Show the full text (5,569 characters)
2002-01-29 Rolls-Royce, plc: Amendment 39-12624. Docket No. 2001-NE-02-AD.
Applicability
This airworthiness directive (AD) is applicable to Rolls-Royce, plc. (RR) models Tay 650-15 and 651-54 turbofan engines with high pressure compressor (HPC) outlet guide vane (OGV) retaining bolts part numbers (P/N's) BLT3602, DU909, and DU818 installed. These engines are installed on, but not limited to Boeing 727 and Fokker F.28 Mark 0100 airplanes.
Note 1: This AD applies to each engine identified in the preceding applicability provision, regardless of whether it has been modified, altered, or repaired in the area subject to the requirements of this AD. For engines that have been modified, altered, or repaired so that the performance of the requirements of this AD is affected, the owner/operator must request approval for an alternative method of compliance in accordance with paragraph (e) of this AD. The request should include an assessment of the effect of the modification, alteration, or repair on the unsafe condition addressed by this AD; and, if the unsafe condition has not been eliminated, the request should include specific proposed actions to address it.
Compliance
Compliance with this AD is required as indicated, unless already done.
To prevent an uncontained failure of the HPC stage 11/12 disc spacer, which could result in damage to the airplane, do the following:
Initial Inspection
(a) Perform borescope inspection to the rear side of the stage 12 rotor disc in accordance with paragraph 3.A.(1) of the Accomplishment Instructions of RR Mandatory Service Bulletin (SB) Tay-72-1483, Revision 2, dated October 20, 2000, at or before accumulating 8,000 cycles on the OGV retaining bolts, or within 30 days from the effective date of this AD, whichever occurs later. If damage is observed on the stage 12 rotor disc, replace unserviceable parts with serviceable parts as necessary.
Repetitive Inspections
(b) Thereafter, perform repetitive borescope inspections of the rear side of the stage 12 rotor disc no earlier than 1,800 and no later than 2,200 cycles-since-last-inspection, or no later than 18 months since-last-inspection, whichever occurs first, in accordance with paragraph 3.A.(1) of the Accomplishment Instructions of RR mandatory SB Tay-72-1483, Revision 2, dated October 20, 2000. If damage is observed on the stage 12 rotor disc, replace unserviceable parts with serviceable parts as necessary.
OGV Retaining Bolt Replacement
(c) For engines that had OGV bolts replaced with new bolts P/N's BLT3602, DU909, and DU818 as specified in RR SB Tay-72-1484, the initial and repetitive inspection requirements, based on engine cycles-since-bolt installation, are the same as specified in paragraphs (a) and (b) of this AD.
Terminating Action for the Inspections Required by This AD
(d) Before October 1, 2005 for Tay 650-15 engines, and before October 1, 2012 for Tay 651-54 engines, install new design retaining and locking hardware for the HPC OGV and outer seal housing assembly, in accordance with paragraph 3 of the Accomplishment Instructions of RR mandatory SB Tay-72-1498, dated October 20, 2000, or RR mandatory SB Tay-72-1498, Revision 1, dated December 1, 2000. After performing this action, the inspections specified in paragraphs (a) through (c) of this AD are no longer required.
Alternative Methods of Compliance
(e) An alternative method of compliance or adjustment of the compliance time that provides an acceptable level of safety may be used if approved by the Manager, Engine Certification Office (ECO). Operators must submit their requests through an appropriate FAA Principal Maintenance Inspector, who may add comments and then send it to the Manager, ECO.
Note 2: Information concerning the existence of approved alternative methods of compliance with this airworthiness directive, if any, may be obtained from the ECO.
Special Flight Permits
(f) Special flight permits may be issued in accordance with Secs. 21.197 and 21.199 of the Federal Aviation Regulations (14 CFR 21.197 and 21.199) to operate the airplane to a location where the requirements of this AD can be done.
Documents That Have Been Incorporated by Reference
(g) The inspections and replacements must be done in accordance with the following Rolls-Royce plc, mandatory SB's:
Document No.
Pages
Revision
Date
SB Tay-72-1483
1-4
5
2
Original
October 20, 2000.
December 2, 1999.
Appendix 1
1-4
2
October 20, 2000.
Appendix 2
1-2
2
October 20, 2000.
Total pages: 11
SB Tay-72-1498
1-38
Original
October 20, 2000.
Total pages: 38
SB Tay-72-1498
1-38
1
December 1, 2000
Total pages: 38
The incorporations by reference were approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies may be obtained from Rolls-Royce plc, PO Box 31 Derby, DE24 8BJ, United Kingdom; telephone 011-44-1332-242424; fax 011-44-1332-249936. Copies may be inspected, by appointment, at the FAA, New England Region, Office of the Regional Counsel, 12 New England Executive Park, Burlington, MA; or at the Office of the Federal Register, 800 North Capitol Street, NW., suite 700, Washington, DC.
Note 3: The subject of This AD is addressed in Civil Airworthiness Authority airworthiness directives AD 005-12-99, dated December 2, 1999; and AD 003-10-2000, dated December 1, 2000, in order to assure the airworthiness of these RR Tay engines in the UK.
Effective Date of This AD
(h) This amendment becomes effective on February 15, 2002.