Foot Rail
No failure report names the foot rail. 6 FAA approvals let 2 companies make a replacement foot rail, Pemco Engineers, A Precision Standard CO holding the most (3).
Approved replacement parts 6 parts manufacturer approvals
A parts manufacturer approval (PMA) lets a company other than the aircraft's maker make a foot rail and sell it as an approved part for the models named. These are the companies holding such approvals for a foot rail:
For these models most: Mcdonnell Douglas DC-10 (6).
| Maker | Part | Replaces | Fits | Granted | Status |
|---|---|---|---|---|---|
| Pemco Engineers | Foot-Rail, Aft AZZ7348-1 | McDonnell Douglas80578-11 | McDonnell Douglas DC-10-10, DC-10-10F, DC-10-30 | 2007-11-22 | current |
| Pemco Engineers | Foot-Rail, Aft AZZ7348-503 | McDonnell Douglas80578-10 | McDonnell Douglas DC-10-10F, DC-10-30, DC-10-30F | 2007-11-22 | current |
| Pemco Engineers | Foot-Rail, Aft AZZ7348-2 | McDonnell Douglas80578-12 | McDonnell Douglas DC-10-10, DC-10-10F, DC-10-30 | 2007-11-22 | current |
| Pemco Engineers, A Precision Standard CO | Foot-Rail, Aft AZZ7348-503 | McDonnell Douglas 80578-10 | McDonnell Douglas DC-10-10F, -30, -30F | 1999-06-21 | current |
| Pemco Engineers, A Precision Standard CO | Foot-Rail, Aft AZZ7348-2 | McDonnnell Douglas 80578-12 | McDonnell Douglas DC-10-10, -10F, -30 | 1999-06-21 | current |
| Pemco Engineers, A Precision Standard CO | Foot-Rail, Aft AZZ7348-1 | McDonnnell Douglas 80578-11 | McDonnell Douglas DC-10-10, -10F, -30 | 1999-06-21 | current |
Sources: the FAA's service difficulty reports since 1995 (a report is a part that failed and was fixed, as filed by an airline, repair station or owner; the count shows reporting as much as reliability) and the parts manufacturer approvals in the FAA's Dynamic Regulatory System. The part name is the reporters' and the approval holders' own words, reduced to the first plain words so that spellings meet.
