Show the full text (24,848 characters)
99-08-10 BOEING: Amendment 39-11116. Docket 97-NM-325-AD. \n\n\tApplicability: All Model 747-100, -200, -300, -SP, and -400F series airplanes, certificated in any category. \n\n\tNOTE 1: This AD applies to each airplane identified in the preceding applicability provision, regardless of whether it has been modified, altered, or repaired in the area subject to the requirements of this AD. For airplanes that have been modified, altered, or repaired so that the performance of the requirements of this AD is affected, the owner/operator must request approval for an alternative method of compliance in accordance with paragraph (d) of this AD. The request should include an assessment of the effect of the modification, alteration, or repair on the unsafe condition addressed by this AD; and, if the unsafe condition has not been eliminated, the request should include specific proposed actions to address it. \n\n\tCompliance: Required as indicated, unless accomplished previously. \n\n\tTo prevent airframe damage, and/or hazard to persons or property on the ground as a result of "blue ice" that has formed from leakage of the lavatory drain system or flush/fill systems and dislodged from the airplane, accomplish the following: \n\n\t(a)\tAccomplish the applicable requirements of paragraphs (a)(1) through (a)(11) of this AD at the time specified in each paragraph. If the waste drain system incorporates more than one type of valve, only one of the waste drain system leak test procedures (the one that applies to the equipment with the longest leak test interval) must be conducted at each service panel location. The waste drain system valve leak tests specified in this AD shall be performed in accordance with the following requirements: The toilet tank dump valve leak test must be performed by filling the toilet tank with water/rinsing fluid to fill the toilet tank to a level that submerges the toilet tank dump valve seals with sufficient fluid to perform a valid test, and testing for leakage after a period of five minutes. For guidance, a minimum of 10 gallons is considered sufficient for a tank of 30 gallons or less capacity, and 20 gallons of fluid is considered sufficient for a tank with more than 30 gallons capacity. For tests of service panel drain valves, unless otherwise specified by this AD: Fluid shall completely cover the upstream end of the valve being tested; the direction of the 3 pounds per square inch differential pressure (PSID) shall be applied across the valve in the same direction as occurs in flight; the other waste drain system valves shall be open; and the minimum time to maintain the differential pressure shall be 5 minutes. As an alternative to the above test procedure for the service panel drain valves and in-line drain valves, a vacuum test may be done in accordance with Shaw Aero Devices Document ILS-193, Operation Instructions for the Waste Drain Valve Inner Flapper and Lavatory Rinse/Fill Valve Leak Test Tool, dated November 17, 1998, using a minimum of 3 PSID across the in-line drain valve or waste drains system service panel valve inner door for a period of 5 minutes. Any movement of the needle of the pressure gauge during the test period constitutes failure of the test. Other leak test tools may by used for this test if approved per paragraph (d) of this AD. Any revision of the seal change intervals or leak test intervals must be approved by the Manager, Seattle Aircraft Certification Office (ACO), FAA, Transport Airplane Directorate. \n\n\t\t(1)\tReplace the valve seals with new valve seals in accordance with the applicable schedule specified in paragraphs (a)(1)(i), (a)(1)(ii), and (a)(1)(iii) of this AD. For purposes of determining seal replacement times specified in this AD: If a new valve is installed or a "new airplane" is delivered, it is considered that the new valve installation or airplane delivery constitutes the "last documented seal change." A "new airplane" for the purposes of this ADis an airplane that has accumulated less than 100 total flight hours or 30 calendar days, whichever occurs later, since the issuance of the original airworthiness certificate. \n\n\t\t\t(i)\tFor each lavatory drain system that has an in-line drain valve installed, Kaiser Electroprecision part number series 2651-278 or a Kaiser Electroprecision service panel ball valve, part number series 2651-357: Replace the seals within 5,000 flight hours after the effective date of this AD, or within 48 months after the last documented seal change, whichever occurs later. Thereafter, repeat the replacement of the seals at intervals not to exceed 48 months. \n\n\t\t\t(ii)\tFor each lavatory drain system that has a PneuDraulics part number series 9527 valve: Replace the seals within 5,000 flight hours after the effective date of this AD, or within 18 months of the last documented seal change, whichever occurs later. Thereafter, repeat the replacement of the seals at intervals not to exceed 18 months or 6,000 flight hours, whichever occurs later. \n\n\t\t\t(iii)\tFor each lavatory drain system that has any other type of drain valve: Replace the seals within 5,000 flight hours after the effective date of this AD, or within 18 months after the last documented seal change, whichever occurs later. Thereafter, repeat the replacement of the seals at intervals not to exceed 18 months. \n\n\t\t(2)\tFor each lavatory drain system that has an in-line drain valve installed, Kaiser Electroprecision part number series 2651-278: Within 6,000 flight hours after the effective date of this AD, and thereafter at intervals not to exceed 6,000 flight hours, accomplish the procedures specified in paragraphs (a)(2)(i) and (a)(2)(ii) of this AD: \n\n\t\t\t(i)\tConduct a leak test of the toilet tank dump valve (in-tank valve that is spring loaded closed and operable by a T-handle at the service panel) and the in-line drain valve. Take precautions to avoid overfilling the tank and spilling fluid into the airplane. The in-line drain valve leak test must be performed with a minimum of 3 PSID applied across the valve. \n\n\t\t\t(ii)\tIf a service panel valve or cap is installed, perform a visual inspection of the service panel drain valve outer cap/door seal and the inner seal (if the valve has an inner door with a second positive seal), and the seal mating surfaces for wear or damage that may allow leakage. \n\n\t\t(3)\tFor each lavatory drain system that has a service panel drain valve installed, PneuDraulics part number series 9527: Within 4,000 flight hours after the effective date of this AD, accomplish the requirements of paragraphs (a)(3)(i) and (a)(3)(ii) of this AD. Thereafter, repeat the leak tests at intervals not to exceed 4,000 flight hours. \n\n\t\t\t(i)\tConduct leak tests of the toilet tank dump valve and service panel drain valve. Take precautions to avoid overfilling the tank and spilling fluid into the airplane. The leak test of the service panel drain valve must be performed with a minimum of 3 PSID applied across the valve inner door/closure device. \n\n\t\t\t(ii)\tPerform a visual inspection of the outer cap/door and seal mating surface for wear or damage that may cause leakage. \n\n\t\t(4)\tFor each lavatory drain system that has a service panel drain valve installed, Kaiser Electroprecision part number series 2651-357-(2) or higher -() (dash number): Within 2,000 flight hours after the effective date of this AD, and thereafter at intervals not to exceed 2,000 flight hours, conduct a leak test of the toilet tank dump valve and service panel drain valve. Take precautions to avoid overfilling the tank and spilling fluid into the airplane. The service panel drain valve leak test must be performed with a minimum of 3 PSID applied across the valve. \n\n\t\t(5)\tFor each lavatory drain system that has a service panel drain valve installed, Kaiser Electroprecision part number series 0218-0032 or Shaw Aero part number/serial number as listed in Table 1 of this AD: Within 1,500flight hours after the effective date of this AD, and thereafter at intervals not to exceed 1,500 flight hours, accomplish the requirements of paragraphs (a)(5)(i) and (a)(5)(ii) of this AD: \n\n\t\t\t\t\tTABLE 1 \n\n\nShaw Aero Valves Approved for 1,500 Flight Hour Leak Test Interval \nShaw Waste Drain Valve Part Number\n Serial Numbers of Part Number Valve Approved for 1,500 hour Leak Test Interval\n331 Series, 332 Series\n All \n10101000B-A-1\n 0201 and higher\n10101000B-A-2\n 0130 and higher \n10101000C-A-1\n 0277 and higher\n10101000CN OR C-N\n3649 and higher \nCertain 10101000B valves\n Any of these "B" series valves that incorporate the improvements of Shaw Service Bulletin 10101000B-38-1, dated October 7, 1994, and are marked "SBB38-1-58" \nCertain 10101000C valves\n Any of these "C" series valves that incorporate the improvements of Shaw Service Bulletin 10101000C-38-2 dated October 7, 1994, and are marked "SBC38-2-58" \n \n\tNOTE 2: Table 1 is a list of approved Shaw valves thatare eligible for a 1,500 hour leak test, including those valves approved by Parts Manufacturer Approval (PMA) or Supplemental Type Certificate (STC) for installation on Boeing Model 747 series airplanes that are subject to this AD. \n\n\t\t\t(i)\tConduct a leak test of the toilet tank dump valve and service panel drain valve. Take precautions to avoid overfilling the tank and spilling fluid into the airplane. The service panel drain valve leak test must be performed with a minimum of 3 PSID applied across the valve inner door/closure device.\n \n\t\t\t(ii)\tFor each valve, perform a visual inspection of the outer cap/door and seal mating surface for any wear or damage that may cause leakage. \n\n\t\t(6)\tFor each lavatory drain system that has a service panel drain valve installed, Kaiser Electroprecision part number series 0218-0026; or Shaw Aero Devices part number series 10101000B or 10101000C (except as specified in paragraph (a)(4) of this AD): Within 800 flight hours after the effectivedate of this AD, and thereafter at intervals not to exceed 800 flight hours, accomplish the requirements of paragraphs (a)(6)(i) and (a)(6)(ii) of this AD: \n\n\t\t\t(i)\tConduct a leak test of the toilet tank dump valve and the service panel drain valve. Take precautions to avoid overfilling the tank and spilling fluid on the airplane. The service panel drain valve leak test must be performed with a minimum 3 PSID applied across the valve inner door/closure device.\n \n\t\t\t(ii)\tPerform a visual inspection of the outer cap/door and seal mating surface for wear or damage that may cause leakage. \n\n\t\t(7)\tFor each lavatory drain system with a lavatory drain system valve that incorporates either "donut" plug, Kaiser Electroprecision part number 4259-20 or 4259-31; Kaiser Roylyn/Kaiser Electroprecision cap/flange part numbers 2651-194C, 2651-197C, 2651-216, 2651-219, 2651-235, 2651-256, 2651-258, 2651-259, 2651-260, 2651-275, 2651-282, 2651-286; Shaw Aero Devices assembly part number 0008-100; or other FAA-approved equivalent parts; accomplish the requirements of paragraphs (a)(7)(i), (a)(7)(ii), and (a)(7)(iii) of this AD at the times specified in those paragraphs. For the purposes of this paragraph ((a)(7)), "FAA-approved equivalent part" means either a "donut" plug which mates with the cap/flange part numbers listed above, or a cap/flange which mates with the "donut" plug part numbers listed above, such that the cap/flange and "donut" plug are used together as an assembled valve. \n\n\t\t\t(i)\tWithin 250 flight hours after the effective date of this AD, and thereafter at intervals not to exceed 250 flight hours, conduct leak tests of the toilet tank dump valve and the service panel drain valve. Take precautions to avoid overfilling the tank and spilling fluid on the airplane. The service panel drain valve leak test must be performed with a minimum 3 PSID applied across the valve. \n\n\t\t\t(ii)\tPerform a visual inspection of the outer door/cap and seal mating surface for wear or damage that may cause leakage. This inspection shall be accomplished in conjunction with the leak tests of paragraph (a)(7)(i). \n\n\t\t\t(iii)\tWithin 5,000 flight hours after the effective date of this AD, replace the donut valve (part numbers per paragraph (a)(7) of this AD) with another type of FAA-approved valve. Following installation of the replacement valve, perform the appropriate leak tests and seal replacements at the intervals specified for that replacement valve, as applicable. \n\n\t\t(8)\tFor each lavatory drain system not addressed in paragraphs (a)(2), (a)(3), (a)(4), (a)(5), (a)(6), or (a)(7) of this AD: Within 250 flight hours after the effective date of this AD, and thereafter at intervals not to exceed 250 flight hours, accomplish the requirements of paragraphs (a)(8)(i) and (a)(8)(ii) of this AD: \n\n\t\t\t(i)\tConduct a leak test of the toilet tank dump valve and the service panel drain valve. Take precautions to avoid overfilling the tank and spilling fluid on the airplane. The service panel drain valve leak test must be performed with a minimum 3 PSID applied across the valve inner door/closure device. \n\n\t\t\t(ii)\tPerform a visual inspection of the outer cap/door and seal mating surface for wear or damage that may cause leakage. \n\n\t\t(9)\tFor flush/fill lines: Within 5,000 flight hours after the effective date of this AD, perform the requirements of paragraph (a)(9)(i), (a)(9)(ii), (a)(9)(iii), or (a)(9)(iv) of this AD, as applicable. Thereafter, repeat the requirements at intervals not to exceed 5,000 flight hours, or 48 months after the last documented seal change, whichever occurs later. For the purpose of determining seal replacement times required by this AD: If a new valve has been installed or a new airplane has been delivered, the new valve installation or airplane delivery may be considered to constitute the "last documented seal change." For the purposes of this AD, a "new airplane" is defined as an airplane that has accumulated less than 100 total flight hours or 30 calendar days, whichever occurs later, since the issuance of the original airworthiness certificate. \n\n\t\t\t(i)\tIf a lever lock cap is installed on the flush/fill line of the subject lavatory, replace the seals on the toilet tank anti-siphon (check) valve and the flush/fill line cap. Perform a leak test of the toilet tank anti-siphon (check) valve with a minimum of 3 PSID across the valve, in accordance with paragraph (a)(10)(i) or (a)(10(ii), or (a)(10)(iii) of this AD, as applicable. \n\n\t\t\t(ii)\tIf a vacuum breaker check valve having Monogram part number series 4803-76 or 4803-96 is installed on the subject lavatory, prior to further flight, replace the seals/o-rings in the vacuum breaker check valve. Perform a leak test of the vacuum breaker check valve in accordance with paragraph (a)(10)(i) or (a)(10)(ii) of this AD, as applicable. Verify proper operation of the vent line vacuum breaker in accordance with paragraph (a)(10)(iii) of this AD. \n\n\t\t\t(iii)\tIf a flush/fill ball valve having Kaiser Electroprecision part number series 0062-0010 is installed on the flush/fill line of the subject lavatory, replace the seals in the flush/fill ball valve and the toilet tank anti-siphon valve. Perform a leak test of the toilet tank anti-siphon valve with a minimum of 3 PSID across the valve, in accordance with paragraph (a)(10)(i) or (a)(10)(ii) of this AD, as applicable.\n \n\t\t\t(iv)\tIf a shut-off valve having Boeing Specification #SCD 60B50341 is installed on the flush/fill line of the subject lavatory, replace the seals in the shut-off valve. Perform a leak test of the shut-off valve with a minimum of 3 PSID across the valve, in accordance with paragraph (a)(10)(ii) of this AD. At the time the test is performed, ground handling bus power must be removed from the shutoff valve and level sensor. This can be accomplished by de-energizing the ground handling bus completely (refer to Boeing Maintenance Manual 38-32-00/1 and 24-22-00/201 as an additional source of service information) or by removing ground handling bus supplied power to only the shutoff valve and waste level sensor. To remove ground handling bus supplied power to the shutoff valve and waste level sensor, open the ground service lavatory lights circuit breaker supplying 115V AC to the shutoff valve and the lavatory tank fill control circuit breaker supplying 28 V DC to the level sensor. These circuit breakers are located on panel P14 of Model 747-100, -200, -300 and SP airplanes, and on panel P414 of Model 747-400F series airplanes. \n\n\t\t(10)\tPerform the tests specified in paragraph (a)(9) of this AD in accordance with the instructions of paragraph (a)(10)(i), (a)(10)(ii), or (a)(10)(iii) of this AD, as applicable. \n\n\t\t\t(i)\tLeak test the toilet tank anti-siphon valve or the vacuum breaker check valve by filling the bowl above the toilet tank approximately half-full with water/rinsing fluid (at least 2 inches above the flapper in the bowl).Apply 3 PSID across the valve in the same direction as occurs in flight. The vent line vacuum breaker on vacuum breaker check valves must be pinched closed or plugged for this leak test. If there is a cap/valve at the flush/fill line port, the cap/valve must be removed or opened during the test. Test for leakage at the flush/fill line port for a period of 5 minutes. \n\n\tNOTE 3: The leak test may be accomplished by pressurizing the airplane or by performing the leak test using Boeing vacuum test rig described in Boeing Maintenance Manual, 38-32-00/501, which is considered to be an additional source of service information for this test, if the toilet tank is filled to the level specified in paragraph (a)(10)(i) of this AD. \n\n\t\t\t(ii)\tAs an alternative to the leak tests of the flush/fill line valve specified in paragraph (a)(10)(i) of this AD, a vacuum test may be done using a minimum of 3 PSID across the anti-siphon valve, vacuum breaker valve, or shut-off valve in the flush/fill line for a period of 5 minutes, in accordance with Shaw Aero Devices Document ILS-193 (Operation Instructions for the waste Drain Valve Inner Flapper and Lavatory Rinse/Fill Valve Leak Test Tool) dated November 17, 1998. The vent line vacuum breaker on vacuum breaker check valves must be pinched closed or plugged for this leak test. If there is a cap/valve at the flush/fill line port, the cap/valve must be removed/open during the test. Any movement of the needle of the pressure gauge during the test period constitutes failure of the test and shall be considered evidence of leakage. Other leak test tools may by used for this test if approved in accordance with paragraph (d) of this AD. \n\n\t\t\t(iii)\tVerify proper operation of the vent line vacuum breaker by filling the tank and testing at the fill line port for back drainage after disconnecting the fluid source from the flush/fill line port. As an alternative to the above test technique, verify proper operation of the vent line vacuumbreaker in accordance with the procedures of the applicable component maintenance manual. If back drainage does not occur, prior to further flight, replace the vent line vacuum breaker or repair the vacuum breaker check valve in accordance with the appropriate component maintenance manual to obtain proper back drainage. \n\n\t\t(11)\tIf evidence of leakage or valve damage that may cause leakage is found during the leak tests and inspections required by paragraph (a) of this AD or at any other time: Accomplish the requirements of paragraph (a)(11)(i), (a)(11)(ii), or (a)(11)(iii) of this AD, as applicable. \n\n\t\t\t(i)\tIf any leakage is discovered, prior to further flight, perform the requirements of paragraphs (a)(11)(i)(A) and (a)(11)(i)(B) of this AD. \n\n\t\t\t\t(A)\tRepair the leakage in accordance with the applicable component repair or maintenance manual. \n\n\t\t\t\t(B)\tPerform the appropriate leak test, as specified in paragraph (a) of this AD; thoroughly clean the surfaces adjacent to any leakage to remove any horizontal fluid residue streaking. Cleaning must be to the extent that any future appearance of a horizontal fluid residue streak would indicate that the system is leaking. \n\n\tNOTE 4: For purposes of this AD, "leakage" is defined as any visible leakage, if observed during a leak test. At any time other than during a leak test, "leakage" is defined as the presence of ice in the service panel, horizontal fluid residue streaks, or ice trails originating at the service panel. The fluid residue is usually, but not necessarily, blue in color. \n\n\t\t\t(ii)\tIf any worn or damaged seal is found, or if any damaged seal mating surface is found and that wear or damage could result in a leak, prior to further flight, repair or replace it in accordance with the valve manufacturer's maintenance manual. \n\n\t\t\t(iii)\tIn lieu of performing the requirements of paragraph (a)(11)(i) or (a)(11)(ii) of this AD: Prior to further flight, drain the affected lavatory system and placard the lavatory inoperative until repairs are accomplished. \n\n\t(b)\tFor all airplanes: Unless accomplished previously, within 5,000 flight hours after the effective date of this AD, install one of the caps/valves specified in paragraph (b)(1), (b)(2), (b)(3), or (b)(4) of this AD on each flush/fill line of all lavatories. \n\n\t\t(1)\tInstall an FAA-approved lever/lock cap on the flush/fill line. Or \n\n\t\t(2)\tInstall a flush/fill ball valve Kaiser Electroprecision part number series 0062-0010 on the flush/fill line. Or \n\n\t\t(3)\tInstall a vacuum breaker valve, Monogram part number series 4803-76 or 4803-96 on the flush/fill line. Or \n\n\t\t(4)\tInstall a shut-off valve, Boeing specification number 60B50341, on the flush/fill line. \n\n\t(c)\tFor any affected airplane acquired after the effective date of this AD: Before any operator places into service any airplane subject to the requirements of this AD, a schedule for the accomplishment of the leak tests required by this AD shall be established in accordance with either paragraph (c)(1) or (c)(2) of this AD, as applicable. After each leak test has been performed once, each subsequent leak test must be performed according to the new operator's schedule, in accordance with paragraph (a) of this AD. \n\n\t\t(1)\tFor airplanes that have been maintained previously in accordance with this AD, the first leak test to be performed by the new operator must be accomplished in accordance with the previous operator's schedule or with the new operator's schedule, whichever results in the earlier accomplishment date for that leak test. \n\n\t\t(2)\tFor airplanes that have not been maintained previously in accordance with this AD, the first leak test to be performed by the new operator must be accomplished prior to further flight, or in accordance with a schedule approved by the FAA Principal Maintenance Inspector (PMI), but within a period not to exceed 250 flight hours. \n\n\t(d)\tAn alternative method of compliance or adjustment of thecompliance time that provides an acceptable level of safety may be used if approved by the Manager, Seattle Aircraft Certification Office, Transport Airplane Directorate, Operators shall submit their requests through an appropriate FAA PMI, who may add comments and then send it to the Manager, Seattle ACO.. \n\n\tNOTE 5: Information concerning the existence of approved alternative methods of compliance with this AD, if any, may be obtained from the Seattle ACO. \n\n\t(e)\tSpecial flight permits may be issued in accordance with sections 21.197 and 21.199 of the Federal Aviation Regulations (14 CFR 21.197 and 21.199) to operate the airplane to a location where the requirements of this AD can be accomplished. \n\n\t(f)\tExcept as provided in paragraph (a) of this AD, the vacuum leak tests of the service panel drain valves and in- line drain valves, and vacuum leak tests of the service panel drain valves and flush/fill line valves, if accomplished, shall be done in accordance with Shaw Aero Devices, Doc. ILS-193, Operation Instructions for the Waste Drain Valve Inner Flapper and Lavatory Rinse/Fill Valve Leak Test Tool, dated November 1998. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies may be obtained from Shaw Aero Devices, Inc., 12291 Towne Lake Drive, Ft. Myers, Florida 33913. Copies may be inspected at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the Office of the Federal Register, 800 North Capitol Street, NW., suite 700, Washington, DC. \n\n\t(g)\tThis amendment becomes effective on May 17, 1999.