The U.S. aircraft register, updated daily
Parts

Second Stage

No failure report names the second stage. 18 FAA approvals let 8 companies make a replacement second stage, Aviation Component Solutions holding the most (5).

Approved replacement parts 18 parts manufacturer approvals

A parts manufacturer approval (PMA) lets a company other than the aircraft's maker make a second stage and sell it as an approved part for the models named. These are the companies holding such approvals for a second stage:

For these models most: Airbus A321 (5), Airbus A320 (2), Airbus A319 (2), Embraer ERJ 190 E190 and E195 (1), Embraer ERJ 170 E170 and E175 (1), Boeing 767 (1), Airbus A300 (1).

MakerPartReplacesFitsGrantedStatus
Aviation Component SolutionsSecond Stage Housing Assy P0129767410353-1Airbus SAS A318-122, A321-252NX, A321-253NX2024-04-26current
Aviation Component SolutionsSecond Stage Housing Assy P0157467410353-1Airbus SAS A318-122, A321-252NX, A321-253NX2024-04-26current
Aviation Component SolutionsSecond Stage Gasket P012052805636-1Airbus SAS A318-122, A321-252NX, A321-253NX2024-04-26current
Aviation Component SolutionsSecond Stage Housing Assembly P0157467410353-1Embraer S.A. ERJ 170-200LR, ERJ-200SU, ERJ 190-100 IGW2020-05-08current
Aviation Component SolutionsSecond Stage Housing Assembly P0157467410353-1Airbus SAS A318-111, A318-112, A318-1212020-05-08current
Seginus INCSecond-stage Housing Assembly 67410353-1SAZodiac 67410353-1Airbus A318 Model -111, -112, -1212019-03-11current
Belac LLC (Subsidiary of Chromalloy Gas Turbine LLC)Second Stage High Pressure Turbine Blade BLC1881M52G05(-X)1881M52G05General Electric CF6-80C2A1, -80C2A2, -80C2A32018-03-26current
Belac LLCSecond Stage High Pressure Turbine Blade BLC1881M52G05(-X)PM1881M52G05General Electric... CF6-80C2A1, CF6-80C2A2, CF6-80C2A32017-05-09current
Belac LLC (Subsidiary of Chromalloy Gas Turbine LLC)Second Stage High Pressure Turbine Blade BLC1881M52G05General Electric P/N 1881M52G05General Electric CF6-80C2A1, -80C2A2, -80C2A32008-12-07current
Pas Technologies INCSecond Stage Turbine Inner Air Seal Ring Assembly PX815025-01Modification PartPratt & Whitney JT8D-217C, -2192006-11-16current
Pas Technologies INCSecond Stage Turbine Inner Air Seal Ring Assembly PX798157-002Modification PartPratt & Whitney JT8D-217C, -2192006-11-16current
Precision Components TechnologySecond Stage HPT Air Sealing Ring Segment Assembly PCT1B80581B8058Pratt & Whitney 2037, 2037(M), 20402005-12-22current
Belac LLC (Subsidiary of Chromalloy Gas Turbine LLC)Second Stage High Pressure Turbine Blade BLC1881M52G05General Electric 1881M52G05General Electric CF6-80C2A1, -80C2A2, -80C2A32005-03-09current
Belac LLC (Subsidiary of Chromalloy Gas Turbine LLC)Second Stage High Pressure Turbine Blade BLC1881M52G05General Electric 1881M52G05General Electric CF6-80C2A1, -80C2A2, -80C2A32005-03-09current
Triumph Engineering Services INCSecond Stage Stator TG3844012-33844012-3Airbus Honeywell GTCP331-250 auxiliary...2002-05-15current
Phoenix Component TechnologiesSecond Stage Shroud Assembly PCT9392M86G10-19392M86G10General Electric CF6-80C2A1,...2000-09-13current
Phoenix Component TechnologiesSecond Stage Vane PCT768552-1768352Pratt & Whitney JT8D-7, -9, -112000-09-13current
Phoenix Component TechnologiesSecond Stage Vane PCT768552-1768552Pratt & Whitney JT8D-17R2000-09-13current

Sources: the FAA's service difficulty reports since 1995 (a report is a part that failed and was fixed, as filed by an airline, repair station or owner; the count shows reporting as much as reliability) and the parts manufacturer approvals in the FAA's Dynamic Regulatory System. The part name is the reporters' and the approval holders' own words, reduced to the first plain words so that spellings meet.