Adoption of the Amendment \n\n\n\tAccordingly, under the authority delegated to me by the Administrator, the FAA amends 14 CFR part 39 as follows: \n\nPART 39--AIRWORTHINESS DIRECTIVES \n\n0 1. The authority citation for part 39 continues to read as follows: \n\n\n\tAuthority: 49 U.S.C. 106(g), 40113, 44701. \n\n\n\nSec. 39.13 (Amended) \n\n0 2. The FAA amends Sec. 39.13 by adding the following new airworthiness directive (AD): \n\n2012-05-02 The Boeing Company: Amendment 39-16974; Docket No. FAA- 2010-0858; Directorate Identifier 2010-NM-183-AD. \n\n(a) Effective Date \n\n\n\tThis AD is effective May 10, 2012. \n\n(b) Affected ADs \n\n\n\tNone. \n\n(c) Applicability \n\n\n\tThis AD applies to The Boeing Company Model 737-600, -700, - 700C, -800, and -900 series airplanes; certificated in any category; as identified in Boeing Service Bulletin 737-78-1082, dated March 25, 2010. \n\n(d) Subject \n\n\n\tAir Transport Association (ATA) of America Code 78: Engine exhaust. \n\n(e) Unsafe Condition \n\n\n\tThis AD results from reports of heat damage to the inner wall of the thrust reversers. The Federal Aviation Administration is issuing this AD to detect and correct such heat damage, which could result in separation of adjacent components and consequent structural damage to the airplane, damage to other airplanes, and injury to people on the ground. \n\n(f) Compliance \n\n\n\tYou are responsible for having the actions required by this AD performed within the compliance times specified, unless the actions have already been done. \n\n(g) Modification of Thrust Reverser Inner Wall \n\n\n\tExcept as required by paragraph (m) of this AD: Within 24 months after the effective date of this AD, modify the thrust reverser inner wall, in accordance with the Accomplishment Instructions of Boeing Service Bulletin 737-78-1082, dated March 25, 2010. \n\n(h) Actions Concurrent With Paragraph (g) of This AD \n\n\n\tBefore or concurrently with accomplishment of the requirements of paragraph (g)of this AD, do the actions specified in paragraphs (h)(1) and (h)(2) of this AD, as applicable. \n\t(1) For airplanes identified in Boeing Service Bulletin 737-78- 1063, Revision 2, dated October 7, 1999: Replace the inner wall blanket insulation, in accordance with the Accomplishment Instructions of Boeing Service Bulletin 737-78-1063, Revision 2, dated October 7, 1999. \n\t(2) For airplanes equipped with engines identified in CFM CFM56- 7B Service Bulletin 73-0135, dated March 30, 2007: Install updated full-authority digital electronic control (FADEC) software, in accordance with the Accomplishment Instructions of CFM CFM56-7B Service Bulletin 73-0135, dated March 30, 2007. \n\n(i) Inspection/Measurement \n\n\n\tAt the applicable time specified in paragraph (j) of this AD: Do the actions specified in paragraphs (i)(1), (i)(2), and (i)(3) of this AD, in accordance with the Accomplishment Instructions of Boeing Service Bulletin 737-78-1088, dated May 12, 2010. If any damage or discrepancyis found, before further flight, do all applicable corrective actions, in accordance with Accomplishment Instructions of Boeing Service Bulletin 737-78-1088, dated May 12, 2010; except as required by paragraph (k) of this AD; and except where the service bulletin refers to ''unsatisfactory'' findings, this AD assumes those parts or locations are ''unserviceable.'' \n\t(1) Do a detailed inspection for damage of the engine side and inner wall side of the upper and lower insulation blankets. \n\t(2) Measure the electrical conductivity on the aluminum upper compression pads 2 and 3, as applicable. \n\t(3) Inspect for discrepancies of the thrust reverser inner wall (including an ultrasonic inspection for interply delamination and skin-to-core disbond, a detailed inspection for signs of heat damage as applicable, and a detailed inspection for loose fasteners where the inner wall attaches to the hinge beam and at the fasteners for the compression pads). \n\n(j) Compliance Times for Paragraph (i) of This AD \n\n\n\tDo the actions specified in paragraph (i) of this AD at the applicable time specified in paragraph (j)(1), (j)(2), (j)(3), (j)(4), or (j)(5) of this AD. \n\t(1) For airplanes with thrust reverser part number (P/N) 315A2295-003 through 315A2295-154 inclusive: Do the actions within 30 months after the effective date of this AD. \n\t(2) For airplanes with thrust reverser P/N 315A2295-155 through 315A2295-174 inclusive: Do the actions within 60 months after the effective date of this AD. \n\t(3) For airplanes with thrust reverser P/N 315A2295-175 through 315A2295-190 inclusive: Do the actions within 72 months after the effective date of this AD. \n\t(4) For airplanes with thrust reverser P/N 315A2295-191 through 315A2295-198 inclusive: Do the actions within 84 months after the effective date of this AD. \n\t(5) For airplanes with thrust reverser P/N 315A2295-199 through 315A2295-202 inclusive: Do the actions within 96 months after the effective date of this AD. \n\n(k) Exception to Boeing Service Bulletin 737-78-1088 Procedures \n\n\n\tWhere Boeing Service Bulletin 737-78-1088, dated May 12, 2010, specifies to contact Boeing for appropriate action, repair before further flight in accordance with a method approved by the Manager, Seattle Aircraft Certification Office (ACO), FAA. For a repair method to be approved, the repair must meet the certification basis of the airplane, and the approval must specifically refer to this AD. \n\n((Page 20515)) \n\n(l) Concurrent Actions for Paragraph (i) of This AD \n\n\n\tFor airplanes identified in Boeing Service Bulletin 737-78-1069, Revision 4, dated June 16, 2005: Before or concurrently with the accomplishment of the requirements of paragraph (i) of this AD, modify the thrust reverser inner wall and insulation blankets, in accordance with the Accomplishment Instructions of Boeing Service Bulletin 737-78-1069, Revision 4, dated June 16, 2005. This paragraph provides credit for the actions specified in Boeing Service Bulletin 737-78-1069, Revision 4, dated June 16, 2005, if those actions were performed before the effective date of this AD using Boeing Service Bulletin 737-78-1069, Revision 1, dated June 13, 2002; Revision 2, dated February 6, 2003; or Revision 3, dated August 5, 2004. \n\n(m) Concurrent Actions for Paragraph (i) of This AD Done Before the Compliance Time for paragraph (g) of This AD \n\n\n\tIf the actions required by paragraph (i) of this AD are done before the compliance time specified in paragraph (g) of this AD: Before or concurrently with the accomplishment of the actions required by paragraph (i) of this AD, the modification required by paragraph (g) of this AD must be done. \n\n(n) Option to Requirements of Paragraphs (g) and (i) of This AD \n\n\n\tAccomplishment of all of the actions (including inspections and modification) specified in Boeing Service Bulletin 737-78-1079, Revision 2, dated June 7, 2010, within 24 months after the effective date of this AD, is acceptable for compliance with the requirements of paragraphs (g) and (i) of this AD; except that this AD requires removing the affected compression pads and inspecting the underlying structures regardless whether a pad assembly is made of titanium or aluminum alloy. Accomplishment of all of the actions (including inspections and modification) specified in Boeing Service Bulletin 737-78-1079, Revision 2, dated June 7, 2010, within 24 months after the effective date of this AD, is acceptable for compliance with the requirements of this AD provided applicable repairs are done before further flight, and provided the applicable actions specified in paragraphs (h)(1), (h)(2), and (l) of this AD have been done. This paragraph provides credit for the actions specified in Boeing Service Bulletin 737-78-1079, Revision 2, dated June 7, 2010, if those actions were done before the effective date of this AD using Boeing Service Bulletin 737-78-1079, dated August 6, 2007; or Revision 1, dated December 17, 2007. \n\n(o) Alternative Methods of Compliance (AMOCs) \n\n\n\t(1) The Manager, Seattle Aircraft Certification Office (ACO), FAA, has the authority to approve AMOCs for this AD, if requested using the procedures found in 14 CFR 39.19. In accordance with 14 CFR 39.19, send your request to your principal inspector or local Flight Standards District Office, as appropriate. If sending information directly to the manager of the ACO, send it to the attention of the person identified in the Related Information section of this AD. Information may be emailed to:
[email protected]. \n\t(2) Before using any approved AMOC, notify your appropriate principal inspector, or lacking a principal inspector, the manager of the local flight standards district office/certificate holding district office. \n\n(p) Related Information \n\n\n\tFor more information about this AD, contact Chris R. Parker, Aerospace Engineer, Propulsion Branch, ANM-140S, FAA, Seattle Aircraft Certification Office (ACO), 1601 Lind Avenue SW., Renton, Washington 98057-3356; phone: 425-917-6496; fax: 425-917-6590; email:
[email protected]. \n\n(q) Material Incorporated by Reference \n\n\n\t(1) You must use the following service information to do the actions required by this AD, unless the AD specifies otherwise. The Director of the Federal Register approved the incorporation by reference (IBR) of the following service information under 5 U.S.C. 552(a) and 1 CFR part 51: \n\t(i) Boeing Service Bulletin 737-78-1063, Revision 2, dated October 7, 1999. \n\t(ii) Boeing Service Bulletin 737-78-1069, Revision 4, dated June 16, 2005. \n\t(iii) Boeing Service Bulletin 737-78-1082, dated March 25, 2010. \n\t(iv) Boeing Service Bulletin 737-78-1088, dated May 12, 2010. \n\t(v) CFM CFM56-7B Service Bulletin 73-0135, dated March 30, 2007. \n\t(2) If you accomplish the optional actions specified by this AD, you must use the following service information to perform those actions, unless the AD specifies otherwise. The Director of the Federal Register approved the incorporation by reference (IBR) of the following service information: \n\t(i) Boeing Service Bulletin 737-78-1079, Revision 2, dated June 7, 2010. \n\t(3) For Boeing service information identified in this AD, contact Boeing Commercial Airplanes, Attention: Data & Services Management, P.O. Box 3707, MC 2H-65, Seattle, Washington 98124-2207; telephone 206-544-5000, extension 1; fax 206-766-5680; email
[email protected]; Internet https://www.myboeingfleet.com. For CFM service information identified in this AD, contact CFM International, Technical Publications Department, 1 Neumann Way, Cincinnati, Ohio 45215; phone: 513-552-2800; fax: 513-552-2816; Internet: http://www.cfm56.com. \n\t(4) You may review copies of the service information at the FAA, Transport Airplane Directorate, 1601 Lind Avenue SW., Renton, Washington. For information on the availability of this material at the FAA, call 425-227-1221. \n\t(5) You may also review copies of the service information that is incorporated by reference at the National Archives and Records Administration (NARA). For information on the availability of this material at an NARA facility, call 202-741-6030, or go to http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.