Show the full text (4,945 characters)
2004-04-05 Rolls-Royce Corporation: Amendment 39-13486. Docket No. 2000-NE-29-AD.
Effective Date
(a) This airworthiness directive (AD) becomes effective March 9, 2004.
Affected ADs
(b) This AD supersedes AD 2001-08-15, Amendment 39-12192.
Applicability
(c) This AD is applicable to Rolls-Royce Corporation (RR) (formerly Allison Engine Company) AE 3007A, AE 3007A1/1, AE 3007A1/ 2, AE 3007A1, AE 3007A1/3, AE 3007A1P, and AE 3007A3 turbofan engines. These engines are installed on, but not limited to, Embraer Model EMB-145, EMB-145ER, EMB-145MR, EMB-145LR, EMB-135ER, and EMB- 135LR airplanes.
Unsafe Condition
(d) This AD is prompted by design changes introduced by the manufacturer that reduce the No. 1 bearing load. The actions specified in this AD are intended to prevent the rapid failure of the No. 1 bearing, which could result in smoke in the cabin and an uncommanded in-flight engine shutdown.
Compliance
(e) You are responsible for having the actions required by this AD performed within the compliance times specified unless the actions have already been done.
Inspection for Bearing Material Contamination of the Oil System
(f) Inspect for bearing material contamination of the oil system using paragraph 2.A. of the Accomplishment Instructions of RR service bulletin (SB) No. AE 3007A-79-034, dated May 14, 2002, as follows:
(1) Initially inspect within 50 flight hours or five flight days after the effective date of this AD.
(2) Thereafter, inspect every 50 flight hours or every five flight days.
Terminating Actions
(g) As terminating actions to the repetitive inspections specified in paragraph (f)(2) of this AD, do any one of the following paragraphs (g)(1) through (g)(7), by December 31, 2007:
(1) Modify high pressure (HP)-to-low pressure (LP) seal assembly, part number (P/N) 23068183, and remark to P/N 23073953, at engine overhaul, using RR SB AE 3007A-72-199, Revision 3, dated May 13, 2002.(2) Install new design HP-to-LP seal assembly, P/N 23074729, at engine overhaul, using RR SB AE 3007A-72-213, Revision 1, dated May 13, 2002.
(3) Install new design HP-to-LP seal assembly, P/N 23077397, at engine overhaul, using RR SB AE 3007A-72-213, Revision 2, dated November 20, 2003.
(4) Install new design HP-to-LP seal assembly, P/N 23074463, at engine overhaul, using RR SB AE 3007A-72-248, dated July 29, 2003.
(5) Modify HP-to-LP seal assembly, P/N 23074729, and remark to P/N 23076526, at engine overhaul, using RR SB AE 3007A-72-263, Revision 1, dated March 4, 2003.
(6) Modify HP-to-LP seal assembly, P/N 23074729 or P/N 23076526, and remark to P/N 23077397, at engine overhaul, using RR SB AE 3007A-72-284, dated October 16, 2003.
(7) Using Embraer SB 145-79-0001, dated April 24, 1998, modify the airplane wiring so that the oil impending bypass message will be displayed in the cockpit when the primary engine magnetic chip detector captures debris.Alternative Methods of Compliance
(h) The Manager, Chicago Aircraft Certification Office, has the authority to approve alternative methods of compliance for this AD if requested using the procedures found in 14 CFR 39.19.
Material Incorporated by Reference
(i) The Director of the Federal Register approved the incorporation by reference of the Rolls-Royce (RR) documents and Embraer document listed in Table 1 of this AD in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. You may get RR copies from Rolls- Royce Corporation, P.O. Box 420, Indianapolis, IN 46206-0420; telephone (317) 230-3030, and Embraer copies from Emprasa Brasiliera de Aeronautica S.A. (EMBRAER), P.O. Box 343-CEP 12.225, Sao Jose dos Campos-SP, Brazil. You may review copies at the FAA, New England Region, Office of the Regional Counsel, 12 New England Executive Park, Burlington, MA; or at the Office of the Federal Register, 800 North Capitol Street, NW., suite 700, Washington, DC. Table 1 follows:
Table 1.--Incorporation by Reference
Service bulletin
Page number(s) shown on the page
Revision level shown on the page
Date shown on the page
RR SB AE 3007A-79-034
All ...........................
Original ..................
May 14, 2002.
RR SB AE 3007A-72-199
All ...........................
3 .............................
May 13, 2002.
RR SB AE 3007A-72-213
All ...........................
1 .............................
May 13, 2002.
RR SB AE 3007A-72-213
All ...........................
2 .............................
November 20, 2003.
RR SB AE 3007A-72-248
All ...........................
Original ..................
July 29, 2003.
RR SB AE 3007A-72-263
All ...........................
1 .............................
March 4, 2003.
RR SB AE 3007A-72-284
All ...........................
Original ..................
October 16, 2003.
Embraer SB-145-79-0001
All ...........................
Original ..................April 24, 1998.
Related Information
(j) None.