eFlight
FAA orders · airworthiness directive · historical

96-11-05: Inspect Lower Spar Axis Of Pylons

FAA order 96-11-05 is an airworthiness directive in force since June 28, 1996. The FAA's subject line: Inspect Lower Spar Axis Of Pylons. It names Airbus A300: about 120 aircraft on the U.S. register today, though an order usually covers particular versions or serial numbers rather than every one. System: airframe structure.

What it applies to as the FAA lists it

Kind of product
Aircraft
Makes
Airbus Industrie; Airbus; Airbus; Airbus; Airbus; Airbus; Airbus; Airbus; Airbus; Airbus; Airbus; Airbus; Airbus; Airbus; Airbus; Airbus; Airbus; Airbus; Airbus; Airbus; Airbus; Airbus; Airbus; Airbus; Airbus; Airbus; Airbus; Airbus; Airbus; Airbus; Airbus; Airbus; Airbus; Airbus; Airbus; Airbus; Airbus; Airbus; Airbus; Airbus; Airbus; Airbus; Airbus; Airbus; Airbus; Airbus; Airbus; Airbus; Airbus; Airbus; Airbus; Airbus; Airbus; Airbus; Airbus; Airbus; Airbus; Airbus; Airbus
Models
A300 Model B2-1A, A300 Model B2-1C, A300 Model B2-203, A300 Model B2K-3C, A300 Model B4-103, A300 Model B4-203, A300 Model B4-2C, A300 Model B4-600 Series, A300 Model B4-600R Series, A300 Model F4-600R Series, A300B4-601, A300B4-603, A300B4-605R, A300B4-620, A300B4-622R, A300F4-605R, A300F4-622R, A310-203, A310-221, A310-222, A310-304, A310-322, A310-324, A310-325, A310 Model 325
On this site
Airbus A300 120 registered

Dates and paperwork

In force since
June 28, 1996
Docket
95-NM-85-AD
Replaced by
2000-10-18
Status
Historical
The FAA's document
Read the order on the FAA's site

The FAA's summary their words, unchanged

This amendment adopts a new airworthiness directive (AD), applicable to certain Airbus Industrie Model A300, A300-600, and A310 series airplanes, that requires inspections to detect cracks in the lower spar axis of the pylons between ribs 6 and 7, and repair, if necessary. This amendment is prompted by reports that fatigue cracking has been found on the lower spar of the pylon. The actions specified by this AD are intended to prevent such fatigue cracking, which could result in reduced structural integrity of the lower spar of the pylon.

The order itself the regulatory text, as published

Show the full text (15,923 characters)
96-11-05 AIRBUS INDUSTRIE: Amendment 39-9630. Docket 95-NM-85-AD. Applicability: Model A300, A300-600, and A310 series airplanes; as listed in Airbus Industrie Service Bulletins A300-54-0073, A300-54-6014, and A310-54-2017, all Revision 1, all dated March 28, 1994; certificated in any category. NOTE 1: This AD applies to each airplane identified in the preceding applicability provision, regardless of whether it has been modified, altered, or repaired in the area subject to the requirements of this AD. For airplanes that have been modified, altered, or repaired so that the performance of the requirements of this AD is affected, the owner/operator must request approval for an alternative method of compliance in accordance with paragraph (k) of this AD. The request should include an assessment of the effect of the modification, alteration, or repair on the unsafe condition addressed by this AD; and, if the unsafe condition has not been eliminated, the request should include specific proposed actions to address it. Compliance: Required as indicated, unless accomplished previously. To prevent reduced structural integrity of the lower spar, accomplish the following: (a) For Model A300 series airplanes equipped with General Electric CF6-50C engines, and having pylons that have not been modified in accordance with Airbus Industrie Service Bulletin A300-54-0080, Revision 1, dated January 16, 1995: Prior to the accumulation of 10,900 total landings, or within 500 landings after the effective date of this AD, whichever occurs later, perform an internal eddy current inspection to detect cracks in the lower spar axis of the pylons between ribs 6 and 7, in accordance with Airbus Industrie Service Bulletin A300-54-0073, Revision 1, dated March 28, 1994. (1) If no crack is found, repeat the inspection thereafter at intervals not to exceed 6,700 landings. (2) If any crack is found that is less than 35 mm, prior to further flight, stop- drill thecrack in accordance with the procedures specified in Section 51-41-10 of the Structural Repair Manual (SRM). Thereafter, prior to the accumulation of 250 landings after crack discovery, repair in accordance with the service bulletin. Prior to the accumulation of 17,900 landings after accomplishing the repair, perform an eddy current inspection to detect cracks at the stiffener ends, ribs 6 and 7, at the edge of the holes made during the repair and on the fasteners located at the edge of the doubler, in accordance with the service bulletin. (i) If no crack is found, repeat the inspection required by paragraph (a)(2) of this AD thereafter at intervals not to exceed 15,000 landings. (ii) If any crack is found, prior to further flight, repair in accordance with a method approved by the Manager, Standardization Branch, ANM-113, FAA, Transport Airplane Directorate. (3) If any crack is found that is greater than or equal to 35 mm, prior to further flight, repair in accordance with a method approved by the Manager, Standardization Branch, ANM-113. (b) For Model A300 series airplanes equipped with General Electric CF6-50C engines, and having pylons that have been modified in accordance with Airbus Industrie Service Bulletin A300-54-0080, Revision 1, dated January 16, 1995: Prior to the accumulation of 30,300 landings since installation of the modification, or within 500 landings after the effective date of this AD, whichever occurs later, perform an eddy current inspection to detect cracks in the lower spar axis of the pylons between ribs 6 and 7, in accordance with Airbus Industrie Service Bulletin A300-54-0073, Revision 1, dated March 28, 1994. (1) If no crack is found, repeat the eddy current inspection thereafter at intervals not to exceed 21,300 landings. (2) If any crack is found, prior to further flight, repair in accordance with a method approved by the Manager, Standardization Branch, ANM-113. (c) For Model A300 series airplanes equipped with Pratt & Whitney JT9D-59A engines, and having pylons that have not been modified in accordance with Airbus Industrie Service Bulletin A300-54-0080, Revision 1, dated January 16, 1995: Prior to the accumulation of 8,600 total landings, or within 500 landings after the effective date of this AD, whichever occurs later, perform an internal eddy current inspection to detect cracks in the lower spar axis of the pylons between ribs 6 and 7, in accordance with Airbus Industrie Service Bulletin A300-54-0073, Revision 1, dated March 28, 1994. (1) If no crack is found, repeat the inspection thereafter at intervals not to exceed 5,700 landings. (2) If any crack is found that is less than 35 mm, prior to further flight, stop- drill the crack in accordance with the procedures specified in Section 51-41-10 of the SRM. Thereafter, prior to the accumulation of 250 landings after crack discovery, repair in accordance with the service bulletin. Prior to the accumulation of 14,200 landings after accomplishing the repair, perform an eddy current inspection to detect cracks at the stiffener ends, ribs 6 and 7, at the edge of the holes made during the repair and on the fasteners located at the edge of the doubler, in accordance with the service bulletin. (i) If no crack is found, repeat the inspection required by paragraph (c)(2) of this AD thereafter at intervals not to exceed 12,800 landings. (ii) If any crack is found, prior to further flight, repair in accordance with a method approved by the Manager, Standardization Branch, ANM-113. (3) If any crack is found that is greater than or equal to 35 mm, prior to further flight, repair in accordance with a method approved by the Manager, Standardization Branch, ANM-113. (d) For Model A300 series airplanes equipped with Pratt & Whitney JT9D-59A engines, and having pylons that have been modified in accordance with Airbus Industrie Service Bulletin A300-54-0080, Revision 1, dated January 16, 1995: Prior to the accumulation of 24,000 landings since installation of the modification, or within 500 landings after the effective date of this AD, whichever occurs later, perform an eddy current inspection to detect cracks in the lower spar axis of the pylons between ribs 6 and 7, in accordance with Airbus Industrie Service Bulletin A300-54-0073, Revision 1, dated March 28, 1994. (1) If no crack is found, repeat the eddy current inspection thereafter at intervals not to exceed 18,200 landings. (2) If any crack is found, prior to further flight, repair in accordance with a method approved by the Manager, Standardization Branch, ANM-113. (e) For Model A300-600 series airplanes equipped with General Electric CF6-80C2 engines, and having pylons that have not been modified in accordance with Airbus Industrie Service Bulletin A300-54-6020, dated February 22, 1994: Prior to the accumulation of 9,400 total landings, or within 500 landings after the effective date of this AD, whichever occurslater, perform an internal eddy current inspection to detect cracks in the lower spar axis of the pylons between ribs 6 and 7, in accordance with Airbus Industrie Service Bulletin A300-54-6014, Revision 1, dated March 28, 1994. (1) If no crack is found, repeat the inspection thereafter at intervals not to exceed 6,100 landings. (2) If any crack is found that is less than or equal to 35 mm, prior to further flight, stop-drill the crack in accordance with the procedures specified in Section 51-41-10 of the SRM. Thereafter, prior to the accumulation of 250 landings after crack discovery, repair in accordance with the service bulletin. Prior to the accumulation of 15,600 landings after accomplishing the repair, perform an eddy current inspection to detect cracks at the stiffener ends, ribs 6 and 7, at the edge of the holes made during the repair and on the fasteners located at the edge of the doubler, in accordance with the service bulletin. (i) If no crack is found, repeat the inspection required by paragraph (e)(2) of this AD thereafter at intervals not to exceed 13,600 landings. (ii) If any crack is found, prior to further flight, repair in accordance with a method approved by the Manager, Standardization Branch, ANM-113. (3) If any crack is found that is greater than or equal to 35 mm, prior to further flight, repair in accordance with a method approved by the Manager, Standardization Branch, ANM-113. (f) For Model A300-600 series airplanes equipped with General Electric CF6-80C2 engines, and having pylons that have been modified in accordance with Airbus Industrie Service Bulletin A300-54-6020, dated February 22, 1994: Prior to the accumulation of 26,400 landings since installation of the modification, or within 500 landings after the effective date of this AD, whichever occurs later, perform an eddy current inspection to detect cracks in the lower spar axis of the pylons between ribs 6 and 7, in accordance with Airbus Industrie Service Bulletin A300-54-6014, Revision 1, dated March 28, 1994. (1) If no crack is found, repeat the eddy current inspection thereafter at intervals not to exceed 19,400 landings. (2) If any crack is found, prior to further flight, repair in accordance with a method approved by the Manager, Standardization Branch, ANM-113. (g) For Model A300-600 series airplanes equipped with Pratt & Whitney JT9D-7R4 or PW 4000 engines, and having pylons that have not been modified in accordance with Airbus Industrie Service Bulletin A300-54-6020, dated February 22, 1994: Prior to the accumulation of 5,700 total landings, or within 500 landings after the effective date of this AD, whichever occurs later, perform an internal eddy current inspection to detect cracks in the lower spar axis of the pylons between ribs 6 and 7, in accordance with Airbus Industrie Service Bulletin A300-54-6014, Revision 1, dated March 28, 1994. (1) If no crack is found, repeat the inspection thereafter at intervals not to exceed 4,400 landings. (2) If any crack is found that is less than 35 mm, prior to further flight, stop- drill the crack in accordance with the procedures specified in Section 51-41-10 of the SRM. Thereafter, prior to the accumulation of 250 landings after crack discovery, repair in accordance with the service bulletin. Prior to the accumulation of 10,100 landings after accomplishing the repair, perform an eddy current inspection to detect cracks at the stiffener ends, ribs 6 and 7, at the edge of the holes made during the repair and on the fasteners located at the edge of the doubler, in accordance with the service bulletin. (i) If no crack is found, repeat the inspection required by paragraph (g)(2) of this AD thereafter at intervals not to exceed 10,000 landings. (ii) If any crack is found, prior to further flight, repair in accordance with a method approved by the Manager, Standardization Branch, ANM-113. (3) If any crack is found that is greater than or equal to 35 mm, prior to further flight, repair in accordance with a method approved by the Manager, Standardization Branch, ANM-113. (h) For Model A300-600 series airplanes equipped with Pratt & Whitney JT9D-7R4 or PW 4000 engines, and having pylons that have been modified in accordance with Airbus Industrie Service Bulletin A300-54-6020, dated February 22, 1994: Prior to the accumulation of 17,000 landings since installation of the modification, or within 500 landings after the effective date of this AD, whichever occurs later, perform an eddy current inspection to detect cracks in the lower spar axis of the pylons between ribs 6 and 7, in accordance with Airbus Industrie Service Bulletin A300-54-6014, Revision 1, dated March 28, 1994. (1) If no crack is found, repeat the eddy current inspection thereafter at intervals not to exceed 14,500 landings. (2) If any crack is found, prior to further flight, repair in accordance with a method approved by the Manager, StandardizationBranch, ANM-113. (i) For Model A310 series airplanes equipped with General Electric CF6-80C2, or Pratt & Whitney JT9D-7R4, or Pratt & Whitney PW4000 engines: Prior to the accumulation of 36,700 total landings, or within 500 landings after the effective date of this AD, whichever occurs later, perform an internal eddy current inspection to detect cracks in the lower spar axis of the pylons between ribs 6 and 7, in accordance with Airbus Industrie Service Bulletin A310-54-2017, Revision 1, dated March 28, 1994. (1) If no crack is found, repeat the inspection thereafter at intervals not to exceed 15,000 landings. (2) If any crack is found that is less than 35 mm, prior to further flight, stop- drill the crack in accordance with the procedures specified in Section 51-41-10 of the SRM. Thereafter, prior to the accumulation of 250 landings after crack discovery, repair in accordance with the service bulletin. Prior to the accumulation of 40,000 landings after accomplishing therepair, perform an eddy current inspection to detect cracks at the stiffener ends, ribs 6 and 7, at the edge of the holes made during the repair and on the fasteners located at the edge of the doubler, in accordance with the service bulletin. (i) If no crack is found, repeat the inspection required by paragraph (i)(2) of this AD thereafter at intervals not to exceed 33,000 landings. (ii) If any crack is found, prior to further flight, repair in accordance with a method approved by the Manager, Standardization Branch, ANM-113. (3) If any crack is found that is greater than or equal to 35 mm, prior to further flight, repair in accordance with a method approved by the Manager, Standardization Branch, ANM-113. (j) For Model A310 series airplanes equipped with General Electric CF6-80C2, or Pratt & Whitney JT9D-7R4, or Pratt & Whitney PW4000 engines: Accomplishment of the modification specified in Airbus Industrie Service Bulletin A310-54-2023, dated October 15, 1993, constitutes terminating action for the inspections required by paragraph (i) of this AD. (k) An alternative method of compliance or adjustment of the compliance time that provides an acceptable level of safety may be used if approved by the Manager, Standardization Branch, ANM-113. Operators shall submit their requests through an appropriate FAA Principal Maintenance Inspector, who may add comments and then send it to the Manager, Standardization Branch, ANM-113. NOTE 2: Information concerning the existence of approved alternative methods of compliance with this AD, if any, may be obtained from the Standardization Branch, ANM-113. (l) Special flight permits may be issued in accordance with sections 21.197 and 21.199 of the Federal Aviation Regulations (14 CFR 21.197 and 21.199) to operate the airplane to a location where the requirements of this AD can be accomplished. (m) The actions shall be done in accordance with the following Airbus Industrie service bulletins, whichcontain the specified effective pages: Service Bulletin Referenced and Date Revision Level Page Number Date Shown on Page Shown on Page A300-54-0073, Revision 1, March 28, 1994 1, 5 2-4, 6-36 1 Original March 28, 1994 October 15, 1993 A300-54-6014, Revision 1, March 28, 1994 1-4, 13 5-12, 14-44 1 Original March 28, 1994 October 15, 1993 A310-54-2017, Revision 1, March 28, 1994 1, 5 2-4, 6-48 1 Original March 28, 1994 October 15, 1993 A310-54-2023, October 15, 1993 1-38 Original October 15, 1993 This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies may be obtained from Airbus Industrie, 1 Rond Point Maurice Bellonte, 31707 Blagnac Cedex, France. Copies may be inspected at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the Office of the Federal Register, 800 North Capitol Street, NW., suite 700, Washington, DC. (n) This amendment becomes effective on June 28, 1996.

Related safety bulletins advice on the same designs, not orders

2019-02-19NE-19-03 · Escape Slide Maintenance Tasks and Intervals - JASC 2565
2008-12-11NM-09-03 · Engine Fuel and Control - Implementing Fuel Tank System Airworthiness Limitations
2008-07-02NM-08-31 · Equipment/Furnishings: Non-Textile Floors
2006-12-11SW-07-13 · Oxygen Reserve Cylinder
2006-07-27NM-06-57 · Reports of damage to airplanes and to property on the ground caused by blue or clear ice falling from airplanes.

Source: FAA Dynamic Regulatory System, airworthiness directives. The FAA's document is the authority; the register counts are this site's, from the FAA register of November 24, 2026. Connections as data: /graph/directive/96-11-05.json · aircraft systems.

Aircraft

By kindModelsMakersEnginesFleetsWhat changed

Fly

Plan a flightAirportsLive mapRoutes and flightsFuels

Training and work

TrainingFlight schoolsGround schoolsPilot examinersMedical examinersJobs

Companies

DirectoryCharter operatorsFBOsRepair stationsClaim your listing

Safety and data

AccidentsRecords checkAnalyticsSAFxCHANGEThe graphAbout

Colours follow your device's light or dark setting.