eFlight
FAA orders · airworthiness directive · current

2004-09-13: Auxiliary power unit (APU)

FAA order 2004-09-13 is an airworthiness directive in force since June 9, 2004. The FAA's subject line: Auxiliary power unit (APU). It names Embraer EMB-135 ERJ 135 and Legacy, Embraer EMB-145 ERJ 145: about 431 aircraft on the U.S. register today across them, though an order usually covers particular versions or serial numbers rather than every one. System: engine.

What it applies to as the FAA lists it

Kind of product
Aircraft
Makes
Embraer S.A.
Models
EMB-135BJ (Legacy 600), EMB-145XR
On this site
Embraer EMB-135 ERJ 135 and Legacy 118 registered
Embraer EMB-145 ERJ 145 313 registered

Dates and paperwork

In force since
June 9, 2004
Published
May 5, 2004 (signed April 21, 2004)
Docket
2003-NM-218-AD
Status
Current
The FAA's document
Read the order on the FAA's site

The FAA's summary their words, unchanged

This amendment adopts a new airworthiness directive (AD), applicable to certain EMBRAER Model EMB-135BJ and EMB-145XR series airplanes, that requires repetitive inspections for cracking in the firewall of the auxiliary power unit (APU), and repair of the firewall if necessary. This action also provides an optional terminating action for the repetitive inspections. This action is necessary to detect and correct cracking in the APU firewall, which could result in reduced structural integrity of the firewall, and a consequent uncontained APU fire that could spread to the airplane structure. This action is intended to address the identified unsafe condition.

The order itself the regulatory text, as published

Show the full text (4,702 characters)
2004-09-13 Empresa Brasileria de Aeronautica S.A. (EMBRAER): Amendment 39-13602. Docket 2003-NM-218-AD. Applicability: Model EMB-135BJ series airplanes as listed in EMBRAER Service Bulletin 145LEG-53-0010, dated June 5, 2003; and Model EMB-145XR series airplanes as listed in EMBRAER Service Bulletin 145-53-0037, dated April 30, 2003; certificated in any category. Compliance: Required as indicated, unless accomplished previously. To detect and correct cracking in the firewall of the auxiliary power unit (APU), which could result in reduced structural integrity of the firewall, and a consequent uncontained APU fire that could spread to the airplane structure, accomplish the following: Initial Inspection (a) Within 200 flight hours or 90 days after the effective date of this AD, whichever is first: Do a detailed inspection of the APU firewall for cracking, per Part I of the Accomplishment Instructions of EMBRAER Service Bulletin 145-53-0037 (for Model EMB-145XR series airplanes), dated April 30, 2003; or Service Bulletin 145LEG-53-0010 (for Model EMB-135BJ series airplanes), dated June 5, 2003; as applicable. Note 1: For the purposes of this AD, a detailed inspection is defined as: "An intensive visual examination of a specific structural area, system, installation, or assembly to detect damage, failure, or irregularity. Available lighting is normally supplemented with a direct source of good lighting at intensity deemed appropriate by the inspector. Inspection aids such as mirror, magnifying lenses, etc., may be used. Surface cleaning and elaborate access procedures may be required." Repetitive Inspections/Repair (b) If no cracking is found during any inspection required by paragraph (a) of this AD: Repeat the inspection required by paragraph (a) of this AD thereafter at intervals not to exceed 200 flight hours or 90 days, whichever is first. Accomplishment of the replacement specified in paragraph (d) of this AD terminates therepetitive inspections required by this paragraph. (c) If any cracking is found during any inspection required by paragraph (a) of this AD: Before further flight, determine if the cracking can be repaired per Part I of the Accomplishment Instructions of EMBRAER Service Bulletin 145-53-0037, dated April 30, 2003; or Service Bulletin 145LEG-53-0010, dated June 5, 2003; as applicable. (1) If the cracking can be repaired: Before further flight, repair the cracking per Part I of the Accomplishment Instructions of the applicable service bulletin. Repeat the inspection required by paragraph (a) of this AD thereafter at intervals not to exceed 200 flight hours or 90 days, whichever is first. (2) If the cracking cannot be repaired: Before further flight, replace the APU firewall with a new firewall by accomplishing all of the actions per Part II of the Accomplishment Instructions of the applicable service bulletin. Accomplishment of the replacement terminates the repetitive inspections required by paragraphs (b) and (c)(1) of this AD. Optional Terminating Action (d) Replacement of the APU firewall with a new firewall by accomplishing all of the actions per Part II of the Accomplishment Instructions of EMBRAER Service Bulletin 145-53-0037, dated April 30, 2003; or 145LEG-53-0010, dated June 5, 2003; as applicable; constitutes terminating action for the repetitive inspections required by paragraphs (b) and (c)(1) of this AD. Alternative Methods of Compliance (e) In accordance with 14 CFR 39.19, the Manager, International Branch, ANM-116, Transport Airplane Directorate, FAA, is authorized to approve alternative methods of compliance for this AD. Incorporation by Reference (f) The actions shall be done in accordance with of EMBRAER Service Bulletin 145-53-0037, dated April 30, 2003; or EMBRAER Service Bulletin 145LEG-53-0010, dated June 5, 2003; as applicable. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies may be obtained from Empresa Brasileira de Aeronautica S.A. (EMBRAER), P.O. Box 343--CEP 12.225, Sao Jose dos Campos--SP, Brazil. Copies may be inspected at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030 or go to http://www.nara.gov/federal_register/code_of_federal_regulations/ibr_locations.html . Note 2: The subject of this AD is addressed in Brazilian airworthiness directive 2003-07-02, dated August 18, 2003. Effective Date (g) This amendment becomes effective on June 9, 2004.

Related safety bulletins advice on the same designs, not orders

2021-09-16AIR-21-15R1 · Navigation System
2021-08-26AIR-21-15 · Navigation System
2020-11-03AIR-20-17 · Air Conditioning - Cabin Pressure Control System
2019-12-05NM-19-17 · Ice and Rain Protection: Electrical Wiring Terminations at Pitot and TAT Relays
2010-01-07NM-10-13 · Navigation: Flight Management System

Source: FAA Dynamic Regulatory System, airworthiness directives. The FAA's document is the authority; the register counts are this site's, from the FAA register of November 24, 2026. Connections as data: /graph/directive/2004-09-13.json · aircraft systems.

Aircraft

By kindModelsMakersEnginesFleetsWhat changed

Fly

Plan a flightAirportsLive mapRoutes and flightsFuels

Training and work

TrainingFlight schoolsGround schoolsPilot examinersMedical examinersJobs

Companies

DirectoryCharter operatorsFBOsRepair stationsClaim your listing

Safety and data

AccidentsRecords checkAnalyticsSAFxCHANGEThe graphAbout

Colours follow your device's light or dark setting.