Lead Thru
No failure report names the lead thru. 18 FAA approvals let 1 company make a replacement lead thru, Dayton Granger INC holding the most (18).
Approved replacement parts 18 parts manufacturer approvals
A parts manufacturer approval (PMA) lets a company other than the aircraft's maker make a lead thru and sell it as an approved part for the models named. These are the companies holding such approvals for a lead thru:
For these models most: Dehavilland DHC-7 (4), Cessna 402 (3), Cessna 441 Conquest II (2), Cessna 340 (2), Boeing 737 (2), Bell 412 (2), Fairchild SA227 (1), Boeing 767 (1), Boeing 747 (1), Beechcraft 1900 Airliner (1).
| Maker | Part | Replaces | Fits | Granted | Status |
|---|---|---|---|---|---|
| Dayton Granger INC | Lead Thru Insulator Assy 14402-( ) | 14402 | Bell 412 Series | 2012-11-28 | current |
| Dayton Granger INC | Lead Thru Mast Assy 14955-3-( ) | 14955-3 | DeHavilland DHC-7 Series | 2012-11-28 | current |
| Dayton Granger INC | Lead Thru Insulator 35ARM300-80S-( ) | 35ARM300-80S | Cessna 402 Series | 2012-11-28 | current |
| Dayton Granger INC | Lead Thru Mast Assy 15186-( ) | 15186 | DeHavilland DHC-7 Series | 2012-11-28 | current |
| Dayton Granger INC | Lead Thru Insulator Assy 14217-( ) | 14217 | Donier DO228 Series | 2012-11-28 | current |
| Dayton Granger INC | Lead Thru Insulator Assy 25ARM300-20A-( ) | 25ARM300-20A-( ) | Beech 1900C Series | 2012-11-28 | current |
| Dayton Granger INC | Lead Thru Insulator Assy 25ARM300-20E-( ) | 25ARM300-20E-( ) | Cessna 441 Series | 2012-11-28 | current |
| Dayton Granger INC | Lead Thru Master Assembly 15186 | Dayton Granger 15186 | Boeing 737-200 | 1998-09-08 | current |
| Dayton Granger INC | Lead thru Mast Assembly 15186-( ) | Dayton-Granger 15186 | Boeing 747 Series, 767 Series, DHC-7 Series | 1995-06-11 | current |
| Dayton Granger INC | Lead thru Mast Assembly 14955-3 | Dayton-Granger 14955-3 | Boeing 737-200 | 1994-09-06 | current |
| Dayton Granger INC | Lead thru Mast 35ARM300-80U | Dayton Granger 35ARM300-80U | Cessna 340 | 1993-12-15 | current |
| Dayton Granger INC | Lead thru Mast Assembly 14955-3-( ) | Dayton Granger 14955-3 | deHavilland DHC-7 Series | 1993-11-28 | current |
| Dayton Granger INC | Lead thru Insulator Assembly 25ARM300-20A-( ) | Dayton Granger 25ARM300-20A-( ) | Beech Raytheon) (1900C | 1993-11-28 | current |
| Dayton Granger INC | Lead thru Insulator Assembly 25ARM300-20E-( ) | Dayton Granger 25ARM300-20E-( ) | Cessna 441 | 1993-11-28 | current |
| Dayton Granger INC | Lead thru Insulator Assembly 14402-( ) | Dayton Granger 14402 | Bell 412 | 1993-11-28 | current |
| Dayton Granger INC | Lead thru Insulator Assembly 14217-( ) | Dayton Granger 14217 | Dornier-Werke Do 228 Series | 1993-11-28 | current |
| Dayton Granger INC | Lead thru Insulator Assembly 35ARM-300-80S-( ) | Dayton-Granger 35ARM300-80S | Cessna 402 | 1993-11-28 | current |
| Dayton Granger INC | Lead thru Insulator Assembly 25ARM300-20-( ) | Dayton Granger 25ARM300-20-( ) | Cessna 340, 402C, SA227-DC | 1993-10-07 | current |
Sources: the FAA's service difficulty reports since 1995 (a report is a part that failed and was fixed, as filed by an airline, repair station or owner; the count shows reporting as much as reliability) and the parts manufacturer approvals in the FAA's Dynamic Regulatory System. The part name is the reporters' and the approval holders' own words, reduced to the first plain words so that spellings meet.
