eFlight
Who holds what · as the FAA records the name

Performance Engineering

Named as the FAA publishes it on its approvals.

Holds 7 approved modifications. FAA spelling: Performance Engineering.

Approved modifications 7 · newest first

1993-07-28SE8669SW · Installation of roller rocker arm. · C85-8F, C75-12F, C85-12F
1993-01-27SE8594SW · Installation of roller rocker arm P/N PE 92I intake and PE92E exhaust. · IO-470-U, IO-470-P, IO-470-R
1989-06-07SE7430SW · Installation of Performance Engineering roller rocker arms. · TSIO-520-U, TSIO-520-R, TSIO-520-VB
1988-05-23SE7432SW · Installation of Performance Engineering roller rocker arms. · IO-470-L, IO-470-U, IO-470-P
1988-05-23SE7431SW · Installation of Performance Engineering roller rocker arms. · O-470-S, O-470-L, O-470-R
1988-05-23SE7433SW · Installation of Performance Engineering roller rocker arms. · IO-550-C, IO-550-B
1988-05-06SE7422SW · Installation of Performance Engineering roller rocker arms. · IO-520-J, IO-520-K, IO-520-D

Source: FAA Dynamic Regulatory System (type certificate data sheets, supplemental type certificates, parts manufacturer approvals, technical standard order authorisations). An organisation's name is as the FAA spelled it on each record; related spellings are separate pages.

Aircraft

By kindModelsMakersEnginesFleetsWhat changed

Fly

Plan a flightAirportsLive mapRoutes and flightsFuels

Training and work

TrainingFlight schoolsGround schoolsPilot examinersMedical examinersJobs

Companies

DirectoryCharter operatorsFBOsRepair stationsClaim your listing

Safety and data

AccidentsRecords checkAnalyticsSAFxCHANGEThe graphAbout

Colours follow your device's light or dark setting.