99-08-03: Power Feeder Terminals

FAA order 99-08-03 is an airworthiness directive in force since April 19, 1999. The FAA's subject line: Power Feeder Terminals. It names Boeing 737: about 2,908 aircraft on the U.S. register today, though an order usually covers particular versions or serial numbers rather than every one. System: engine.

What it applies to as the FAA lists it

Kind of product
Aircraft
Makes
The Boeing Company; The Boeing Company; The Boeing Company; The Boeing Company; The Boeing Company; The Boeing Company; The Boeing Company; The Boeing Company; The Boeing Company; The Boeing Company
Models
737-600 Series, 737-700 Series, 737-800 Series
On this site
Boeing 737 2,908 registered

Dates and paperwork

In force since
April 19, 1999
Published
April 2, 1999
Docket
99-NM-38-AD
Replaced by
2001-22-11
Status
Historical
The FAA's document
Read the order on the FAA's site

The FAA's summary their words, unchanged

This amendment adopts a new airworthiness directive (AD) that is applicable to all Boeing Model 737-600, -700, and -800 series airplanes. This action requires an inspection of the power distribution panels (PDP) to verify proper installation of the power feeder terminals and associated hardware, and corrective actions, if necessary. This action also requires repetitive torque checks of the terminal attachment screws. This amendment is prompted by reports indicating the loss of electrical power from the engine-driven generators or the auxiliary power unit due to overheating, melting, and subsequent failure of the power feeder terminals. The actions specified in this AD are intended to prevent such conditions, which could result in increased risk of fire and the loss of electrical power from the associated alternating current power source.

The order itself the regulatory text, as published

Show the full text (4,938 characters)
99-08-03 BOEING: Amendment 39-11107. Docket 99-NM-38-AD. \n\n\tApplicability: All Boeing Model 737-600, -700, and -800 series airplanes; certificated in any category.\n \n\tNOTE 1: This AD applies to each airplane identified in the preceding applicability provision, regardless of whether it has been modified, altered, or repaired in the area subject to the requirements of this AD. For airplanes that have been modified, altered, or repaired so that the performance of the requirements of this AD is affected, the owner/operator must request approval for an alternative method of compliance in accordance with paragraph (c) of this AD. The request should include an assessment of the effect of the modification, alteration, or repair on the unsafe condition addressed by this AD; and, if the unsafe condition has not been eliminated, the request should include specific proposed actions to address it. \n\n\tCompliance: Required as indicated, unless accomplished previously. \n\n\tTo preventoverheating, melting, and subsequent failure of the power feeder terminals, which could result in increased risk of fire and the loss of electrical power from the associated alternating current (AC) power source, accomplish the following: \n\nInitial Inspection \n\n\t(a)\tWithin 90 days after the effective date of this AD: Perform a one-time general visual inspection to verify proper installation of the power feeder terminals and associated hardware located in power distribution panels (PDP) P91 and P92, in accordance with the following procedures. \n\n\tUsing a flashlight, inspect each of the six power feeder terminals by looking into the access holes located in the plastic cover of the rigid bus assembly. The holes are located on the aft face of PDP's P91 and P92. (Refer to the Boeing 737-600, -700, -800, -900 Airplane Maintenance Manual (AMM), Section 24-21-71/401, Figure 401 (Sheet 1), for the location of PDP P91 and P92.) On PDP P91, the holes are adjacent to terminal blocks TB5001 and TB5002. On PDP P92, the holes are adjacent to terminal blocks TB5005 and TB5006. There are a total of six holes per PDP. (Refer to the Boeing 737-600, -700, -800, -900 AMM, Section 24-21-71/401, Figure 401 (Sheet 2), for the location of the access holes on the PDP's.) Note that although each PDP has nine power feeder terminals, only the six terminals adjacent to the access holes require inspection. Verify that the power feeder terminal is properly installed and held in place on the busbar by the No. 8 socket head cap screw, and verify that the cap screw is inserted into the hole in the terminal. For the proper power feeder terminal and screw buildup, refer to the Boeing 737-600, -700, -800, -900 AMM, Chapter 24-21-71/401, Figure 401 (Sheet 4). The subject power feeder terminal is identified as item (7) and the cap screw as item (12). This visual inspection does not require loosening or removing any fasteners. The inspection may require looking through the access hole ata slight angle to see the terminal clearly. The terminal can be identified by its shiny metal finish; the current transformer behind the terminal block is made of plastic with a flat black finish. If the power feeder terminal and No. 8 socket head cap screw are not assembled as shown in Boeing 737-600, -700, -800, -900 AMM, Section 24-21-71/401, Figure 401 (Sheet 4): Prior to further flight, replace the rigid bus assembly with a new assembly, in accordance with the procedures specified in Boeing 737-600, -700, -800, -900 AMM, Section 24-21-22. \n\nRepetitive Torque Check\n \n\t(b)\tConcurrent with the accomplishment of the requirements of paragraph (a) of this AD: Perform a torque check of the attachment screws of the power feeder terminals in accordance with the procedures specified in Boeing Maintenance Tip 737 MT 24-003, dated May 14, 1998. Repeat the torque check thereafter at intervals not to exceed 1,000 flight hours, in accordance with the maintenance tip. \n\nAlternative Methods of Compliance \n\n\t(c)\tAn alternative method of compliance or adjustment of the compliance time that provides an acceptable level of safety may be used if approved by the Manager, Seattle Aircraft Certification Office (ACO), FAA, Transport Airplane Directorate. Operators shall submit their requests through an appropriate FAA Principal Maintenance Inspector, who may add comments and then send it to the Manager, Seattle ACO.\n \n\tNOTE 2: Information concerning the existence of approved alternative methods of compliance with this AD, if any, may be obtained from the Seattle ACO. \n\nSpecial Flight Permits\n \n\t(d)\tSpecial flight permits may be issued in accordance with sections 21.197 and 21.199 of the Federal Aviation Regulations (14 CFR 21.197 and 21.199) to operate the airplane to a location where the requirements of this AD can be accomplished. \n\n\t(e)\tThis amendment becomes effective on April 19, 1999.

Related safety bulletins advice on the same designs, not orders

2026-10-232026-18 · NOSE/TAIL LANDING GEAR, Installation of AeroControlex STC ST01255CH may allow water to leak and freeze on...
2026-10-032026-17 · VNAV Approach Disconnect Following Missed Approach, Anomaly on Airplanes with FMC U14.0/14.1
2026-01-082026-01 · PITOT/STATIC ANTI-ICE SYSTEM
2025-09-082025-08 · INDICATING/RECORDING SYSTEM, Erroneous Illumination of Cabin Altitude Warning Lights in High Altitude Landing Mode
2021-08-03AIR-21-12 · Thrust Reversers

Source: FAA Dynamic Regulatory System, airworthiness directives. The FAA's document is the authority; the register counts are this site's, from the FAA register of November 24, 2026. Connections as data: /graph/directive/99-08-03.json · aircraft systems.

Aircraft

By kindModelsMakersEnginesFleetsWhat changed

Fly

Plan a flightAirportsLive mapRoutes and flightsFuels

Training and work

TrainingFlight schoolsGround schoolsPilot examinersMedical examinersJobs

Companies

DirectoryCharter operatorsFBOsRepair stationsClaim your listing

Safety and data

AccidentsRecords checkAnalyticsSAFxCHANGEThe graphAbout

Colours follow your device's light or dark setting.