Atr ATR42 incident near Eberdeen, Outside the U.S., August 27, 2022
On August 27, 2022 at about 8:00 am local time, a 1995 Atr ATR42, registered GLMRC, was involved in an incident during initial climb near Eberdeen, Outside the U.S.. It was flown under non-U.S. commercial rules. The NTSB record does not give the injuries.
The NTSB's probable cause their words, unchanged
The NTSB has not yet published a probable cause for this incident. Investigations usually take one to two years; this page updates when the final report is released.
Source: NTSB aviation accident database, copy made October 5, 2026. Docket and reports at the NTSB.
What the record shows
- Date
- August 27, 2022 · about 8:00 am local time
- Place
- Eberdeen, United Kingdom · map
- Type
- Incident
- Injuries
- The NTSB record does not give the injuries.
- Weather
- not recorded
- Aircraft
- Atr ATR42 500, built 1995
- Registration
- GLMRC · no longer on the register · serial 480
- Damage
- Not recorded
- Flight
- Flight · non-U.S. commercial rules
The factual record from the NTSB's investigation tables, in plain English
What happened, in order
- Electrical system malf/failure during initial climb defining event
The aircraft
- Landing gear: retractable
Weather at the time
- Temperature: 0°F (-18°C), dew point 0°F (-18°C)
Documents from the investigation the NTSB's docket: the evidence folder behind the report
The NTSB has not released the docket for this case yet. The docket, the folder of records gathered during an investigation (maintenance records, photographs, witness statements, examinations), is usually released when the investigation is nearly complete, and the list here is refreshed when it appears. Check at the NTSB.
Everything on this page comes from the NTSB's public records. The narrative, probable cause and findings are the NTSB's own words; the coded tables behind the report are written out in plain English, with pilots' ages, home towns and medical details left out. The documents and photographs are the NTSB's docket, shown as the NTSB released them. This site's own text never names anyone involved. A preliminary report can change; the final report usually follows one to two years later, and the page is refreshed when it does.
