Show the full text (3,960 characters)
2005-18-22 Raytheon Aircraft Company: Amendment 39-14263; Docket No. FAA-2005-21239; Directorate Identifier 2005-CE-27-AD.
When Does This AD Become Effective?
(a) This AD becomes effective on November 14, 2005.
What Other ADs Are Affected by This Action?
(b) None.
What Airplanes Are Affected by This AD?
(c) This AD affects Model 390 airplanes that:
(1) Incorporate a serial number of RB-1, RB-4 through RB-84, RB- 87 through RB-90, RB-92 through RB-96, RB-98 through RB-101, and RB- 103 through RB-107; and
(2) Are certificated in any category.
What Is the Unsafe Condition Presented in This AD?
(d) This AD is the result of reports of inadequate left-hand and right-hand engine assembly cable, wire, and hose routing clearance. The actions specified in this AD are intended to detect and correct chafing conditions in the engine installation, which could result in leaking flammable fluids near an ignition source. This failure could lead to fire damage or loss of airplane control.
What Must I Do To Address This Problem?
(e) To address this problem, you must do the following:
Actions
Compliance
Procedures
Verify minimum clearances to correct chafing conditions in the powerplant left-hand and right-hand engine assembly cable, wire, and hose routing by installation of the following:
(i) If Kit No. 390 9104 0001 has already
been installed and the tube cleared successfully, then no further action is necessary.
(ii) If Kit No. 390 9104 0001 has already
been installed and clearance with the
tube was not obtained, then install Kit
No. 390 9104 0003.
(iii) If Kit No. 390 9104 0001 has not been installed, then install Kit No. 390 9104 0005.
Within the next 100 hours time-in-service (TIS) or 6 months after November 14, 2005 (the effective date of this AD), whichever occurs first. We established this compliance time to coincidewith the next regularly scheduled inspection. You may comply with this AD at any time prior to this time and not have to recomply.
Follow Raytheon Aircraft Company Mandatory Service Bulletin No. SB 71 3685, Issued May 2005, Revised: July 2005.
May I Request an Alternative Method of Compliance?
(f) You may request a different method of compliance or a different compliance time for this AD by following the procedures in 14 CFR 39.19. Unless FAA authorizes otherwise, send your request to your principal inspector. The principal inspector may add comments and will send your request to the Manager, Wichita Aircraft Certification Office (ACO), FAA. For information on any already approved alternative methods of compliance, contact James P. Galstad, Aerospace Engineer, FAA, Wichita ACO, 1801 Airport Road, Wichita, Kansas 67209; telephone: (316) 946-4135; facsimile: (316) 946-4107.
Does This AD Incorporate Any Material by Reference?
(g) You must do the actions required by this AD following the instructions in Raytheon Aircraft Company Mandatory Service Bulletin No. SB 71-3685, Rev. 1, Issued May 2005, Revised July 2005. The Director of the Federal Register approved the incorporation by reference of this service bulletin in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. To get a copy of this service information, contact Raytheon Aircraft Company, P.O. Box 85, Wichita, Kansas 67201-0085; telephone: (800) 429-5372 or 316-676-3140. To review copies of this service information, go to the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html or call (202) 741-6030. To view the AD docket, go to the Docket Management Facility; U.S. Department of Transportation, 400 Seventh Street, SW., Nassif Building, Room PL-401, Washington, DC 20590-001 or on the Internet at http://dms.dot.gov. The docket number is FAA-2005-21239; Directorate Identifier 2005-CE-27-AD.