eFlight
FAA orders · airworthiness directive · current

2001-26-09: Water Line Heater Tape

FAA order 2001-26-09 is an airworthiness directive in force since January 31, 2002. The FAA's subject line: Water Line Heater Tape. It names Boeing 767: about 584 aircraft on the U.S. register today, though an order usually covers particular versions or serial numbers rather than every one. System: engine.

What it applies to as the FAA lists it

Kind of product
Aircraft
Makes
The Boeing Company
Models
767-200 Series
On this site
Boeing 767 584 registered

Dates and paperwork

In force since
January 31, 2002
Published
December 27, 2001 (signed December 14, 2001)
Docket
2000-NM-351-AD
Status
Current
The FAA's document
Read the order on the FAA's site

The FAA's summary their words, unchanged

This amendment adopts a new airworthiness directive (AD), applicable to certain Boeing Model 767-200 series airplanes, that requires a one-time inspection of the water line heater tape where it passes close to the duct assemblies of the air distribution system for the flight compartment to detect damage, and follow-on actions. This amendment also requires eventual replacement of certain duct assemblies or foam insulation on those duct assemblies with new duct assemblies or improved foam insulation. This action is necessary to prevent ignition of foam insulation on the air distribution ducts, which could result in a fire in the airplane. This action is intended to address the identified unsafe condition.

The order itself the regulatory text, as published

Show the full text (5,549 characters)
2001-26-09 Boeing: Amendment 39-12573. Docket 2000-NM-351-AD. \n\n\tApplicability: Model 767-200 series airplanes, as listed in Boeing Alert Service Bulletin 767-21A0154, dated March 16, 2000; certificated in any category. \n\n\tNote 1: This AD applies to each airplane identified in the preceding applicability provision, regardless of whether it has been modified, altered, or repaired in the area subject to the requirements of this AD. For airplanes that have been modified, altered, or repaired so that the performance of the requirements of this AD is affected, the owner/operator must request approval for an alternative method of compliance in accordance with paragraph (c) of this AD. The request should include an assessment of the effect of the modification, alteration, or repair on the unsafe condition addressed by this AD; and, if the unsafe condition has not been eliminated, the request should include specific proposed actions to address it. \n\n\tCompliance: Required as indicated, unless accomplished previously. \n\n\tTo prevent ignition of foam insulation on the air distribution ducts, which could result in a fire in the airplane, accomplish the following: \n\nInspection and Follow-on Actions \n\n\t(a) Within 18 months after the effective date of this AD: Do a one-time general visual inspection of the water line heater tape where it passes close to the duct assemblies of the air distribution system for the flight compartment to detect damage; including wear, chafing, pinching, discoloration, localized burn marks, etc; per the Accomplishment Instructions of Boeing Alert Service Bulletin 767-21A0154, Revision 1, dated August 9, 2001. \n\n\t\t(1) If no damage is detected, before further flight, measure the clearance between the duct assemblies and the water line heater tape. If clearance is less than 0.25 inch, before further flight, re-route the heater tape per the service bulletin. \n\n\t\t(2) If any damage is detected, before further flight, replace the heater tape with new heater tape, per the service bulletin. When installing the new tape, make sure that clearance between the water line heater tape and the duct assemblies is a minimum of 0.25 inch. \n\n\tNote 2: For the purposes of this AD, a general visual inspection is defined as: "A visual examination of an interior or exterior area, installation, or assembly to detect obvious damage, failure, or irregularity. This level of inspection is made under normally available lighting conditions such as daylight, hangar lighting, flashlight, or drop-light, and may require removal or opening of access panels or doors. Stands, ladders, or platforms may be required to gain proximity to the area being checked." \n\nReplacement \n\n\t(b) Within 6 years after the effective date of this AD, do the actions specified in paragraph (b)(1) or (b)(2) of this AD, per the Accomplishment Instructions of Boeing Alert Service Bulletin 767-21A0154, Revision 1, dated August 9, 2001. Before further flight after doing the applicable action, do a general visual inspection to make sure that clearance between the water line heater tape and the duct assemblies is a minimum of 0.25 inch. If clearance is less than 0.25 inch, before further flight, re-route the heater tape per the service bulletin. \n\n\t\t(1) Replace the duct assemblies of the air distribution system for the flight compartment (which are located under the main deck) with new duct assemblies having fiberglass insulation; or \n\n\t\t(2) Replace the existing BMS 8-39 foam insulation on the ducts of the air distribution system for the flight compartment (which are located under the main deck) with BMS 8-300 polyimide foam insulation. \n\n\tNote 3: Inspection, replacement and follow-on actions done before the effective date of this AD per Boeing Alert Service Bulletin 767-21A0154, dated March 16, 2000, are considered acceptable for compliance with the applicable actions specified in paragraphs (a) and (b) of this AD. \n\nAlternative Methods of Compliance(c) An alternative method of compliance or adjustment of the compliance time that provides an acceptable level of safety may be used if approved by the Manager, Seattle Aircraft Certification Office (ACO), FAA. Operators shall submit their requests through an appropriate FAA Principal Maintenance Inspector, who may add comments and then send it to the Manager, Seattle ACO. \n\n\tNote 4: Information concerning the existence of approved alternative methods of compliance with this AD, if any, may be obtained from the Seattle ACO. \n\nSpecial Flight Permits \n\n\t(d) Special flight permits may be issued in accordance with sections 21.197 and 21.199 of the Federal Aviation Regulations (14 CFR 21.197 and 21.199) to operate the airplane to a location where the requirements of this AD can be accomplished. \n\nIncorporation by Reference \n\n\t(e) The actions shall be done in accordance with Boeing Alert Service Bulletin 767-21A0154, Revision 1, including Appendix A, dated August 9, 2001. Thisincorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies may be obtained from Boeing Commercial Airplane Group, P.O. Box 3707, Seattle, Washington 98124-2207. Copies may be inspected at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the Office of the Federal Register, 800 North Capitol Street, NW., suite 700, Washington, DC. \n\nEffective Date \n\n\t(f) This amendment becomes effective on January 31, 2002.

Related safety bulletins advice on the same designs, not orders

2020-04-16NM-20-07 · Navigation - Glideslope System
2018-12-17NM-18-33 · Engine Fuel and Control
2017-06-19NM-17-17 · Oxygen System
2017-04-13NM-17-10 · Maintenance Practices
2017-03-09NM-17-09 · Flight Control System

Source: FAA Dynamic Regulatory System, airworthiness directives. The FAA's document is the authority; the register counts are this site's, from the FAA register of November 24, 2026. Connections as data: /graph/directive/2001-26-09.json · aircraft systems.

Aircraft

By kindModelsMakersEnginesFleetsWhat changed

Fly

Plan a flightAirportsLive mapRoutes and flightsFuels

Training and work

TrainingFlight schoolsGround schoolsPilot examinersMedical examinersJobs

Companies

DirectoryCharter operatorsFBOsRepair stationsClaim your listing

Safety and data

AccidentsRecords checkAnalyticsSAFxCHANGEThe graphAbout

Colours follow your device's light or dark setting.