1. The authority citation for part 39 continues to read as follows: Authority: 49 U.S.C. 106(g), 40113, 44701. 2. The FAA amends § 39.13 by adding the following new airworthiness directive: 2022-06-10 The Boeing Company: Amendment 39-21976; Docket No. FAA-2021-0962; Project Identifier AD-2021-00997-T. (a) Effective Date This airworthiness directive (AD) is effective April 15, 2022. (b) Affected ADs None. (c) Applicability This AD applies to The Boeing Company airplanes, certificated in any category, as specified in paragraphs (c)(1) and (2) of this AD. (1) Model 777-200 series airplanes equipped with Pratt & Whitney PW4074, PW4074D, PW4077, PW4077D, PW4084D, PW4090, and PW4090-3 model turbofan engines. (2) Model 777-300 series airplanes equipped with Pratt & Whitney PW4090 and PW4098 model turbofan engines. (d) Subject Air Transport Association (ATA) of America Code 71, Powerplant. (e) Unsafe Condition This AD was prompted by reports of three incidents involving in-flight fan blade failures on certain Pratt & Whitney engines. The FAA is issuing this AD to address engine fan blade failure, which could result in engine in-flight shutdown, and could result in separation of the inlet, the fan cowl doors, or the thrust reverser (T/R) cowl, or result in uncontrolled engine fire. Separation of the inlet, the fan cowl doors, or the T/R cowl could result in impact damage to the empennage and loss of control of the airplane, or to the fuselage or windows with potential injury to passengers; or it could result in significantly increased aerodynamic drag causing fuel exhaustion or the inability to maintain altitude above terrain during extended operations (ETOPS) flights, either of which could result in a forced off-airport landing and injury to passengers. Uncontrolled engine fire could result in loss of control of the airplane. (f) Compliance Comply with this AD within the compliance times specified, unless already done. (g) Installation and Inspections Before further flight after the effective date of this AD, do the actions specified in paragraphs (g)(1) through (3) of this AD. Repeat the functional check specified in paragraph (g)(3) of this AD within 10 days prior to each flight. (1) Install debris shields on the T/R inner wall at the left and right sides of the lower bifurcation, in accordance with a method approved by the Manager, Seattle ACO Branch, FAA. (2) Inspect the fan cowl doors for moisture ingression in accordance with paragraphs (g)(2)(i) or (ii) of this AD, as applicable. (i) Do the inspection in accordance with a method approved by the Manager, Seattle ACO Branch, FAA. If any moisture ingression is found, repair before further flight, in accordance with a method approved by the Manager, Seattle ACO Branch, FAA. (ii) Do all applicable actions identified in, and in accordance with, the Accomplishment Instructions of Boeing Alert Requirements Bulletin 777-71A0092 RB, dated January 13, 2022, except where Boeing Alert Requirements Bulletin 777-71A0092 RB, dated January 13, 2022, specifies to report inspection findings, this AD does not require any report, and where Boeing Alert Requirements Bulletin 777-71A0092 RB, dated January 13, 2022, specifies to contact Boeing for a repair, this AD requires the repair to be accomplished in accordance with a method approved by the Manager, Seattle ACO Branch, FAA. (3) Do a functional check of the left and right hydraulic pump shutoff valves to ensure they close in response to the corresponding engine fire handle input. If any hydraulic pump shutoff valve does not close, before further flight perform corrective actions until it closes in response to the corresponding engine fire handle input. Note (1) to paragraph (g)(3): Guidance for accomplishing the actions required by paragraphs (g)(3) and (h)(2) of this AD can be found in the "Engine-Driven Pump (EDP) Shutoff Valve Check" (Subtasks 26-21-00-200-018, 26-21-00-200-019, and 26-21-00-840-022; or Task 29-11-00-710-806) of Boeing 777-200/300 Aircraft Maintenance Manual. (h) Special Flight Permit Special flight permits, as described in 14 CFR 21.197 and 21.199, are permitted provided that the actions in paragraphs (h)(1) and (2) of this AD have first been accomplished. (1) A flow path ultrasonic testing (UT) inspection of the 1st-stage low-pressure compressor (LPC) blades for cracking has been done within the last 275 cycles, as specified in the Accomplishment Instructions, Part A-Initial Inspection of All LPC Fan Blades Prior to their Return to Service, paragraph 1.A., of Pratt & Whitney Alert Service Bulletin PW4G-112-A72-361, dated October 15, 2021, and the 1st-stage LPC blades have been found serviceable. This inspection is not required for 1st-stage LPC blades with 275 cycles since new or fewer. (2) A functional check of the left and right hydraulic pump shutoff valves to ensure they close in response to the corresponding engine fire handle input and all applicable corrective actions ( i.e., repair) within 10 days prior to flight. (i) Credit for Previous Actions This paragraph provides credit for the actions specified in paragraph (h)(1) of this AD, if those actions were performed before the effective date of this AD using the service information specified in paragraph (i)(1), (2), or (3) of this AD. (1) Paragraph 2. of the Accomplishment Instructions of Pratt & Whitney Special Instruction No. 85F-21, dated May 12, 2021, for a flow path UT inspection. (2) Paragraph 1.a) of the Accomplishment Instructions of Pratt & Whitney Special Instruction No. 130F-21, dated July 1, 2021, for a flow path UT inspection. (3) Paragraph 2.a) of the Accomplishment Instructions of Pratt & Whitney Special Instruction No. 130F-21, Revision A, dated July 28, 2021, for a flow path UT inspection. (j) Alternative Methods of Compliance (AMOCs) (1) The Manager, Seattle ACO Branch, FAA, has the authority to approve AMOCs for this AD, if requested using the procedures found in 14 CFR 39.19. In accordance with 14 CFR 39.19, send your request to your principal inspector or responsible Flight Standards Office, as appropriate. If sending information directly to the manager of the certification office, send it to the attention of the person identified in paragraph (k)(1) of this AD. Information may be emailed to:
[email protected]. (2) Before using any approved AMOC, notify your appropriate principal inspector, or lacking a principal inspector, the manager of the responsible Flight Standards Office. (3) An AMOC that provides an acceptable level of safety may be used for any repair, modification, or alteration required by this AD if it is approved by The Boeing Company Organization Designation Authorization (ODA) that has been authorized by the Manager, Seattle ACO Branch, FAA, to make those findings. To be approved, the repair method, modification deviation, or alteration deviation must meet the certification basis of the airplane, and the approval must specifically refer to this AD. (k) Related Information (1) For more information about this AD, contact James Laubaugh, Aerospace Engineer, Propulsion Section, FAA, Seattle ACO Branch, 2200 South 216th St., Des Moines, WA 98198; phone and fax: 206-231-3622; email:
[email protected]. (2) Service information identified in this AD that is not incorporated by reference is available at the addresses specified in paragraphs (l)(3) and (4) of this AD. (l) Material Incorporated by Reference (1) The Director of the Federal Register approved the incorporation by reference (IBR) of the service information listed in this paragraph under 5 U.S.C. 552(a) and 1 CFR part 51. (2) You must use this service information as applicable to do the actions required by this AD, unless the AD specifies otherwise. (i) Boeing Alert Requirements Bulletin 777-71A0092 RB, dated January 13, 2022. (ii) Pratt & Whitney Alert Service Bulletin PW4G-112-A72-361, dated October 15, 2021. (3) For Boeing service information identified in this AD, contact Boeing Commercial Airplanes, Attention: Contractual & Data Services (C&DS), 2600 Westminster Blvd., MC 110-SK57, Seal Beach, CA 90740-5600; telephone 562-797-1717; internet https://www.myboeingfleet.com. For Pratt & Whitney service information identified in this AD contact Pratt & Whitney Division, 400 Main Street, East Hartford, CT 06118; phone: 860-565-0140; email:
[email protected] ; website: https://connect.prattwhitney.com. (4) You may view this service information at the FAA, Airworthiness Products Section, Operational Safety Branch, 2200 South 216th St., Des Moines, WA. For information on the availability of this material at the FAA, call 206-231-3195. (5) You may view this service information that is incorporated by reference at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA,
[email protected], or go to: https://www.archives.gov/federal-register/cfr/ibr-locations.html. Issued on March 4, 2022. Lance T. Gant, Director, Compliance & Airworthiness Division, Aircraft Certification Service. [FR Doc. 2022-05309 Filed 3-9-22; 4:15 pm]BILLING CODE 4910-13-P