The U.S. aircraft register, updated daily
Parts

Light System

0 failure reports named the light system in the last ten years, 1 since 1995. 6 FAA approvals let 1 company make a replacement light system, Goodrich Interiors holding the most (6).

Reports by year

0001111995
Reports by year, as a table
reports
19951

Approved replacement parts 6 parts manufacturer approvals

A parts manufacturer approval (PMA) lets a company other than the aircraft's maker make a light system and sell it as an approved part for the models named. These are the companies holding such approvals for a light system:

For these models most: Boeing 727 (4), Boeing 737 (2).

MakerPartReplacesFitsGrantedStatus
Goodrich InteriorsLight System Right Hand, Red Navigation 067000-2Modification PartBoeing 737-200, -300, -4002015-05-14current
Goodrich InteriorsLight System Left Hand, Red Navigation 067000-1Modification PartBoeing 737-200, -300, -4002015-05-14current
Goodrich InteriorsLight System Left Hand, Red Navigational 038000-3Modification PartBoeing 727-100 Series, 727-200 Series2014-04-10current
Goodrich InteriorsLight System Right Hand, Green Navigational 038000-4Modification PartBoeing 727-100 Series, 727-200 Series2014-04-10current
Goodrich InteriorsLight System Right Hand, Green Navigational 038000-2Modification PartBoeing 727-100 Series, 727-200 Series2014-04-10current
Goodrich InteriorsLight System Left Hand, Red Navigational 038000-1Modification PartBoeing 727-100 Series, 727-200 Series2014-04-10current

Sources: the FAA's service difficulty reports since 1995 (a report is a part that failed and was fixed, as filed by an airline, repair station or owner; the count shows reporting as much as reliability) and the parts manufacturer approvals in the FAA's Dynamic Regulatory System. The part name is the reporters' and the approval holders' own words, reduced to the first plain words so that spellings meet.