ST09180AC
Installation of DeVore Wing Forward Position Lights. Held by The Boeing Company, which holds 24 approved modifications in all. Last revised October 20, 2025. System: electrical power.
What it applies to
- Kind of product
- Aircraft
- Design holder
- The Boeing Company; The Boeing Company; The Boeing Company; The Boeing Company; The Boeing Company; The Boeing Company; The Boeing Company; The Boeing Company; The Boeing Company; The Boeing Company; The Boeing Company; The Boeing Company; The Boeing Company; The Boeing Company; The Boeing Company; The Boeing Company; The Boeing Company
- Models
- DC-9-31, DC-9-32, DC-9-32 (VC-9C), DC-9-32F, DC-9-32F (C-9A), DC-9-32F (C-9B), DC-9-33F, DC-9-34, DC-9-34F, DC-9-41, DC-9-51, DC-9-81 (MD-81), DC-9-82 (MD-82), DC-9-83 (MD-83), DC-9-87 (MD-87), MD-88, MD-90-30
- Type certificates
- A6WE, A6WE, A6WE, A6WE, A6WE, A6WE, A6WE, A6WE, A6WE, A6WE, A6WE, A6WE, A6WE, A6WE, A6WE, A6WE, A6WE
- On this site
- Mcdonnell Douglas Aircraft Co MD-88 10 registered
Mcdonnell Douglas DC-9 93 registered - The FAA's record
- On the FAA's site
What an approved modification is
A supplemental type certificate is the FAA's approval of a change to a certified design: a new engine or propeller, avionics, an autopilot, floats, a parachute, a larger fuel tank, an ice-protection kit. The company holding it may sell the kit and the paperwork to owners of the listed models; the modification then becomes part of that aircraft's record. The FAA's list says what was approved and for which models, not how many aircraft carry it.
Source: FAA supplemental type certificates (Dynamic Regulatory System). Register counts from the FAA register of October 7, 2026.
