Holder Check
No failure report names the holder check. 6 FAA approvals let 3 companies make a replacement holder check, Eagle Air Engineering INC holding the most (3).
Approved replacement parts 6 parts manufacturer approvals
A parts manufacturer approval (PMA) lets a company other than the aircraft's maker make a holder check and sell it as an approved part for the models named. These are the companies holding such approvals for a holder check:
For these models most: Boeing 737 (6), Boeing 767 (3), Boeing 757 (2), Boeing 747 (2), Boeing 727 (2).
| Maker | Part | Replaces | Fits | Granted | Status |
|---|---|---|---|---|---|
| Aviation Materials Management INC | Holder-Check List 69-3595-5 | 69-3595-5 | Boeing 737-200 Series, 737-200C Series,... | 2013-03-25 | current |
| Gemini Engineering | HOLDER-CHECK LIST 69-3595-5 | 69-3595-5 | Boeing 737-200 Series, 737-200C Series,... | 2009-06-03 | current |
| Eagle Air Engineering INC | HOLDER-CHECK LIST 69-3595-5 | 69-3595-5 | Boeing 737-200 SERIES, 737-200C SERIES,... | 2008-10-08 | current |
| Eagle Air Engineering INC | HOLDER-CHECK LIST 69-3595-2 | 65-3595-2 | Boeing 727-200 SERIES, 727-200F SERIES,... | 2008-10-08 | current |
| Eagle Air Engineering INC | HOLDER-CHECK LIST 69-3595-8 | 69-3595-8 | Boeing 737-600 SERIES, 737-700 SERIES,... | 2008-10-08 | current |
| Gemini Engineering | HOLDER-CHECK LIST 69-3595-2 | 69-3595-2 | Boeing 727-200 Series, 727-200F... | 2008-08-12 | current |
Sources: the FAA's service difficulty reports since 1995 (a report is a part that failed and was fixed, as filed by an airline, repair station or owner; the count shows reporting as much as reliability) and the parts manufacturer approvals in the FAA's Dynamic Regulatory System. The part name is the reporters' and the approval holders' own words, reduced to the first plain words so that spellings meet.
