The U.S. aircraft register, updated daily
Parts

Light Tube

0 failure reports named the light tube in the last ten years, 2 since 1996. 8 FAA approvals let 1 company make a replacement light tube, Jormac Aerospace INC holding the most (8).

Reports by year

000111199611997
Reports by year, as a table
reports
19961
19971

Approved replacement parts 8 parts manufacturer approvals

A parts manufacturer approval (PMA) lets a company other than the aircraft's maker make a light tube and sell it as an approved part for the models named. These are the companies holding such approvals for a light tube:

For these models most: Boeing 747 (8).

MakerPartReplacesFitsGrantedStatus
Jormac Aerospace INCLIGHT TUBE ASSY 47T8-220-255-043Modification PartBoeing 747-82016-08-16current
Jormac Aerospace INCLIGHT TUBE ASSY 47T8-220-255-053Modification PartBoeing 747-82016-08-16current
Jormac Aerospace INCLIGHT TUBE ASSY 47T8-220-255-049Modification PartBoeing 747-8) (747-82016-08-16current
Jormac Aerospace INCLIGHT TUBE ASSY 47T8-220-255-055Modification PartBoeing 747-82016-08-16current
Jormac Aerospace INCLIGHT TUBE ASSY 47T8-220-255-051Modification PartBoeing 747-82016-08-16current
Jormac Aerospace INCLIGHT TUBE ASSY 47T8-220-255-045Modification PartBoeing 747-82016-08-16current
Jormac Aerospace INCLIGHT TUBE ASSY 47T8-220-255-057Modification PartBoeing 747-82016-08-16current
Jormac Aerospace INCLIGHT TUBE ASSY 47T8-220-255-047Modification PartBoeing 747-82016-08-16current

Sources: the FAA's service difficulty reports since 1995 (a report is a part that failed and was fixed, as filed by an airline, repair station or owner; the count shows reporting as much as reliability) and the parts manufacturer approvals in the FAA's Dynamic Regulatory System. The part name is the reporters' and the approval holders' own words, reduced to the first plain words so that spellings meet.