eFlight
FAA orders · airworthiness directive · historical

2002-07-12: Life Limits Section of Continued Airworthiness (ICA) - Selected Critical Life-limited Parts

FAA order 2002-07-12 is an airworthiness directive in force since May 15, 2002. The FAA's subject line: Life Limits Section of Continued Airworthiness (ICA) - Selected Critical Life-limited Parts. It names the General Electric CF6-80 series, General Electric CF6-80A, General Electric CF6-80A2, General Electric CF6-80C2A1, General Electric CF6-80C2A5, General Electric CF6-80C2A5F, General Electric CF6-80C2B1, General Electric CF6-80C2B1F, General Electric CF6-80C2B1F1, General Electric CF6-80C2B2, General Electric CF6-80C2B4, General Electric CF6-80C2B4F, General Electric CF6-80C2B5F, General Electric CF6-80C2B6, General Electric CF6-80C2B6F, General Electric CF6-80C2B6FA, General Electric CF6-80C2B7F, General Electric CF6-80C2B8F, General Electric CF6-80C2D1F, General Electric CF6-80E1A4 engines: about 643 aircraft on the U.S. register today across them, though an order usually covers particular versions or serial numbers rather than every one. System: engine.

What it applies to as the FAA lists it

Kind of product
Engine
Makes
General Electric Company
Models
CF6-80A, CF6-80A1, CF6-80A2, CF6-80A3, CF6-80C2A1, CF6-80C2A2, CF6-80C2A3, CF6-80C2A5, CF6-80C2A5F, CF6-80C2A8, CF6-80C2B1, CF6-80C2B1F, CF6-80C2B1F1, CF6-80C2B1F2, CF6-80C2B2, CF6-80C2B2F, CF6-80C2B3F, CF6-80C2B4, CF6-80C2B4F, CF6-80C2B5F, CF6-80C2B6, CF6-80C2B6F, CF6-80C2B6FA, CF6-80C2B7F, CF6-80C2B8F, CF6-80C2D1F, CF6-80E1A1, CF6-80E1A2, CF6-80E1A3, CF6-80E1A4
Engine series
General Electric CF6-80 series 238 aircraft
General Electric CF6-80A 9 aircraft
General Electric CF6-80A2 5 aircraft
General Electric CF6-80C2A1 2 aircraft
General Electric CF6-80C2A5 3 aircraft
General Electric CF6-80C2A5F 6 aircraft
General Electric CF6-80C2B1 1 aircraft
General Electric CF6-80C2B1F 37 aircraft
General Electric CF6-80C2B1F1 1 aircraft
General Electric CF6-80C2B2 2 aircraft
General Electric CF6-80C2B4 1 aircraft
General Electric CF6-80C2B4F 1 aircraft
General Electric CF6-80C2B5F 4 aircraft
General Electric CF6-80C2B6 25 aircraft
General Electric CF6-80C2B6F 261 aircraft
General Electric CF6-80C2B6FA 1 aircraft
General Electric CF6-80C2B7F 10 aircraft
General Electric CF6-80C2B8F 2 aircraft
General Electric CF6-80C2D1F 24 aircraft
General Electric CF6-80E1A4 10 aircraft

Dates and paperwork

In force since
May 15, 2002
Published
April 10, 2002 (signed April 3, 2002)
Docket
98-ANE-49-AD
Replaces
2000-08-12
Replaced by
2009-04-10
Status
Historical
The FAA's document
Read the order on the FAA's site

The FAA's summary their words, unchanged

This amendment supersedes an existing airworthiness directive (AD), that is applicable to General Electric Company (GE) CF6-80A, CF6- 80C2, and CF6-80E1 series turbofan engines. That AD currently requires revisions to the Life Limits Section of the manufacturer's Instructions for Continued Airworthiness (ICA) to include required inspection of selected critical life-limited parts at each piece-part exposure. This amendment adds additional mandatory inspections for certain high pressure compressor (HPC), low pressure turbine (LPT), and high pressure turbine (HPT) parts. The mandatory inspections are needed to identify those critical rotating parts with conditions, which if allowed to continue in service, could result in uncontained failures. The actions specified by this AD are intended to prevent critical life- limited rotating engine part failure, which could result in an uncontained engine failure and damage to the airplane.

The order itself the regulatory text, as published

Show the full text (11,699 characters)
2002-07-12 General Electric Company: Amendment 39-12707. Docket No. 98-ANE-49-AD. Supersedes AD 2000-08-12, Amendment 39-11698 Applicability This airworthiness directive (AD) is applicable to General Electric Company (GE) CF6-80A, CF6-80C2, and CF6-80E1 series turbofan engines, installed on but not limited to Airbus Industrie A300, A310, and A330 series, Boeing 747 and 767 series, and McDonnell Douglas MD-11 series airplanes. Note 1: This AD applies to each engine identified in the preceding applicability provision, regardless of whether it has been modified, altered, or repaired in the area subject to the requirements of this AD. For engines that have been modified, altered, or repaired so that the performance of the requirements of this AD is affected, the owner/operator must request approval for an alternative method of compliance in accordance with paragraph (c) of this AD. The request should include an assessment of the effect of the modification, alteration, or repair on the unsafe condition addressed by this AD; and, if the unsafe condition has not been eliminated, the request should include specific proposed actions to address it. Compliance Compliance with this AD is required as indicated, unless already done. To prevent critical life-limited rotating engine part failure, which could result in an uncontained engine failure and damage to the airplane, accomplish the following: Inspections (a) Within the next 30 days after the effective date of this AD, revise the manufacturer's Life Limits Section of the Instructions for Continued Airworthiness (ICA), and for air carrier operations revise the approved continuous airworthiness maintenance program, by adding the following: "MANDATORY INSPECTIONS" (1) Perform inspections of the following parts at each piece- part opportunity in accordance with the instructions provided in the applicable manual provisions: Part nomenclature Part No. (P/N) Inspect per engine manual chapter For CF6-80A Engines: Disk, Fan Rotor, Stage 1 All 72-21-03 Paragraph 3. Fluorescent-Penetrant Inspect, and 72-21-03 Paragraph 4. Eddy Current Inspect. Fan Forward Shaft All 72-21-05 Paragraph 2. Magnetic Shaft Particle Inspect. Fan Mid Shaft All 72-24-01 Paragraph 2. Magnetic Particle Inspect. Disk, HPC Rotor, Stage One All 72-31-04 Paragraph 3. Fluorescent-Penetrant Inspect. Disk, HPC Rotor, Stage Two All 72-31-05 Paragraph 3. Fluorescent-Penetrant Inspect. Spool, HPC Rotor, Stage 3-9 All 72-31-06 Paragraph 3. Fluorescent-Penetrant Inspect. Disk, HPC Rotor, Stage 10 All 72-31-07 Paragraph 3. Fluorescent-Penetrant Inspect. Spool, HPC Rotor, Stage 11-14 All 72-31-08 Paragraph 3.A. Fluorescent-Penetrant Inspect. Rotating CDP Seal All 72-31-10 Paragraph 3. Fluorescent-Penetrant Inspect. Disk Shaft, HPT Rotor, Stage One All 72-53-02 Paragraph 3. Fluorescent-Penetrant-Inspect per 70-32-02, and 72-53-02 Paragraph 6.C. Eddy Current Inspection, and 72-53-02 Paragraph 6.D. Disk Bore Area Eddy Current Inspection. Disk, HPT Rotor, Stage Two All 72-53-06 Paragraph 3. Fluorescent-Penetrant Inspection, and 72-53-06 Paragraph 6. Eddy Current Inspection of Rim Boltholes for Cracks, and 72-53-06 Paragraph 7. Disk Bore Area Eddy Current Inspection. Disk, LPT Rotor Stage, 1-4 All 72-57-02 Paragraph 3. Fluorescent-Penetrant Inspection. Shaft, LPT Rotor All 72-57-03 Paragraph 3. Fluorescent- Penetrant Inspection, and 72-57-03 Paragraph 6. Eddy Current Inspection. For All CF6-80C2 Engines: Disk, Fan Rotor, Stage 1 All Task 72-21-03-200-000-004 Fluorescent-Penetrant Inspection, and Task 72-21-03-200-000-008 Eddy Current Inspect Fan Rotor Disk Stage 1 Bore, Forward and Aft Hub Faces, and Bore Radii. Shaft, Fan Forward All Task 72-21-05-200-000-001 Fluorescent-Penetrant Inspection, and Task 72-21-05-200-000-005 Vent Hole Eddy Current Inspection. HPCR Stage 1 Disk All Task 72-31-04-200-000-002 Fluorescent-Penetrant Inspection. HPCR Stage 2 Disk All Task 72-31-05-200-000-002 Fluorescent-Penetrant Inspection. HPCR Stage 3-9 Spool All Task 72-31-06-200-000-001 Fluorescent-Penetrant Inspection. HPCR Stage 10 Disk All Task 72-31-07-200-000-001 Fluorescent-Penetrant Inspection. HPCR Stage 11-14 Spool/Shaft All Task 72-31-08-200-000-002 Fluorescent-Penetrant Inspection. No. 4 Bearing Rotating (CDP) Air Seal All Task 72-31-10-200-000-001 Fluorescent-Penetrant Inspection or Task 72-31-10-200-000-A01 Fluorescent-Penetrant Inspection. HPCR Stage 10-14 Spool/Shaft All Task 72-31-22-200-000-002 Fluorescent-Penetrant Inspection. Fan Mid Shaft All Task 72-24-01-200-000-003 Magnetic Particle Inspection. Disk Shaft, HPT Rotor, Stage One All Task 72-53-02-200-000-001 Fluorescent-Penetrant Inspect, and Task 72-53-02-200-000-005 Disk Rim Bolt Hole Eddy Current Inspection, and Task 72-53-02-200-000-006 Disk Bore Area Eddy Current Inspection, and Task 72-53-02-200-000-007 Disk Dovetail Slot Bottom Eddy Current Inspection. Disk, HPT Rotor, Stage Two All Task 72-53-06-200-000-002 Fluorescent-Penetrant Inspect, and Task 72-53-06-200-000-006 Disk Rim Bolt Hole Eddy Current Inspection Rim Boltholes, and Task 72-53-06-200-000-007 Disk Bore Area Eddy Current Inspection. LPTR Stage 1-5 Disks All Task 72-57-02-200-000-001 Fluorescent-Penetrant Inspection. LPTR Shaft All Task 72-57-03-200-000-002 Fluorescent-Penetrant Inspect, and Task 72-57-03-200-000-006 Eddy Current Inspection. For CF6-80C2 Engines configured with the R88DT Turbine (Models CF6-80C2B2F, 80C2B4F, 80C2B6F, 80C2B7F, 80C2B8F): Disk Shaft, HPT Rotor, Stage One (R88DT, No Rim Bolt Holes). All Task 72-53-16-200-000-001 Fluorescent-Penetrant Inspect, and Task 72-53-16-200-000-005 Disk Bore Area Eddy Current Inspection. Disk, HPT Rotor, Stage Two (R88DT, No Rim Bolt Holes). All Task 72-53-18-200-000-002 Fluorescent-Penetrant Inspect, and Task 72-53-18-200-000-005 Disk Bore Area Eddy Current Inspection. Rotating Interstage Seal (R88DT) All Task 72-53-17-200-000-001 Fluorescent-Penetrant Inspect, and Task 72-53-17-200-000-005 Seal Bore Area Eddy Current. Forward Outer Seal (R88DT) All Task 72-53-21-200-000-001 Fluorescent-Penetrant Inspect, and Task 72-53-21-200-000-004 Seal Bore Area Eddy Current. For CF6-80E1 Engines: Disk, Fan Rotor, Stage One All Sub Task 72-21-03-230-051 Fluorescent-Penetrant Inspection, and Sub Task 72-21-03-250-051 or 72-21-03-250-052 Disk Bore Eddy Current Inspection. Shaft, Fan Forward All Sub Task 72-21-05-230-051 Fluorescent-Penetrant Inspection, and Sub Task 72-21-05-250-051 Vent Hole Eddy Current Inspection. Compressor Rotor, Stage 1 Disk All Sub Task 72-31-04-230-051 Fluorescent-Penetrant Inspection. Compressor Rotor, Stage 2 Disk All Sub Task 72-31-05-230-051 Fluorescent-Penetrant Inspection. Compressor Rotor, Stage 3-9 Spool All Sub Task 72-31-06-230-051 Fluorescent-Penetrant Inspection. Compressor Rotor, Stage 10 Disk (Pre SB 72-0150). All Sub Task 72-31-07-230-051 Fluorescent-Penetrant Inspection. Compressor Rotor, Spool/Shaft, Stage 11-14 (Pre SB 72-0150). All Sub Task 72-31-08-230-051 Fluorescent-Penetrant Inspection Compressor Rotor, Spool/Shaft, Stage 10-14 (SB 72-0150). All Sub Task 72-31-23-230-052 Fluorescent-Penetrant Inspection. Compressor Rotor, No. 4 Bearing Rotating Air Seal (CDP Rotating Seal). All Sub Task 72-31-10-230-051 Fluorescent-Penetrant Inspection. HPT Disk/Shaft, Stage 1 All Sub Task 72-53-02-230-051 Fluorescent-Penetrant Inspection, and Sub Task 72-53-02-250-051 Eddy Current Inspection, Rim Bolt Holes, and Sub Task 72-53-02-250-054 Eddy Current Inspection, Disk Bore Area. HPT Disk, Stage 2 All Sub Task 72-53-06-230-051 Fluorescent-Penetrant Inspection, and Sub Task 72-53-06-250-051 Eddy Current Inspection, Rim Bolt Holes, and Sub Task 72-53-06-250-054 Eddy Current Inspection, Disk Bore Area. LPT Rotor Shaft All Sub Task 72-55-01-240-051 Magnetic Particle Inspect.LPT Disks, Stages 1-5 All Sub Task 72-57-02-230-051 Fluorescent-Penetrant Inspect. For CF6-80E1 Engines configured with the R88DT Turbine: LPT Rotor Torque Cone All Sub Task 72-57-03-220-051 Fluorescent-Penetrant Inspect Disk Shaft, HPT Rotor All Sub Task 72-53-16-230-052 Fluorescent-Penetrant Inspect, and Sub Task 72-53-16-250-051 Disk Bore Area Eddy Current Inspection. Disk, HPT Rotor, Stage 2 (R88DT, No Rim Bolt Holes). All Sub Task 72-53-18-230-051 Fluorescent-Penetrant Inspect, and Sub Task 72-53-18-250-051 Disk Bore Area Eddy Current Inspection. HPT Rotor Rotating Interstage Seal (R88DT). All Sub Task 72-53-17-230-051 Fluorescent-Penetrant Inspect, and Sub Task 72-53-17-250-051 Seal Bore Area Eddy Current. HPT Rotor Forward Outer Seal (R88DT) All Sub Task 72-53-21-230-051 Fluorescent-Penetrant Inspect, and Sub Task 72-53-21-250-051 Seal Bore Area Eddy Current. (2) For the purposes of these mandatory inspections, piece-part opportunity means: (i) The part is considered completely disassembled when accomplished in accordance with the disassembly instructions in the manufacturer's engine manual; and (ii) The part has accumulated more than 100 cycles-in-service since the last piece-part opportunity inspection, provided that the part was not damaged or related to the cause for its removal from the engine." (b) Except as provided in paragraph (c) of this AD, and notwithstanding contrary provisions in section 43.16 of the Federal Aviation Regulations (14 CFR 43.16), these mandatory inspections shall be performed only in accordance with the Life Limits Section of the manufacturer's ICA. Alternative Methods of Compliance (c) An alternative method of compliance or adjustment of the compliance time that provides an acceptable level of safety may be used if approved by the Engine Certification Office (ECO). Operators must submit their requests through an appropriate FAA Principal Maintenance Inspector (PMI), who may addcomments and then send it to the ECO. Note 2: Information concerning the existence of approved alternative methods of compliance with this airworthiness directive, if any, may be obtained from the ECO. Continuous Airworthiness Maintenance Program (d) FAA-certificated air carriers that have an approved continuous airworthiness maintenance program in accordance with the record keeping requirement of Sec. 121.369 (c) of the Federal Aviation Regulations (14 CFR 121.369 (c)) of this chapter must maintain records of the mandatory inspections that result from revising the Life Limits Section of the Instructions for Continuous Airworthiness (ICA) and the air carrier's continuous airworthiness program. Alternately, certificated air carriers may establish an approved system of record retention that provides a method for preservation and retrieval of the maintenance records that include the inspections resulting from this AD, and include the policy and procedures for implementing this alternate method in the air carrier's maintenance manual required by Sec. 121.369 (c) of the Federal Aviation Regulations (14 CFR 121.369 (c)); however, the alternate system must be accepted by the appropriate PMI and require the maintenance records be maintained either indefinitely or until the work is repeated. Records of the piece-part inspections are not required under Sec. 121.380 (a) (2) (vi) of the Federal Aviation Regulations (14 CFR 121.380 (a) (2) (vi)). All other Operators must maintain the records of mandatory inspections required by the applicable regulations governing their operations. Note 3: The requirements of this AD have been met when the engine manual changes are made and air carriers have modified their continuous airworthiness maintenance plans to reflect the requirements in the engine manuals. Effective Date (e) This amendment becomes effective on May 15, 2002.

Source: FAA Dynamic Regulatory System, airworthiness directives. The FAA's document is the authority; the register counts are this site's, from the FAA register of November 24, 2026. Connections as data: /graph/directive/2002-07-12.json · aircraft systems.

Aircraft

By kindModelsMakersEnginesFleetsWhat changed

Fly

Plan a flightAirportsLive mapRoutes and flightsFuels

Training and work

TrainingFlight schoolsGround schoolsPilot examinersMedical examinersJobs

Companies

DirectoryCharter operatorsFBOsRepair stationsClaim your listing

Safety and data

AccidentsRecords checkAnalyticsSAFxCHANGEThe graphAbout

Colours follow your device's light or dark setting.