Show the full text (6,182 characters)
2002-01-27 General Electric Company (GE): Amendment 39-12622. Docket No. 98-ANE-17-AD. Supersedes AD 98-15-03, Amendment 39-10654.
Applicability. This airworthiness directive (AD) is applicable to General Electric Company (GE) GE90-76B, -77B, --85B, and -90B turbofan engines, with high pressure compressor (HPC) stage 2-6 spools, part numbers (P/N's) 350-005-761-0, 350-005-765-0, and 350-005-770-0 (serial number (SN) LAO37677 only), installed. These engines are installed on, but not limited to, Boeing 777 airplanes.
Note 1: This AD applies to each engine identified in the preceding applicability provision, regardless of whether it has been modified, altered, or repaired in the area subject to the requirements of this AD. For engines that have been modified, altered, or repaired so that the performance of the requirements of this AD is affected, the owner/operator must request approval for an alternative method of compliance in accordance with paragraph (f) of this AD. The request should include an assessment of the effect of the modification, alteration, or repair on the unsafe condition addressed by this AD; and, if the unsafe condition has not been eliminated, the request should include specific proposed actions to address it.
Compliance. Compliance with this AD is required as indicated, unless already done.
To prevent failure of the HPC stage 2-6 spool due to cracks, which could result in an uncontained engine failure and damage to the airplane, do the following:
(a) Perform initial and repetitive eddy current inspections (ECI) of the spacer arm, forward and aft of the stage 3-4 and 4-5 seal teeth, for cracks in accordance with the Accomplishment Instructions of GE Alert Service Bulletin (ASB) No. GE90 72-A0357, Revision 4, dated July 31, 2000, as follows:
(1) Perform the initial inspection before exceeding 500 cycles-since-new (CSN).
(2) Thereafter, inspect at intervals not to exceed 250 cycles-in-service since last inspection.(3) Remove the spool from the engine if the ECI reveals a crack indication and replace with a serviceable spool before returning the engine to service.
(4) Inspections required by this paragraph may be performed using an ECI for cracks in the HPC stage 2-6 spool interstage seal teeth in accordance with GE Service Bulletin (SB) No. GE90 S/B 72-0352, Revision 4, dated July 31, 2000.
(b) At each shop visit as defined in paragraph (e) of this AD, perform ECI for cracks in the HPC stage 2-6 spool interstage seal teeth in accordance with the Accomplishment Instructions of GE SB No. GE90 S/B 72-0352, Revision 4, dated July 31, 2000.
(1) Replace spools with a crack indication with a serviceable spool before returning the engine to service.
(2) If the HPC stage 2-6 spool is not exposed, the inspection required by this paragraph may be performed using an ECI for cracks in the HPC spacer arm, forward and aft of the stage 3-4 and 4-5 seal teeth, in accordance with the Accomplishment Instructions of GE ASB No. GE90 72-A0357, Revision 4, dated July 31, 2000.
(c) Remove from service HPC stage 2-6 spools, P/N 350-005-761-0, 350-005-765-0 and 350-005-770-0 (SN LAO37677 only), before accumulating 4,800 CSN for spools on the GE90-76B and -77B engine models and 4,600 CSN for spools on the GE90-85B and the -90B engine models, or by June 30, 2005, whichever occurs first.
Credit for Previous Inspections
(d) Inspections performed before the effective date of this AD using the following SB's may be counted toward satisfying the initial and repetitive inspection requirements of paragraph (a) of this AD:
(1) Inspections completed using GE ASB No. GE90 72-A0357, Revision 2, dated April 21, 1998; or Revision 3, dated October 27, 1999.
(2) Inspections completed during shop visits using GE SB No. GE90 S/B 72-0352, Revision 2, dated March 31, 1998; or Revision 3, dated July 12, 1999.
Definitions
(e) For the purpose of this AD, an engine shop visit is defined as any time an engine has maintenance performed that involves separation of a major engine flange (such as removal of a low pressure turbine module or HPC "top case"). However, the replacement of the stage 3 and 4 variable stator vane bushings and sealing flanges using GE SB No. GE90 S/B 72-0537, dated June 22, 2001 is not considered a shop visit.
Alternative Methods of Compliance
(f) An alternative method of compliance or adjustment of the compliance time that provides an acceptable level of safety may be used if approved by the Manager, Engine Certification Office (ECO). Operators must submit their requests through an appropriate FAA Principal Maintenance Inspector, who may add comments and then send it to the Manager, ECO.
Note 2: Information concerning the existence of approved alternative methods of compliance with this airworthiness directive, if any, may be obtained from the ECO.
Special Flight Permits
(g) Special flight permits may beissued in accordance with Secs. 21.197 and 21.199 of the Federal Aviation Regulations (14 CFR 21.197 and 21.199) to operate the aircraft to a location where the requirements of this AD can be done.
Documents That Have Been Incorporated By Reference
(h) The inspection must be done in accordance with the following General Electric Company GE90 Service Bulletin (SB) and Alert Service Bulletin (ASB):
Document No.
Pages
Revision
Date
SB GE90 S/B 72-0352
Total pages: 33
All
4
July 31, 2000.
ASB GE90 72-A0357
Total pages: 30
All
4
July 31, 2000
These incorporations by reference were approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies may be obtained from General Electric Technical Services, Attention: Leader for distribution/microfilm, 10525 Chester Road, Cincinnati, OH 45215; telephone (513) 672-8400 Ext. 130, fax (513) 672-8422. Copies may be inspected, by appointment, at the FAA, New England Region,Office of the Regional Counsel, 12 New England Executive Park, Burlington, MA; or at the Office of the Federal Register, 800 North Capitol Street, NW., suite 700, Washington, DC.
Effective Date
(i) This amendment becomes effective on February 14, 2002.