procedures within 30 CIS since last inspection, or within 5 CIS after the effective date of this AD, whichever occurs later. New and Replacement Engines (c) For new and replacement engines, perform the initial inspection, cleaning, and moisture purging, and if necessary, blend any high metal, nicks, or burrs on fitting threads, prior to accumulating 30 CIS since entering service in accordance with the Accomplishment Instructions, Section (3) of GE ASB No. 73-A0060, dated December 23, 1999. Repetitive Inspections (d) Thereafter, inspect, clean, and moisture purge, and if necessary, blend any high metal, nicks, or burrs on fitting threads each engine within 30 CIS since last inspection, in accordance with the Accomplishment Instructions, Section (3) of GE ASB No. 73-A0060, dated December 23, 1999. Idle Leak Check (e) After accomplishing the required actions of this AD, and prior toentry into service, perform an idle leak check to confirm no Ps3 or P3B sense system faults in accordance with the Accomplishment Instructions, Section (3), paragraph (14), of GE ASB No. 73-A0060, dated December 23, 1999. No Simultaneous Actions (f) Do not perform the actions required by this AD concurrently on both engines installed on a Boeing 777 series aircraft Alternative Methods of Compliance (g) An alternative method of compliance or adjustment of the compliance time that provides an acceptable level of safety may be used if approved by the Manager, Engine Certification Office (ECO). Operators shall submit their requests through an appropriate FAA Principal Maintenance Inspector, who may add comments and then send it to the Manager, ECO. Note 2: Information concerning the existence of approved alternative methods of compliance with this airworthiness directive, if any, may be obtained from the ECO. Ferry Flights (h) Special flight permits may beissued in accordance with sections 21.197 and 21.199 of the Federal Aviation Regulations (14 CFR 21.197 and 21.199) to operate the aircraft to a location where the requirements of this AD can be accomplished. Incorporation by Reference (i) The actions required by this AD shall be done in accordance with GE ASB No. 73-A0060, dated December 23, 1999. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies may be obtained from General Electric Company via Lockheed Martin Technology Services, 10525 Chester Road, Suite C, Cincinnati, OH 45215; telephone 513-672-8400, fax 513-672-8422. Copies may be inspected at the FAA, New England Region, Office of the Regional Counsel, 12 New England Executive Park, Burlington, MA; or at the Office of the Federal Register, 800 North Capitol Street, NW, suite 700, Washington, DC. (j) This amendment becomes effective on January 11, 2000.

Source: FAA Dynamic Regulatory System, airworthiness directives. The FAA's document is the authority; the register counts are this site's, from the FAA register of November 24, 2026. Connections as data: /graph/directive/99-27-15.json · aircraft systems.

Aircraft

By kindModelsMakersEnginesFleetsWhat changed

Fly

Plan a flightAirportsLive mapRoutes and flightsFuels

Training and work

TrainingFlight schoolsGround schoolsPilot examinersMedical examinersJobs

Companies

DirectoryCharter operatorsFBOsRepair stationsClaim your listing

Safety and data

AccidentsRecords checkAnalyticsSAFxCHANGEThe graphAbout

Colours follow your device's light or dark setting.