eFlight
FAA orders · airworthiness directive · current

91-24-01: Compressor Rear Frame Casing

FAA order 91-24-01 is an airworthiness directive in force since May 26, 1992. The FAA's subject line: Compressor Rear Frame Casing. It names the General Electric CF6-6D, General Electric CF6-80 series engines: about 240 aircraft on the U.S. register today across them, though an order usually covers particular versions or serial numbers rather than every one. System: engine.

What it applies to as the FAA lists it

Kind of product
Engine
Makes
General Electric Company
Models
CF6-6D, CF6-6D1, CF6-6D1A, CF6-6K, CF6-6K2
Engine series
General Electric CF6-6D 2 aircraft
General Electric CF6-80 series 238 aircraft

Dates and paperwork

In force since
May 26, 1992
Docket
91-ANE-43
Status
Current
The FAA's document
Read the order on the FAA's site

The order itself the regulatory text, as published

Show the full text (4,569 characters)
91-24-01 GENERAL ELECTRIC COMPANY: Amendment 39-8086. Docket No. 91-ANE-43. Supersedes AD 90-24-12, Amendment 39-6808. Applicability: General Electric Company (GE) CF6-6 series turbofan engines installed on but not limited to McDonnell-Douglas DC-10 aircraft. Compliance: Required as indicated, unless accomplished previously. To prevent rupture of the compressor rear frame (CRF) casing that could result in an engine shutdown, aircraft damage, and aborted takeoff, accomplish the following: (a) At the next scheduled open cowl check, but not later than 100 cycles in service (CIS) after the effective date of this AD, inspect the CRF outer case compressor discharge pressure (CDP) manifold port plug weld area for cracks in accordance with GE CF6-6 Service Bulletin (SB) 72-971, Revision 2, dated August 27, 1991. (b) Remove from service, prior to further flight, CRF casings which exceed the serviceable limits specified in Table 1 or Table 2, as applicable, of GE CF6-6 SB 72-971, Revision 2, dated August 27, 1991. (c) For engines with CRF casings inspected after December 11, 1990 (the effective date of AD 90-24-12), reinspect and remove from service CRF casings in accordance with the inspection intervals and crack limits specified in Table 1 of GE CF6-6 SB 72-971, dated October 2, 1990, until the first scheduled inspection after the effective date of this AD. (d) Thereafter, reinspect and remove from service CRF casings in accordance with the inspection intervals and crack limits specified in Table 1 or Table 2, as applicable, of GE CF6-6 SB 72-971, Revision 2, dated August 27, 1991. (e) At the next shop visit, but not later than 4,500 CIS after the effective date of this AD, perform a visual, fluorescent-penetrant, and radiographic inspection of the CRF, and rework the CRF in accordance with GE CF6-6 SB 72-977, dated March 15, 1991. (f) For the purpose of this AD, a shop visit is defined as the CRF exposed at the piece-part level. (g) Compliance with paragraph (e) of this AD eliminates the inspection requirements of paragraphs (a), (b), (c), and (d) of this AD and constitutes a terminating action to this AD. (h) An alternative method of compliance or adjustment of the compliance time, which provides an acceptable level of safety, may be used when approved by the Manager, Engine Certification Office, ANE-140, Engine and Propeller Directorate, Aircraft Certification Service, FAA, New England Region, 12 New England Executive Park, Burlington, Massachusetts. The request shall be forwarded through an FAA Principal Maintenance Inspector, who may concur or comment and then send it to the Manager, Engine Certification Office. (i) Special flight permits may be issued in accordance with FAR 21.197 and 21.199 to operate the airplane to a location where the requirements of this AD can be accomplished. (j) The reinspections and removal of CRF casings shall be done in accordance with General Electric CF6-6 Service Bulletin 72-971, dated October 2, 1990. This incorporation by reference was previously approved by the Director of the Federal Register at 55 FR 48591, (December 11, 1990) in accordance with 5 U.S.C. 552(a) and 1 CFR Part 51. Copies of General Electric service bulletins may be obtained from General Electric Aircraft Engines, Technical Publications Department, 1 Neumann Way, Cincinnati, Ohio 45215. Copies may be inspected at the FAA, New England Region, Office of the Assistant Chief Counsel, 12 New England Executive Park, Room 311, Burlington, Massachusetts, or at the Office of the Federal Register, 1100 L Street NW., Room 8401, Washington, D.C. (k) The inspections and rework shall be done in accordance with the following General Electric Company documents: Document Number Page Number Issue/Rev Date GE CF6-6 SB 72-971 1-11 Revision 2 8/27/91 12 Original 10/2/90 Total: 12 pages GE CF6-6 SB 72-977 1-34 Original 3/15/91 Total: 34 pages This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR Part 51. Copies of General Electric service bulletins may be obtained from General Electric Aircraft Engines, Technical Publications Department, 1 Neumann Way, Cincinnati, Ohio 45215. Copies may be inspected at the FAA, New England Region, Office of the Assistant Chief Counsel, 12 New England Executive Park, Room 311, Burlington, Massachusetts, or at the Office of the Federal Register, 1100 L Street NW., Room 8401, Washington, D.C. (l) This amendment becomes effective on May 26, 1992.

Source: FAA Dynamic Regulatory System, airworthiness directives. The FAA's document is the authority; the register counts are this site's, from the FAA register of November 24, 2026. Connections as data: /graph/directive/91-24-01.json · aircraft systems.

Aircraft

By kindModelsMakersEnginesFleetsWhat changed

Fly

Plan a flightAirportsLive mapRoutes and flightsFuels

Training and work

TrainingFlight schoolsGround schoolsPilot examinersMedical examinersJobs

Companies

DirectoryCharter operatorsFBOsRepair stationsClaim your listing

Safety and data

AccidentsRecords checkAnalyticsSAFxCHANGEThe graphAbout

Colours follow your device's light or dark setting.