eFlight
FAA orders · airworthiness directive · historical

94-18-03: Airworthiness Directives; Rolls-Royce plc RB211 Series Turbofan Engines

FAA order 94-18-03 is an airworthiness directive in force since September 26, 1994. It names the Rolls-Royce RB-211 series, Rolls-Royce RB211-22B-02, Rolls-Royce RB211-524H-36, Rolls-Royce RB211-524HT36 engines: about 187 aircraft on the U.S. register today across them, though an order usually covers particular versions or serial numbers rather than every one. System: engine.

What it applies to as the FAA lists it

Kind of product
Engine
Makes
Rolls-Royce plc
Models
RB211-22B-02, RB211-22B/MOD 72-8700, RB211-524-02, RB211-524B-02, RB211-524B-B-02, RB211-524B2-19, RB211-524B2-B-19, RB211-524B3-02, RB211-524B4-02, RB211-524B4-D-02, RB211-524C2-19, RB211-524C2-B-19, RB211-524D4-19, RB211-524D4-39, RB211-524D4-B-19, RB211-524D4-B-39, RB211-524D4X-19, RB211-524D4X-B-19, RB211-524G2-19, RB211-524G2-T-19, RB211-524G3-19, RB211-524G3-T-19, RB211-524H-36, RB211-524H-T-36, RB211-524H2-19, RB211-524H2-T-19
Engine series
Rolls-Royce RB-211 series 182 aircraft
Rolls-Royce RB211-22B-02 1 aircraft
Rolls-Royce RB211-524H-36 2 aircraft
Rolls-Royce RB211-524HT36 2 aircraft

Dates and paperwork

In force since
September 26, 1994
Published
September 9, 1994
Docket
94-ANE-16
Replaced by
2000-11-10
Status
Historical
The FAA's document
Read the order on the FAA's site

The FAA's summary their words, unchanged

This amendment adopts a new airworthiness directive (AD) that is applicable to Rolls- Royce plc (R-R) RB211 series turbofan engines. This action requires removing from service intermediate pressure (IP) compressor stage 6-7 rotor shafts that exceed new, reduced cyclic life limits. This amendment is prompted by a report of an uncontained failure of an IP compressor stage 6-7 rotor shaft. The actions specified in this AD are intended to prevent an uncontained engine failure due to rupture of an IP compressor stage 6-7 rotor shaft. The incorporation by reference of certain publications listed in the regulations is approved by the Director of the Federal Register as of September 26, 1994. Comments for inclusion in the Rules Docket must be received on or before November 8, 1994.

The order itself the regulatory text, as published

Show the full text (6,901 characters)
94-18-03 Rolls-Royce plc: Amendment 39-9016. Docket 94-ANE-16. Applicability: Rolls-Royce plc (R-R) Model RB211-22B and -524 series turbofan engines, not incorporating thicker intermediate pressure (IP) compressor stage 6-7 rotor shafts in accordance with R-R Service Bulletin (SB) RB.211-72-5787, dated March 20, 1981, and incorporating IP compressor stage 6-7 rotor shafts that have not been reworked in accordance with R-R SB RB.211- 72-9594, Revision 5, dated February 12, 1993. These engines are installed on but not limited to Boeing 747 series and 767 series, and Lockheed L-1011 series aircraft. Compliance: Required as indicated, unless accomplished previously. To prevent an uncontained engine failure due to rupture of an IP compressor stage 6-7 rotor shaft, accomplish the following: (a) For R-R RB211-22B series engines, accomplish the following: (1) For IP compressor stage 6-7 rotor shafts that have greater than or equal to 14,000 cycles in service (CIS) on theeffective date of this AD, remove the rotor shafts within 15 days after the effective date of this AD, and replace with a serviceable part. (2) For IP compressor stage 6-7 rotor shafts that have less than 14,000 CIS but greater than 11,000 CIS on the effective date of this AD, remove the rotor shafts at the next shop visit, or prior to 45 days after the effective date of this AD, whichever occurs first, and replace with a serviceable part. (3) For IP compressor stage 6-7 rotor shafts that have 11,000 or less CIS on the effective date of this AD, remove the rotor shafts on or before 11,000 CIS, or 45 days after the effective date of this AD, whichever occurs later, and replace with a serviceable part. (4) Subsequent to 45 days after the effective date of this AD, the new life limit for the IP compressor stage 6-7 rotor shafts that have not been reworked in accordance with R-R SB RB.211-72-9594, Revision 5, dated February 12, 1993, shall be 11,000 CIS. (5) Rotor shafts that are reworked in accordance with R-R Service Bulletin No. RB.211-72-9594, Revision 5, dated February 12, 1993, may remain in service until their assigned life limits are reached. (b) For all affected R-R RB211-524 series engines excluding R-R Models RB211-524D4, - 524G, and -524H, accomplish the following: (1) For IP compressor stage 6-7 rotor shafts that have greater than or equal to 10,500 CIS on the effective date of this AD, remove the rotor shafts within 15 days after the effective date of this AD, and replace with a serviceable part. (2) For IP compressor stage 6-7 rotor shafts that have less than 10,500 CIS but greater than 7,500 CIS on the effective date of this AD, remove the rotor shafts at the next shop visit, or January 31, 1995, whichever occurs first, and replace with a serviceable part. (3) For IP compressor stage 6-7 rotor shafts that have 7,500 or less CIS on the effective date of this AD, remove the rotor shafts on or before 7,500 CIS, or January 31,1995, whichever occurs later, and replace with a serviceable part. (4) After January 31, 1995, the new life limit for the IP compressor stage 6-7 rotor shafts that have not been reworked in accordance with R-R SB RB.211-72-9594, Revision 5, dated February 12, 1993, shall be 7,500 CIS. (5) Rotor shafts that are reworked in accordance with R-R Service Bulletin No. RB.211-72-9594, Revision 5, dated February 12, 1993, may remain in service until their assigned life limits are reached. (c) For R-R Models RB211-524D4, -524G, and -524H engines, and all other models of R-R RB211-524 series engines with the thicker IP compressor stage 6-7 rotor shaft in accordance with R-R SB RB.211-72-5787, dated March 20, 1981, accomplish the following: (1) For IP compressor stage 6-7 rotor shafts that have greater than or equal to 10,500 CIS on the effective date of this AD, remove the rotor shafts within 15 days after the effective date of this AD, and replace with a serviceable part. (2)For IP compressor stage 6-7 rotor shafts that have less than 10,500 CIS but greater than 8,500 CIS on the effective date of this AD, remove the rotor shafts at the next shop visit, or January 31, 1995, whichever occurs first, and replace with a serviceable part. (3) For IP compressor stage 6-7 rotor shafts that have 8,500 or less CIS on the effective date of this AD, remove the rotor shafts on or before 8,500 CIS, or January 31, 1995, whichever occurs later, and replace with a serviceable part. (4) After January 31, 1995, the new life limit for the IP compressor stage 6-7 rotor shafts shall be 8,500 CIS. (5) Rotor shafts that are reworked in accordance with R-R Service Bulletin No. RB.211-72-9594, Revision 5, dated February 12, 1993, may remain in service until their assigned life limits are reached. (d) An alternative method of compliance or adjustment of the compliance time that provides an acceptable level of safety may be used if approved by the Manager, Engine Certification Office. The request should be forwarded through an appropriate FAA Principal Maintenance Inspector, who may add comments and then send it to the Manager, Engine Certification Office. NOTE: Information concerning the existence of approved alternative methods of compliance with this airworthiness directive, if any, may be obtained from the Engine Certification Office. (e) Special flight permits may be issued in accordance with sections 21.197 and 21.199 of the Federal Aviation Regulations (14 CFR 21.197 and 21.199) to operate the aircraft to a location where the requirements of this AD can be accomplished. (f) The rework, if accomplished, shall be done in accordance with the following service documents: Document No. Pages Revision Date R-R SB No. RB.211-72-9594 1 5 February 12, 1993 2 Original February 5, 1992 3 4 November 13, 1992 4 2 May 8, 1992 5 4 November 13, 1992 6-6A 2 May 8, 1992 7 Original February 5, 1992 8-9 2 May 8, 1992 10 3 August 7, 1992 11-14 2 May 8, 1992 15-18 Original February 5, 1992 19-20 4 November 13, 1992 21 Original February 5, 1992 22-25 2 May 8, 1992 Supplement 1 2 May 8, 1992 Appendix 1 1-4 5 February 12, 1993 5 Original February 5, 1992 Total pages: 32. R-R SB No. RB.211-72-5787 1-6 Original March 20, 1981 Supplement 1 Original March 20, 1981 Total pages: 7. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies may be obtained from Rolls-Royce plc, Technical Publications Department, P.O. Box 31, Derby, England. Copies may be inspected at the FAA, New England Region, Office of the Assistant Chief Counsel, 12 New England Executive Park, Burlington, MA; or at the Office of the Federal Register, 800 North Capitol Street, NW., suite 700, Washington, DC. (g) This amendment becomes effective onSeptember 26, 1994.

Source: FAA Dynamic Regulatory System, airworthiness directives. The FAA's document is the authority; the register counts are this site's, from the FAA register of November 24, 2026. Connections as data: /graph/directive/94-18-03.json · aircraft systems.

Aircraft

By kindModelsMakersEnginesFleetsWhat changed

Fly

Plan a flightAirportsLive mapRoutes and flightsFuels

Training and work

TrainingFlight schoolsGround schoolsPilot examinersMedical examinersJobs

Companies

DirectoryCharter operatorsFBOsRepair stationsClaim your listing

Safety and data

AccidentsRecords checkAnalyticsSAFxCHANGEThe graphAbout

Colours follow your device's light or dark setting.