Show the full text (6,277 characters)
2004-05-03 McDonnell Douglas: Amendment 39-13497. Docket 2003-NM- 122-AD. \n\n\tApplicability: Model DC-9-81 (MD-81), DC-9-82 (MD-82), DC-9-83 (MD-83), and DC-9-87 (MD-87) airplanes; and Model MD-88 airplanes; as listed in Boeing Alert Service Bulletin MD80-32A344, Revision 2, dated January 28, 2004; and Model MD-90-30 airplanes, as listed in Boeing Alert Service Bulletin MD90-32A059, dated January 28, 2004; certificated in any category. \n\n\tCompliance: Required as indicated, unless accomplished previously. \n\n\tTo prevent failure of the shock strut cylinders of the main landing gears (MLG) due to cracking, which could result in collapse of the MLG and consequent reduced controllability of the airplane during landing; accomplish the following: \n\nService Bulletin Reference \n\n\t(a) The term "service bulletin," as used in this AD, means the Accomplishment Instructions of the following service bulletins, as applicable: \n\n\t(1) For Model DC-9-81 (MD-81), DC-9-82 (MD-82), DC-9-83 (MD-83), and DC-9-87 (MD-87) airplanes; and Model MD-88 airplanes: Boeing Alert Service Bulletin MD80-32A344, Revision 2, dated January 28, 2004. \n\n\t(2) For Model MD-90-30 airplanes: Boeing Alert Service Bulletin MD90-32A059, dated January 28, 2004. \n\nRecords Verification \n\n\t(b) For Group 1 airplanes as defined in the applicable service bulletin: Within 450 landings or 90 days after the effective date of this AD, whichever occurs first, perform a verification of airplane records to determine in which Group the airplane is specified (as defined in the applicable service bulletin). Per the applicable service bulletin, this verification is based on the service history of the shock strut cylinder of the MLG. \n\n\t(1) If it can be positively verified from airplane records that the airplane is identified as a Group 2 airplane, per the applicable service bulletin, no inspections are required on that airplane. \n\n\t(2) If it cannot be positively verified from airplane records that the airplane is identified as a Group 2 airplane, per the applicable service bulletin, the airplane is a Group 3 airplane, and the requirements of paragraph (c) of this AD must be accomplished at the time specified in paragraph (c) of this AD. \n\nInspections \n\n\t(c) For Group 3 airplanes, as defined in the applicable service bulletin: Within 450 landings or 90 days after the effective date of this AD, whichever occurs first, do fluorescent dye penetrant and fluorescent magnetic particle non-destructive testing (NDT) inspections to detect cracking of the shock strut cylinders on the MLGs per the applicable service bulletin. Repeat the inspections of each shock strut cylinder thereafter at intervals not to exceed 450 landings on the shock strut cylinder. \n\nCorrective Action \n\n\t(d) For Group 3 airplanes as defined in the applicable service bulletin: Do the requirements of paragraph (d)(1), (d)(2), or (d)(3) of this AD at the times specified, per the applicable service bulletin. \n\n\t(1) If a crack indication is not found by the inspections done per paragraph (c) of this AD, perform repetitive inspections as specified in paragraph (c) of this AD. \n\n\t(2) If a crack indication is found, prior to further flight, do related investigative actions per the applicable service bulletin. If cracking is not confirmed, perform repetitive inspections as specified in paragraph (c) of this AD. \n\n\t(3) If any cracking is confirmed per the investigative actions done in paragraph (d)(2) of this AD, prior to further flight, do paragraph (d)(3)(i) or (d)(3)(ii) of this AD. \n\n\t(i) Replace the cracked shock strut cylinder with a serviceable shock strut cylinder, and do paragraph (b) of this AD. \n\n\t(ii) Replace the affected left or right shock strut cylinder with a new shock strut cylinder, which constitutes terminating action for the repetitive inspection requirement in paragraph (c) of this AD for that shock strut cylinder. \n\nCredit for Previous Service Bulletin Revision \n\n\t(e) For Model DC-9-81 (MD-81), DC-9-82 (MD-82), DC-9-83 (MD-83), and DC-9-87 (MD-87) airplanes; and Model MD-88 airplanes: Accomplishment of the requirements of this AD prior to the effective date of this AD per Boeing Alert Service Bulletin MD80-32A344, dated March 31, 2003; or Boeing Alert Service Bulletin MD80-32A344, Revision 1, dated December 17, 2003; is considered acceptable for compliance with the initial inspection required in paragraph (c) of this AD, and/or replacement actions required by paragraph (d) of this AD, as applicable. The repetitive inspection interval remains 450 landings for the repetitive inspections. \n\nParts Installation \n\n\t(f) As of the effective date of this AD, no person shall install on any airplane a shock strut cylinder of the MLG unless that part has been inspected and found to be crack-free, in accordance with the applicable service bulletin. \n\nAlternative Methods of Compliance \n\n\t(g) In accordance with 14 CFR 39.19, the Manager, Los Angeles Aircraft Certification Office, FAA, is authorized to approve alternative methods of compliance (AMOCs) for this AD. \n\n\tNote 1: Information concerning the existence of approved AMOCs for this AD, if any, may be obtained from the Los Angeles ACO. \n\nIncorporation by Reference \n\n\t(h) Unless otherwise specified in this AD, the actions shall be done in accordance with Boeing Alert Service Bulletin MD80-32A344, Revision 2, dated January 28, 2004; or Boeing Alert Service Bulletin MD90-32A059, dated January 28, 2004; as applicable. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies may be obtained from Boeing Commercial Airplanes, Long Beach Division, 3855 Lakewood Boulevard, Long Beach, California 90846, Attention: Data and Service Management, Dept. C1-L5A (D800- 0024). Copies may be inspected at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the FAA, Los AngelesAircraft Certification Office, 3960 Paramount Boulevard, Lakewood, California; or at the Office of the Federal Register, 800 North Capitol Street, NW., suite 700, Washington, DC. \n\nEffective Date \n\n\t(i) This amendment becomes effective on March 15, 2004.