The U.S. aircraft register, updated daily
Who holds what · as the FAA records the name

Performance Engineering

Holds 7 approved modifications. FAA spelling: Performance Engineering.

Approved modifications 7 · newest first

1993-07-28SE8669SW · Installation of roller rocker arm. · C85-8F, C75-12F, C85-12F
1993-01-27SE8594SW · Installation of roller rocker arm P/N PE 92I intake and PE92E exhaust. · IO-470-U, IO-470-P, IO-470-R
1989-06-07SE7430SW · Installation of Performance Engineering roller rocker arms. · TSIO-520-U, TSIO-520-R, TSIO-520-VB
1988-05-23SE7433SW · Installation of Performance Engineering roller rocker arms. · IO-550-C, IO-550-B
1988-05-23SE7431SW · Installation of Performance Engineering roller rocker arms. · O-470-S, O-470-L, O-470-R
1988-05-23SE7432SW · Installation of Performance Engineering roller rocker arms. · IO-470-L, IO-470-U, IO-470-P
1988-05-06SE7422SW · Installation of Performance Engineering roller rocker arms. · IO-520-J, IO-520-K, IO-520-D

Source: FAA Dynamic Regulatory System (type certificate data sheets, supplemental type certificates, technical standard order authorisations). An organisation's name is as the FAA spelled it on each record; related spellings are separate pages.