eFlight
FAA orders · airworthiness directive · current

98-11-19: Aft Mount Beam Assembly

FAA order 98-11-19 is an airworthiness directive in force since July 2, 1998. The FAA's subject line: Aft Mount Beam Assembly. It names Airbus A300: about 120 aircraft on the U.S. register today, though an order usually covers particular versions or serial numbers rather than every one. System: engine.

What it applies to as the FAA lists it

Kind of product
Aircraft
Makes
Airbus
Models
A300 B4-601, A300 B4-603, A300 B4-605R, A300 B4-620, A300 B4-622R, A300 F4-605R, A300 F4-622R, A310-203, A310-221, A310-222, A310-304, A310-322, A310-324, A310-325
On this site
Airbus A300 120 registered

Dates and paperwork

In force since
July 2, 1998
Docket
96-NM-172-AD
Status
Current
The FAA's document
Read the order on the FAA's site

The FAA's summary their words, unchanged

This document corrects a typographical error that appeared in airworthiness directive (AD) 98-11-19 that was published in the Federal Register on May 28, 1998 (63 FR 29096). The typographical error in the applicability statement of the AD resulted in a reference to an engine model that does not exist. This AD is applicable to certain Airbus Model A310 and A300-600 series airplanes. This AD requires a visual inspection to detect cracks in the aft mount beam assembly of the engine; and replacement of any cracked beam with a new beam or beam assembly; and a fluorescent penetrant inspection to detect cracks in the aft mount beam assembly of the engine, and various follow-on actions.

The order itself the regulatory text, as published

Show the full text (5,308 characters)
98-11-19 AIRBUS INDUSTRIE: Amendment 39-10544. Docket 96-NM-172-AD. "Applicability: Model A310 and A300-600 series airplanes, equipped with Pratt & Whitney Model JT9D-7R4D1, JT9D-7R4E1, JT9D-7R4H1, PW4152, PW4156A, or PW4158 engines; certificated in any category." NOTE 1: This AD applies to each airplane identified in the preceding applicability provision, regardless of whether it has been modified, altered, or repaired in the area subject to the requirements of this AD. For airplanes that have been modified, altered, or repaired so that the performance of the requirements of this AD is affected, the owner/operator must request approval for an alternative method of compliance in accordance with paragraph (c) of this AD. The request should include an assessment of the effect of the modification, alteration, or repair on the unsafe condition addressed by this AD; and, if the unsafe condition has not been eliminated, the request should include specific proposed actions toaddress it. Compliance: Required as indicated, unless accomplished previously. To detect and correct cracking in the aft mount beam assembly of the engine, which could result in reduced structural integrity of the aft mount beam assembly, accomplish the following: (a) Within 500 flight hours after the effective date of this AD, perform a visual inspection to detect cracks in the aft mount beam assembly of the engine, in accordance with Part 1 of the Accomplishment Instructions of Pratt & Whitney Alert Service Bulletin PW7R4 A71- 129, Revision 1, dated August 30, 1995, or Pratt & Whitney Alert Service Bulletin PW4NAC A71-149, Revision 1, dated August 30, 1995; as applicable. (1) If no crack is detected, no further action is required by this paragraph. (2) If any crack is detected, prior to further flight, replace the cracked beam with a new beam or beam assembly, in accordance with the applicable service bulletin. (b) Within 4,000 flight cycles after the effective date of this AD, perform a fluorescent penetrant inspection to detect cracks in the aft mount beam assembly of the engine, in accordance with Part 2 of the Accomplishment Instructions of Pratt & Whitney Alert Service Bulletin PW7R4 A71-129, Revision 1, dated August 30, 1995, or Pratt & Whitney Alert Service Bulletin PW4NAC A71-149, Revision 1, dated August 30, 1995; as applicable. (1) If no crack is detected, prior to further flight, perform an eddy current inspection to detect cracks in the aft mount beam assembly of the engine, in accordance with the applicable service bulletin. (i) If no crack is detected, prior to further flight, reidentify the beam in accordance with the applicable service bulletin. (ii) If any crack is detected, prior to further flight, replace the cracked beam with a new beam or beam assembly, in accordance with the applicable service bulletin. (2) If any crack is detected, prior to further flight, replace the cracked beam with a new beam or beam assembly, in accordance with the applicable service bulletin. NOTE 2: Accomplishment of the actions required by paragraphs (a) and (b) of this AD in accordance with Pratt & Whitney Service Bulletin PW4MD11 A71-102, Revision 3, dated August 30, 1995, is considered to be acceptable for compliance with those paragraphs. (c) An alternative method of compliance or adjustment of the compliance time that provides an acceptable level of safety may be used if approved by the Manager, International Branch, ANM-116, FAA, Transport Airplane Directorate. Operators shall submit their requests through an appropriate FAA Principal Maintenance Inspector, who may add comments and then send it to the Manager, International Branch, ANM-116. NOTE 3: Information concerning the existence of approved alternative methods of compliance with this AD, if any, may be obtained from the International Branch, ANM-116. (d) Special flight permits may be issued in accordance with sections 21.197 and 21.199 of the Federal Aviation Regulations (14 CFR 21.197 and 21.199) to operate the airplane to a location where the requirements of this AD can be accomplished. (e) The actions shall be done in accordance with the following Pratt & Whitney Alert Service Bulletins, which contain the following list of effective pages: Service Bulletin Referenced and Date Page Number Shown on Page Revision Level Shown on Page Date Shown on Page PW7R4 A71-129, Revision 1, August 30, 1995 1, 4, 12, 17-21, 23, 25-32 2, 3, 5-11, 13-16, 22, 24 1 Original August 30, 1995 May 30, 1995 PW4NAC A71-149, Revision 1, August 30, 1995 1, 2, 4, 12, 17-21 25-32 3, 5-11, 13-16 22-24 1 Original August 30, 1995 May 30, 1995 This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies may be obtained from Pratt & Whitney, 400 Main Street, East Hartford, Connecticut 06108.Copies may be inspected at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the Office of the Federal Register, 800 North Capitol Street, NW., suite 700, Washington, DC. NOTE 4: The subject of this AD is addressed in French airworthiness directive 96-020- 195(B), dated January 31, 1996. (f) This amendment becomes effective on July 2, 1998.

Related safety bulletins advice on the same designs, not orders

2019-02-19NE-19-03 · Escape Slide Maintenance Tasks and Intervals - JASC 2565
2008-12-11NM-09-03 · Engine Fuel and Control - Implementing Fuel Tank System Airworthiness Limitations
2008-07-02NM-08-31 · Equipment/Furnishings: Non-Textile Floors
2006-12-11SW-07-13 · Oxygen Reserve Cylinder
2006-07-27NM-06-57 · Reports of damage to airplanes and to property on the ground caused by blue or clear ice falling from airplanes.

Source: FAA Dynamic Regulatory System, airworthiness directives. The FAA's document is the authority; the register counts are this site's, from the FAA register of November 24, 2026. Connections as data: /graph/directive/98-11-19.json · aircraft systems.

Aircraft

By kindModelsMakersEnginesFleetsWhat changed

Fly

Plan a flightAirportsLive mapRoutes and flightsFuels

Training and work

TrainingFlight schoolsGround schoolsPilot examinersMedical examinersJobs

Companies

DirectoryCharter operatorsFBOsRepair stationsClaim your listing

Safety and data

AccidentsRecords checkAnalyticsSAFxCHANGEThe graphAbout

Colours follow your device's light or dark setting.