The U.S. aircraft register, updated daily
Parts

Installation Bulkhead

No failure report names the installation bulkhead. 6 FAA approvals let 3 companies make a replacement installation bulkhead, Airworks INC holding the most (3).

Approved replacement parts 6 parts manufacturer approvals

A parts manufacturer approval (PMA) lets a company other than the aircraft's maker make a installation bulkhead and sell it as an approved part for the models named. These are the companies holding such approvals for a installation bulkhead:

For these models most: Mcdonnell Douglas DC-9 (4), Boeing 767 (1), Airbus A350 (1).

MakerPartReplacesFitsGrantedStatus
Aerocon Engineering CompanyInstallation A350 AFT Bulkhead Noise Reduction Kit AC25-NRA350-1009-101Modification PartAIRBUS SAS A350-9412025-11-17current
Airworks INCInstallation-Bulkhead Mounted Phone Unit D98-3302-00 Claircom MDL...Modification partMcDonnell Douglas DC-9-82, -832004-08-12current
Airworks INCInstallation-Bulkhead Mounted Phone Unit D98-3302-01 Claircom MDL...Modification partMcDonnell Douglas DC-9-82, -832004-08-12current
Airworks INCInstallation-Bulkhead Mounted Phone Unit D98-3302-01Claircom D98-3302-01McDonnell Douglas DC-9-82, -831999-05-18current
Airworks INCInstallation-Bulkhead Mounted Phone Unit D98-3302-00Claircom D98-3302-00McDonnell Douglas DC-9-82, -831999-05-18current
Airworks INCInstallation-Bulkhead Mounted Phone Unit 763-3301Modification PartBoeing 767-3001995-04-17current

Sources: the FAA's service difficulty reports since 1995 (a report is a part that failed and was fixed, as filed by an airline, repair station or owner; the count shows reporting as much as reliability) and the parts manufacturer approvals in the FAA's Dynamic Regulatory System. The part name is the reporters' and the approval holders' own words, reduced to the first plain words so that spellings meet.